Key takeaways
- FM companies hold the client contract and pass work orders to subcontractors through a helpdesk and portal, so you are judged on their KPIs.
- Most plumbing and heating subcontract work falls under CIS, with 20% deducted for registered subcontractors and 30% for unregistered ones[1][2].
- Where the subcontract is a construction contract, pay-when-paid clauses are ineffective unless the payer's client is insolvent[3].
- Late payment is the leading obstacle for construction SMEs, so model a 60-day cash gap before you sign[4].
- Price in the admin: portal updates, photos, permits and site inductions take real time on every job.
How FM subcontracting works
A facilities management company signs a contract with a client, such as a retail chain, a bank, an office landlord or a public body, to look after its buildings. The FM company may employ some engineers directly, but it subcontracts specialist trades and areas it cannot cover. If you take on plumbing and heating work for an FM company, you become part of its supply chain: the client never calls you, the FM helpdesk does.
Work arrives as work orders, usually through an online portal or app. Each order has a priority, a site, a description and often a not-to-exceed value, which is the most you can spend without asking for approval. You attend, update the portal with arrival time, notes and photos, and close the job. If more work is needed, you submit a quote through the portal and wait for approval.
The FM company is your customer, but its client's contract sets the rules. Ask to see the response times and KPIs that apply to your trade before you agree rates.
What FM companies want from a heating subcontractor
- Coverage: engineers who can reach the sites in the region within the response times, including nights and weekends for priority work.
- Compliance: insurance, safety accreditation, Gas Safe categories for commercial plant, and site-specific risk assessments.
- Data: prompt, accurate portal updates with photographs and readings, because the FM company reports to its client from your entries.
- Predictable costs: an agreed rate card and quotes that arrive quickly and match the work actually needed.
- Flexibility: the ability to cover a planned visit at short notice when another subcontractor drops out.
Most FM companies onboard subcontractors through a pre-qualification process. Our guide to passing pre-qualification and accreditation checks covers the documents and schemes you will be asked for.
Priorities and response times
FM contracts usually sort jobs into priorities, each with an attendance time and a fix time. The exact numbers come from the client contract and vary widely. A typical structure looks like the example below; treat it as a pattern to recognise, not a standard.
| Priority | Typical meaning | Example attendance | Example fix or make-safe |
|---|---|---|---|
| P1 emergency | Risk to people, building or trading, such as a major leak or no heating in winter | 2 to 4 hours | Make safe on attendance |
| P2 urgent | Serious fault affecting use, such as no hot water in washrooms | Same or next working day | Within 1 to 2 working days |
| P3 routine | Fault with a workaround, such as a dripping tap or one radiator cold | Within 5 working days | Within 10 working days |
| P4 planned | Small improvements or non-urgent works | By agreement | By agreement |
Check how time is measured. Some contracts count from the moment the client logs the call, not when the FM company passes it to you, which can cut your real window. Ask for the work order to show the client's logged time, and for a clear rule on how access problems stop the clock. Our guide to agreeing response times in maintenance contracts covers how to negotiate these.
Rates and where the margin goes
FM rate cards usually include an hourly rate, an out-of-hours rate, a call-out or minimum charge, a parts mark-up cap and sometimes a fixed price for common tasks such as a boiler service. The FM company adds its own margin on top before charging the client, so subcontract rates are often lower than your direct commercial rates.
That can still work if the volume is steady and the admin is light. It stops working when travel between scattered sites, waiting for approvals and portal updates eat the hours you are paid for. Before you agree a rate card, take a month of jobs from a similar client and calculate the real paid hours per engineer day, including travel and admin.
Example: an FM company offers a rate card that is lower than the firm's direct commercial rate. On a test month, the firm's engineers complete four FM jobs a day on average, with 45 minutes of portal and photo work across the day and 90 minutes of travel. Direct commercial clients in the same area allow five jobs a day with less admin. The firm accepts the FM work only for one postcode cluster where the sites are close together, which brings the FM jobs per day up to the same level as its direct work.
CIS and how it changes your cash
The Construction Industry Scheme covers installing systems for heating, lighting, power, water and ventilation, so most plumbing and heating subcontract work falls under CIS[1]. The contractor deducts 20% from a registered subcontractor's payments, or 30% if the subcontractor is not registered or cannot be verified[2]. Deductions count towards your tax and National Insurance, but they leave your bank account at the time of payment.
Source: GOV.UK, 2026[2]
Show the data
| Item | Value |
|---|---|
| Registered subcontractor | 20% |
| Not registered or not verified | 30% |
Register for CIS before you start, make sure the FM company verifies you, and check deduction statements every month. Subcontractors can apply for gross payment status if they meet HMRC's tests, which removes deductions. Ask whether the FM company applies CIS to the labour element only, as the scheme intends, rather than to materials.
Payment terms and pay-when-paid
Some FM subcontracts pay at 45 to 60 days from the end of the month, and some try to pay only once the client has paid the FM company. Where your subcontract is a construction contract under the Housing Grants, Construction and Regeneration Act, a provision making payment conditional on the payer receiving payment from a third person is ineffective, unless that third person is insolvent[3]. The same part of the Act requires payment notices within five days of the payment due date[3].
Late payment is the top cash problem for small construction firms. 45% of construction SME employers named it a major obstacle in 2025[4], and 47% used credit cards as a source of finance[5]. If an FM company pays late, statutory interest of 8% plus the Bank of England base rate is available on business-to-business debts[6]. Our guide to payment terms with main contractors explains what to negotiate.
The paperwork load, honestly
- Site inductions for each new site, sometimes online before the first visit.
- Permits to work for hot works, plant rooms or roof access.
- Portal updates at arrival, during the job and at completion, with photos.
- Quote submissions for anything over the not-to-exceed value, with parts lists.
- Monthly statements to reconcile against CIS deductions and payments.
- Annual re-accreditation and insurance renewals uploaded to the FM company's system.
About 95% of plumbing and heating firms are micro businesses with fewer than ten employees[7], so this admin usually falls on the owner or one office person. Budget for it as part of the rate, or the work will feel busy and pay badly.
Questions to ask before you sign
An FM subcontract is easier to shape before you sign than after the first month of work orders. Put these questions to the supply chain manager and get the answers in writing, ideally in the subcontract or its schedules.
- Which sites and postcodes are included, and roughly how many work orders a month should we expect?
- Which priorities and response times apply to our trade, and when does the clock start?
- What is the not-to-exceed value per work order, and how quickly are quotes approved?
- What are the valuation dates, payment period and invoice format, and how is CIS applied?
- Are there deductions or service credits for missed KPIs, and are they capped?
- Who pays for aborted visits when the site is locked or the contact is absent?
- How much notice do we get if the FM company loses its client contract?
The last question matters more than it looks. FM contracts change hands, and a subcontractor that has built its diary around one FM company can lose a large share of its work at a month's notice.
Is FM subcontracting right for you?
- Good fit: you have spare engineer capacity on weekdays, sites cluster near your base and you have someone who likes systems.
- Good fit: you want commercial references and experience before bidding for direct contracts.
- Poor fit: your cash flow cannot carry 60 days plus CIS deductions.
- Poor fit: the FM company cannot show you the response times and KPIs that apply to your work.
Many firms use FM subcontracting as a bridge: it fills the diary while they build direct commercial relationships. See selling planned preventative maintenance and finding commercial clients for the direct route.
Frequently asked questions
Do FM companies have to deduct CIS from plumbing work?
Most plumbing and heating subcontract work falls under CIS, because the scheme covers installing heating, water and ventilation systems. Check HMRC guidance for jobs that might be outside the scheme.
Can an FM company refuse to pay until its client pays?
If your subcontract is a construction contract under the Housing Grants, Construction and Regeneration Act, a pay-when-paid clause is ineffective unless the client is insolvent. Get advice on your specific contract if a dispute arises.
What is a not-to-exceed value?
It is the most you can spend on a work order without asking for approval. If the job needs more, you submit a quote and wait for authorisation before going further.
Should I agree to lower rates for more volume?
Only if you test the real paid hours per engineer day first. Travel, approvals and portal updates can turn a busy FM contract into a loss.
References
GOV.UK (2026). What is the Construction Industry Scheme (opens in a new tab) ↑
GOV.UK (2026). What you must do as a CIS subcontractor: get paid (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1996). Housing Grants, Construction and Regeneration Act 1996, Part II: payment (sections 109 to 113) (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
GOV.UK (2026). Late commercial payments: charging interest (opens in a new tab) ↑
Office for National Statistics (Nomis) (2026). UK Business Counts - enterprises by industry and employment size band (SIC 2007 class 43.22), via Nomis (opens in a new tab) ↑