Key takeaways
- Repair and maintenance work held up better than new construction in 2026, which makes maintenance clients a steadier target[1].
- Pick two or three sectors close to your base and learn their paperwork, access rules and decision makers.
- Commercial gas work needs the right Gas Safe categories as well as business registration[2].
- Late payment is the biggest obstacle for construction SMEs, so set credit terms before the first job[3][4].
- Win one reactive job, deliver it perfectly, then propose planned maintenance.
Why commercial clients are worth the effort
Domestic work keeps most plumbing and heating firms busy, but it is lumpy. Boiler breakdowns spike in the first cold week, bathroom work follows consumer confidence, and each customer is a new relationship to win. Commercial clients behave differently. A managing agent with twenty buildings, a school trust with six sites or a dental group with four surgeries can send steady repairs and planned maintenance for years once they trust you.
Maintenance work has also been more resilient than new building. In August 2026, construction repair and maintenance output grew by 0.4% while new work fell by 0.7%[1]. Buildings still need their boilers, water heaters, toilets and drains looked after when development slows.
The trade-off is paperwork, slower payment and higher expectations on reporting. Firms that do well in commercial work set themselves up for that from the start rather than treating a business client like a large domestic one.
Sectors that suit small and mid-sized heating firms
| Sector | Typical work | Who decides | What they ask for |
|---|---|---|---|
| Offices via managing agents | Boilers, water heaters, washrooms, leaks, PPM | Property or facilities manager at the agent | RAMS, insurance, PO process, monthly reports |
| Retail and hospitality | Out-of-hours repairs, water heaters, washrooms, kitchen plumbing | Area manager or FM company | Fast response, night access, permit to work |
| Schools and academies | Heating plant, washrooms, water hygiene tasks | Business manager or trust estates lead | DBS approach, term-time rules, safeguarding policy |
| Care homes | Hot water safety, TMVs, heating, legionella tasks | Home manager or group maintenance lead | Scald control knowledge, DBS, infection control |
| Dental and GP surgeries | Water heaters, washrooms, small plant | Practice manager | Minimal disruption, clinic-hours scheduling |
| Light industrial units | Heating, welfare facilities, drainage | Owner or landlord's agent | Insurance, site induction, asbestos awareness |
| Churches and community buildings | Old heating systems, intermittent use | Trustees or volunteer property lead | Clear quotes, patience with committees |
Some sectors need extra safety knowledge. Care homes and schools come with scald, legionella and safeguarding rules; see plumbing in schools and care homes. Restaurants bring grease and drainage work; see commercial kitchen plumbing.
Choosing your first two sectors
Trying to sell to every type of business at once dilutes your effort. Score each sector against these questions and pick the two with the highest score.
- Density: are there at least thirty buildings of this type within thirty minutes of your base?
- Skills match: do your engineers already have the gas categories and experience the sector needs?
- Hours: can you work the hours the sector needs, such as nights for retail or holidays for schools?
- Payment: does the sector have a reputation for paying on time, and can you check credit before you start?
- Reach: can you identify who decides and get in front of them?
- Repeat potential: will one good job lead to planned maintenance or a wider contract?
The paperwork commercial clients ask for
Expect a pack of documents before the first job, and keep it ready as a single folder you can send the same day. Clients use it to protect themselves from accidents, insurance gaps and poor work, and an incomplete pack sends you to the bottom of the list.
- Risk assessments and method statements for typical tasks, such as boiler replacement, hot works and working in plant rooms.
- Insurance certificates for employer's liability and public liability, at or above the client's minimum.
- Gas Safe registration details and each engineer's work categories, including commercial ones where relevant.
- Health and safety policy and, often, a recognised third-party safety accreditation.
- Asbestos awareness training records for anyone working in older buildings.
- Data protection and cyber security answers if you will use the client's systems or hold residents' data.
- A standard job sheet, photo record and invoice format that quotes the client's purchase order.
On gas, the law allows only businesses in the HSE-approved class to work on gas fittings, which in practice is the Gas Safe Register[2], and clients will check that each engineer holds the right categories for the appliance. On cyber, 43% of UK businesses reported a breach or attack in the year before the 2025 survey[5], which is why more clients now ask. Our guide to pre-qualification and accreditation explains each requirement.
Reaching the people who decide
Build a target list
List fifty buildings in your chosen sectors. For each, note the occupier, the landlord and the managing agent or FM company, which is often on the building's sign board or the agent's website.
Find the right role
Look for job titles such as property manager, facilities manager, estates manager, business manager or practice manager. These people buy maintenance; directors usually do not.
Send a short introduction
Write three or four sentences: what you do, where you work, one relevant credential and a clear offer, such as an emergency contact number or a free condition check on their boiler plant.
Follow up by phone
Call a week later. Ask who handles their plumbing and heating today and what happens when that firm cannot attend quickly.
Get onto the approved list
Ask what the onboarding process is. Many agents keep a list of approved contractors and will add a firm that completes the paperwork, even before there is a job.
A simple call opener: "Hello, it is [your name] from [your firm]. We look after boilers and plumbing for offices and surgeries in this part of town. I am calling to ask who you use when a heating or water fault needs someone the same day, and whether you keep a back-up contractor." The aim is a conversation about their pain points, not a hard sell.
What commercial clients judge you on
A homeowner judges you on the visit. A commercial client judges you on the record. The facilities manager has to explain every job to an occupier, a landlord or a finance team, so the firms that get repeat work are the ones that make that explanation easy.
- Response: did you attend inside the agreed time, and did you tell the site contact when you were on the way?
- Communication: did the client hear about delays, parts orders and access problems before they had to chase?
- Close-out: did a report with photographs, readings and next steps arrive the same day?
- Accuracy: does the invoice match the purchase order, the job reference and the agreed rates?
- Behaviour on site: did engineers sign in, wear ID, respect alarm and access rules and leave the area clean?
Price commercial work on a clear rate card: an hourly rate for normal hours, a higher rate for out-of-hours attendance, a minimum charge, a parts mark-up and a travel or parking policy for city centre sites. Clients compare rate cards, so make yours simple to read. For a fuller method, see pricing commercial plumbing work.
Set credit terms before the first job
Commercial clients often pay at 30 days or longer, and some pay late. 45% of construction SME employers named late payment as a major obstacle in 2025, up from 36% in 2024[3]. Across all sectors, late payment was a problem for 63% of SME employers that gave trade credit[6].
Source: Department for Business and Trade (GOV.UK), 2025[3]
Show the data
| Item | Value |
|---|---|
| 2024 | 36% |
| 2025 | 45% |
Protect yourself with a short credit policy: check the company on Companies House, agree payment terms in writing, ask for a purchase order before you attend, and invoice the same day the job is complete. If an invoice runs late, you can charge statutory interest of 8% plus the Bank of England base rate on business-to-business debts[4]. Our guide to late payment on commercial debts sets out the chasing sequence.
Example: from one call-out to a building portfolio
Example: a managing agent's usual contractor cannot attend a failed water heater in an office washroom on a Friday afternoon. A five-person heating firm on the agent's back-up list attends within two hours, fixes the fault, sends photographs and a one-page report before 6pm, and invoices against the purchase order on Monday. The property manager asks for a quote to service the boilers in that building. The firm proposes a planned maintenance visit schedule instead, covering boilers, water heaters and monthly water temperature checks. Within six months it looks after four of the agent's buildings, with an agreed response time and a monthly report.
Turning reactive jobs into contracts
Reactive work gets you through the door, but contracts make commercial work pay. After every successful job, ask what else is due: servicing, water hygiene tasks, washroom refurbishment or a heating system review. Offer a planned visit schedule with a clear asset list and a response time you can actually meet.
Read our guides to selling planned preventative maintenance and subcontracting for facilities management companies for the next steps.
Frequently asked questions
Do commercial clients need different gas qualifications?
Often, yes. Non-domestic appliances and larger plant fall under commercial gas categories, and clients check each engineer's categories on their Gas Safe card, not just the firm's registration.
How do I get onto a managing agent's approved contractor list?
Ask the property or facilities manager for their onboarding process, then complete the paperwork promptly: insurance, safety documents, accreditation and bank details. Being ready to cover an emergency often gets you the first job.
Should I offer lower rates to win commercial work?
Compete on reliability and reporting first. Discounting to win a contract can trap you in rates that do not cover out-of-hours cover, travel and admin.
What payment terms are normal for commercial clients?
Terms of 30 days are common, and some clients ask for longer. Agree terms in writing before the first job and invoice against a purchase order to avoid disputes.
References
Office for National Statistics (2026). Construction output in Great Britain: August 2026 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
GOV.UK (2026). Late commercial payments: charging interest (opens in a new tab) ↑
Department for Science, Innovation and Technology (GOV.UK) (2025). Cyber security breaches survey 2025 (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑