Key takeaways
- Commercial work is rarely ‘domestic work in a bigger building’. Access, paperwork and payment terms all add cost that must be priced.
- Under CIS, contractors deduct 20% from a registered subcontractor's payments and 30% if unregistered[1]; price and plan cash flow for it.
- The Construction Act payment rules apply to commercial contracts but not to contracts with residential occupiers[2].
- On business-to-business work, statutory interest of 8% plus base rate can be claimed on late payments[3].
- Social housing work carries hard response deadlines: emergency hazards must be dealt with within 24 hours under Awaab's Law[4].
Where commercial and domestic pricing part ways
Many domestic firms take their first commercial job because a customer runs a shop, a landlord owns a block, or a builder needs a plumber for a fit-out. The work itself is often familiar. What catches firms out is everything around it: inductions, permits, method statements, payment applications and money held back at the end. Price only the pipework and you will work for less than your domestic rate.
| Factor | Domestic | Commercial |
|---|---|---|
| Access | Customer lets you in | Site inductions, sign-in, permits, restricted hours |
| Paperwork | Quote, certificates, warranty registration | Risk assessments and method statements, test records, operation and maintenance information |
| Who pays | The homeowner | A main contractor, managing agent or client, often through an accounts process |
| Payment timing | On completion or by stage | Applications for payment, payment notices, longer terms |
| Tax deductions | None | Construction Industry Scheme deductions on subcontract work |
| Money held back | Rare | Retentions until practical completion and after defects period |
| Response times | Customer expectation | Contractual service levels, sometimes legal deadlines |
Price access and time on site
On a domestic job, an hour on site is mostly an hour of work. On a commercial site it may include a site induction, waiting for a permit, carrying materials through a building with no lift, or working only before the shop opens. Estimate the productive hours, then add the non-productive ones explicitly.
- Inductions and sign-in: allow time on the first day for each engineer, and on each new site.
- Restricted hours: early starts, late finishes or weekend working at your premium rate.
- Access equipment: towers, lifting gear or a second person for safe working.
- Distance from parking to work area: on large sites this can add significant time each day.
- Protection and cleaning: client areas may need protecting and leaving spotless each night.
If the client cannot tell you the access arrangements at quote stage, state your assumptions in the quote: ‘Price assumes access 8am to 5pm Monday to Friday and parking within 50 metres.’ That gives you a basis for a variation if the reality is different.
Paperwork is a cost line
Commercial clients and main contractors will usually want risk assessments and method statements before you start, insurance certificates and registrations, test and commissioning records as you go, and operation and maintenance information at the end. None of this is unreasonable, but it all takes time, and on a small job it can take as long as the work.
Build standard templates so that each new job needs only site-specific changes, and price the remaining time as a line on the quote. Clients who are used to commercial work expect to see it.
CIS and your cash flow
The Construction Industry Scheme covers installing systems for heating, lighting, power, water and ventilation, so most plumbing and heating subcontract work falls under it[5]. The contractor deducts tax from your payments and passes it to HMRC: 20% if you are registered, and 30% if you are not registered or cannot be verified[1].
Source: GOV.UK, 2026[1]
Show the data
| Item | Value |
|---|---|
| Registered subcontractor | 20% |
| Unregistered or unverified | 30% |
Deductions are taken from the labour element, not from materials, so show materials separately on your invoices. They count towards your tax bill, but in the meantime they come out of the cash you receive. For a small firm used to domestic customers paying in full on the day, that difference can be the gap between paying merchants on time and not.
- Register for CIS before you take subcontract work, so you are not deducted at the higher rate.
- Itemise materials on every invoice so deductions are only taken from labour.
- Plan cash flow on the net amount you will receive, not the invoice value.
Payment terms, notices and retentions
Commercial construction contracts carry statutory payment rules under the Housing Grants, Construction and Regeneration Act 1996, including rights around interim payments and payment notices. Those rules do not apply to construction contracts with residential occupiers[2], which is one reason commercial terms look so different from domestic ones.
Late payment is a widespread problem: in 2025, 45% of construction SME employers named it a major obstacle[6]. On business-to-business work you can claim statutory interest of 8% plus the Bank of England base rate on late payments[3]. Read the payment clause before you sign, note the application dates in your diary and submit applications on time.
Retentions are a percentage of each payment held back by the client or main contractor until the work is complete, with part released after a defects period. If a contract includes retention, price it: the money is yours, but you will wait for it, and some firms never see it if a main contractor fails. Ask for the retention percentage and release dates at tender stage, and consider whether the margin on the job justifies the wait.
Maintenance contracts: schedule of rates or fixed fee?
Much commercial plumbing is not projects but planned and reactive maintenance for offices, shops, schools and housing providers. These contracts are usually priced in one of two ways, and each carries a different risk.
- Schedule of rates: you are paid an agreed rate for each type of task or each hour, plus materials. Your risk is low on cost but you depend on the client sending enough work, so check the expected volume and whether it is guaranteed.
- Fixed annual fee: you are paid a set amount for a defined scope, such as planned maintenance visits and a number of reactive call-outs. You carry the risk of more call-outs than expected, so you need good data on past call volumes and a clear definition of what is outside the fee.
- Hybrid: a fixed fee for planned work, with reactive repairs on a schedule of rates. This is often the fairest for both sides.
Whichever model, ask for the last year's call log before pricing. A client who cannot produce one is asking you to guess, and your guess should include a margin for that uncertainty.
Social housing and legal response deadlines
Repairs contracts with social landlords now carry legal timescales behind them. Since 27 October 2025, Awaab's Law requires social landlords in England to investigate emergency hazards and carry out safety work within 24 hours of becoming aware of them[4]. For significant hazards, they must investigate within 10 working days and complete safety work within 5 working days of the investigation[7].
If you contract to deliver those responses, your price must cover the capacity to meet them: engineers available out of hours, stock in vans, and the admin to report back within the landlord's process. Pricing such a contract at your domestic hourly rate, without a standby element, means you subsidise the landlord's legal duty.
Example: a small commercial washroom refit
Example (fictional): a two-engineer firm priced a washroom refit in an office for a main contractor. The domestic-style estimate covered labour and materials only. The commercial version added the items below, which together raised the price by a meaningful share, and the firm still won the job because it was the only quote that showed the paperwork and access costs clearly.
| Added item (Example) | Why it was priced |
|---|---|
| Site induction for two engineers | Required before any work |
| Out-of-hours working on two evenings | Office occupied during the day |
| Risk assessment and method statement | Required by the main contractor |
| Test records and O&M information | Required for handover |
| Retention held for 12 months | Priced as a cost of waiting for the money |
Reading a commercial enquiry
Commercial enquiries often arrive as a drawing, a specification and a deadline. Before you spend a day pricing, check whether the job is right for you: the size relative to your capacity, the payment terms, the client's reputation for paying, and whether the specification is complete. Ask questions in writing and keep the answers; if the tender documents and the answers conflict, your quote should say which you have priced. Declining a tender that does not fit is a sound commercial decision, not a lost opportunity.
Before you take commercial work
Read the contract
Payment terms, application dates, retention, defects period, liquidated damages and any service levels.
Check the client
Look up the company, ask other trades how they pay, and set a credit limit for new clients.
Price the non-productive time
Access, inductions, paperwork and waiting, line by line.
Plan the cash flow
CIS deductions, payment periods and retention, against your materials and wage bills.
Decide your limit
How much of your capacity you will commit to commercial work, so that domestic customers are not left waiting.
Commercial work can steady a domestic firm's diary, but only if every hour on site and every week waiting for payment is in the price.
Frequently asked questions
Should commercial plumbing rates be higher than domestic?
Usually the hourly rate is similar or higher, but the bigger difference is the non-productive time and paperwork, which must be priced as separate lines.
Does CIS apply to plumbing work?
Yes, most plumbing and heating subcontract work falls under CIS[5]. Registered subcontractors have 20% deducted from labour, unregistered ones 30%[1].
Can I charge interest when a commercial client pays late?
Yes. On business-to-business payments you can claim statutory interest of 8% plus base rate[3].
What is a retention?
A percentage of each payment held back until completion, with part released after a defects period. Ask about it at tender stage and price the wait.
References
GOV.UK (2026). What you must do as a CIS subcontractor: get paid (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1996). Housing Grants, Construction and Regeneration Act 1996, section 106 (residential occupiers) (opens in a new tab) ↑
GOV.UK (2026). Late commercial payments: charging interest (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Awaab's Law: Guidance for social landlords - Timeframes for repairs in the social rented sector (opens in a new tab) ↑
GOV.UK (2026). What is the Construction Industry Scheme (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2026). Awaab's Law: Guidance for social landlords - Timeframes for repairs in the social rented sector (opens in a new tab) ↑