How to build and sell a planned preventative maintenance contract: asset lists, visit schedules, pricing each visit, records and the proposal itself.

Ava research teamPublished 7 min read

On this page
  1. What clients are actually buying
  2. Step one: build the asset list
  3. Step two: set the visit schedule
  4. Step three: time the visits around the seasons
  5. Step four: price each visit
  6. Step five: write the proposal
  7. Contract terms that protect both sides
  8. Keep records the client can use
  9. Selling PPM to clients who already call you
  10. Frequently asked questions
  11. References

Key takeaways

  • A PPM contract starts with an asset list; without one you cannot price or schedule honestly.
  • Some tasks have fixed intervals, such as landlord gas safety checks at least every 12 months and monthly water temperature checks at sentinel outlets[1][2].
  • Domestic gas demand in winter runs more than five times summer levels, so schedule heating PPM before the cold arrives[3].
  • Price each visit from task times, travel, reporting and a remedial allowance, then quote remedial work separately.
  • Sell PPM to clients who already call you reactively; they know what breakdowns cost them.

What clients are actually buying

A planned preventative maintenance contract, usually shortened to PPM, is a schedule of visits to inspect, service and test a client's plumbing and heating equipment, priced in advance. Clients buy it for three reasons: fewer breakdowns, a clean compliance record they can show insurers and auditors, and a predictable maintenance budget. Contractors like it because it fills quiet weeks, builds a relationship and turns reactive repairs into planned work.

Demand for maintenance work has been steadier than for new building. In August 2026 construction repair and maintenance output grew by 0.4%, while new work fell by 0.7%[4]. Clients with buildings to look after keep spending on them even when development slows.

Step one: build the asset list

You cannot price a PPM contract from a phone call. Visit the site, walk every plant room, washroom and kitchen, and record each asset. Clients rarely have an accurate list, so offering to build one is a good way to open the conversation and shows them you take the work seriously.

What to capture for each asset in a PPM survey
Field to recordWhy it matters
Asset type and locationEngineers can find it, and you can plan the visit route
Make, model and serial numberParts, manuals and manufacturer service intervals
Age and conditionHelps forecast replacement and set the client's expectations
Fuel and outputDecides which engineers and gas categories are needed
Access notesKeys, ladders, roof access, permits and alarm codes
Statutory or insurer requirementTasks that cannot be skipped or delayed
Photo of the asset and data plateSaves time on every future visit

Number each asset and label it on site with the same number. Every service record, quote and invoice can then refer to it, and the client can see the history of any single boiler or water heater at a glance.

For landlord clients with many homes, the asset list is mostly boilers. In England, 63% of homes had a condensing-combination boiler and 19% a condensing boiler in 2024[5], so most portfolios are dominated by a handful of combi models. Recording model numbers lets you stock the right spares and spot ageing models before they become a run of breakdowns.

Step two: set the visit schedule

Some intervals are fixed by law or official guidance; the rest follow manufacturer instructions and your own judgement. Where a landlord rents homes, each gas appliance and flue must be checked for safety within 12 months of installation and at intervals of not more than 12 months[1]. For hot and cold water systems in commercial buildings, HSE guidance calls for monthly temperature checks at sentinel outlets, quarterly showerhead cleaning or as the risk assessment decides, and at least yearly tank inspections[2].

Example PPM visit schedule for a small commercial building
AssetTaskExample frequency
Gas boilers and water heatersService, combustion analysis, safety checksYearly, or as manufacturer and risk require
Sentinel hot and cold outletsTemperature checks and recordsMonthly
Showerheads and hosesClean and descaleQuarterly or as risk assessment decides
Cold water storage tanksInspect condition and cleanlinessAt least yearly
Thermostatic mixing valvesTemperature check and servicePer manufacturer and risk assessment
Pressurisation units and expansion vesselsCheck charge and operationYearly
Little-used outletsFlushingWeekly, often done by site staff

Industry voices are pushing for more than safety checks in rented homes. HHIC and the EUA have called for the annual gas safety check in rented homes to become a full service plus a heating efficiency check[6]. Even where it is not required, offering service and safety check together is easy to justify to a landlord client.

Step three: time the visits around the seasons

Heating demand is extremely seasonal. UK household gas demand was 109,126 GWh in the first quarter of 2026 against 19,636 GWh in the third quarter of 2025[3]. That pattern drives your reactive workload too: the first cold weeks bring breakdown calls, and engineers committed to PPM visits then are engineers who cannot take emergencies.

UK household gas demand, winter against summer
UK household gas demand, winter against summerComparison. Q1 2026: 109,126 GWh; Q3 2025: 19,636 GWh.109,126 GWhQ1 2026Q1 2026: 109,126 GWh19,636 GWhQ3 2025Q3 2025: 19,636 GWhUK household gas demand, winter against summerComparison. Q1 2026: 109,126 GWh; Q3 2025: 19,636 GWh.109,126 GWhQ1 2026Q1 2026: 109,126 GWh19,636 GWhQ3 2025Q3 2025: 19,636 GWh

Source: Department for Energy Security and Net Zero, 2026[3]

Show the data
ItemValue
Q1 2026109,126 GWh
Q3 202519,636 GWh

Schedule boiler and heating plant servicing between late spring and early autumn wherever the client allows. Keep monthly water checks evenly spread. Put winter-only tasks, such as frost protection checks, on a short list for October and early November.

Step four: price each visit

Build the price from the bottom up. For each visit, add task time for every asset, travel to and from site, time to write the report, consumables and a margin. Then decide what is included: some contractors include minor parts up to a set value; others quote every part separately. Make that line very clear in the proposal.

Example: a small office building has two wall-hung gas boilers, one gas water heater, six sentinel outlets and a cold water tank. The yearly service visit takes an engineer about four hours on site, plus one hour of travel and one hour of reporting. Monthly water temperature checks take 45 minutes on site plus travel and a short report. The firm prices the annual visit and twelve monthly visits as one yearly figure, payable quarterly in advance, with all parts and remedial repairs quoted separately at its standard commercial rates. Because the monthly visits can be combined with nearby clients, the firm schedules them on the same day as two other PPM sites on that side of town.

Do not bury remedial work in the PPM price. Quote it separately and quickly. Clients judge PPM contractors on how fast they turn findings into approved repairs.

Step five: write the proposal

  1. Summarise the client's position

    Two or three sentences on what you found in the survey, including any assets that are overdue or in poor condition.

  2. Attach the asset list

    Every asset, its number and the tasks you will carry out on it, with frequencies.

  3. State the visit plan

    Which months each visit falls in, how much notice you give and how you handle site access.

  4. Define reporting

    What the client receives after each visit: certificates, temperature logs, photos and a list of recommended works with priorities.

  5. Set out price and exclusions

    The yearly price, payment schedule, what is included and what is quoted separately, plus the response time for reactive calls.

  6. Agree review terms

    How the price is reviewed each year and how assets are added or removed.

Contract terms that protect both sides

A PPM contract runs for at least a year, so small gaps in the wording turn into arguments by the third quarter. Agree these points in writing before the first visit:

  • Exclusions: equipment not on the asset list, damage caused by others, and systems the client has had altered without telling you.
  • Access: who arranges keys and site contacts, how much notice you give, and what happens to the price if a visit is aborted because the site is closed.
  • Condition at start: a short note of any assets that were already faulty or unsafe at the survey, so they are not blamed on the first visit.
  • Remedial approvals: how quickly the client will approve or reject recommended works, and who can approve.
  • Unsafe situations: your right to isolate an appliance that is immediately dangerous, with the client informed the same day.
  • Price review: an annual review date and the basis for any change.
  • Ending the contract: the notice period on either side and what records you hand over.

Keep the contract short and readable. Facilities managers and small business owners are more likely to sign a four-page agreement with a clear asset schedule than a long document they need a solicitor to read.

Keep records the client can use

Records are half the value of PPM. For boilers, the Benchmark commissioning checklist and service record has moved online and to the Benchmark apps, and the paper version is no longer maintained[7]. Use digital service records wherever possible and give the client a running log they can open at any time.

A simple monthly summary goes a long way: visits completed, tasks done, temperatures recorded, findings and repairs awaiting approval. Facilities managers forward these to their own clients, so a clear summary makes you easy to keep. If the client also wants guaranteed reactive response, see agreeing response times in maintenance contracts.

Selling PPM to clients who already call you

Your best prospects are the businesses and landlords who already ring you when something breaks. After a reactive job, try a short follow-up: "While we were there we noticed the water heater has not been serviced for a while and the tank lid is missing. We look after a few buildings like yours on a planned schedule, so these things are picked up before they fail. Would it help if I surveyed the site and sent you a list of your equipment with a yearly plan?"

Offer the survey and asset list as the first step. Even if the client does not sign the contract, you have a list of every asset on site and a reason to return. For more on finding these clients, see finding commercial plumbing and heating clients and subcontracting for facilities management companies. For pricing ideas from domestic plans, see service plan pricing models.

Frequently asked questions

What does PPM stand for in plumbing?

Planned preventative maintenance: a schedule of inspections, servicing and tests carried out at set intervals to prevent breakdowns and keep compliance records up to date.

Should parts be included in a PPM price?

Some contractors include minor parts up to a set value; others quote every part. Either works if the proposal states it clearly. Remedial repairs should be quoted separately.

How often should commercial water outlets be temperature checked?

HSE guidance calls for monthly temperature checks at sentinel outlets in hot and cold water systems, with other tasks set by the legionella risk assessment.

When is the best time to service heating plant?

Between late spring and early autumn, when heating demand is low and engineers are less likely to be pulled away by breakdowns.

References

  1. legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 36 (opens in a new tab) ↑

  2. Health and Safety Executive (2026). Legionnaires' disease: hot and cold water systems, things to consider (opens in a new tab) ↑

  3. Department for Energy Security and Net Zero (2026). Energy Trends: UK gas, ET 4.1 natural gas supply and consumption (quarterly), September 2026 (opens in a new tab) ↑

  4. Office for National Statistics (2026). Construction output in Great Britain: August 2026 (opens in a new tab) ↑

  5. Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑

  6. Heating and Hotwater Industry Council (HHIC) (2025). Call to enhance Gas Safety Checks (opens in a new tab) ↑

  7. Heating and Hotwater Industry Council (HHIC) (2026). Benchmark goes digital - what homeowners need to know (opens in a new tab) ↑