Key takeaways
- Demand is real and growing: almost 100,000 hydronic heat pumps were sold in 2024[1], and most grant-funded installs replace gas boilers[2].
- Jobs are larger, with a median air-to-water installed cost of £12,826 under the grant scheme in mid-2026[3], but they take more survey, design and paperwork time.
- The grant is deducted from the customer's price, so you carry it until Ofgem pays after redemption[4][5].
- You do not have to choose all or nothing: partnering or working under an umbrella scheme lets you test the work first.
The question behind the question
Gas engineers ask whether they should install heat pumps for different reasons. Some see boiler work as the business of the past and want to be early. Some are being asked by customers and do not want to send them elsewhere. Some have been told by a supplier that the margins are better. The useful question is narrower: would heat pump work make your business stronger over the next three years, given your customers, your team and your cash?
Four things decide it: whether there is demand in your area, whether the jobs pay once you count the extra time, whether you can get the skills and certification without stalling the business, and whether your cash flow can carry the grant until it is paid. This guide works through each, then gives a low-risk way to test the market.
Is the demand there?
Almost 100,000 hydronic heat pumps were sold in the UK in 2024, a 63% increase in sales[1]. Government aims for more than 450,000 heat pump installations a year by 2030 and has set aside £2.7 billion to 2030 for an expanded Boiler Upgrade Scheme[6]. It also notes that the UK has the lowest heat pump deployment rate in Europe[6], which is a reminder of how far the market still has to grow.
More relevant to a gas engineer is where those installs come from. Of the Boiler Upgrade Scheme installations paid by September 2026, 53,190 displaced gas heating and 17,184 displaced oil[2]. In other words, the typical grant-funded heat pump customer is someone who had a gas boiler: exactly the household already on your service list.
Do the jobs pay?
Heat pump jobs are bigger tickets. The median installed cost of an air-to-water heat pump under the Boiler Upgrade Scheme was £12,826 in July to September 2026, including the grant[3]. A boiler swap is usually a day; a heat pump install involves a room-by-room survey, a design, often radiator and cylinder changes, a longer install, commissioning and grant and certification paperwork. The question is not the price of the job but the profit per working day across everything it involves.
Price the first jobs with every hour counted: survey, design, quoting, install, commissioning, paperwork and the handover. If the margin per day only matches boiler work once you leave out the office time, it does not yet pay. Many firms find it pays once they have done enough jobs to make the survey and design quick and their install team stops learning on the job.
Skills and certification
Just under 10,000 people completed a recognised heat pump training qualification in 2024, 15% more than in 2023[7]. The training is the easy part. The skills that decide whether a heat pump works are heat loss calculation, emitter sizing, hot water design, controls set-up and honest advice about running costs, and they come from doing the work under supervision as much as from a course.
To install under the Boiler Upgrade Scheme you, or the business you work through, must be MCS certified, because the customer's grant depends on an MCS certified installer[8]. That brings a quality management system, design standards and audits. Read MCS certification for heat pump installers before you decide how to get there.
Can your cash flow carry the grant?
The Boiler Upgrade Scheme gives £7,500 towards an air or ground source heat pump in England and Wales[5], and the value is taken off what the customer pays you[8]. You apply for the voucher on the customer's behalf; once it is issued, you have three months to complete an air source installation, or six months for ground source[4]. After commissioning and generating the MCS installation certificate, you apply to redeem the voucher, and approved redemptions are paid on the next weekly payment day, with occasional short delays[4].
Until then you have paid for the equipment and labour and are waiting for the grant. Work out how many jobs you could carry at once before cash gets tight, and set deposits and supplier terms around that number.
What changes in your working week
Heat pump work changes the shape of the diary more than the tools in the van. Surveys take longer and need writing up. Designs need checking before a quote goes out. Installs run over several days and often involve an electrician, a builder for the base or pipe runs, and sometimes the customer's decorator. Customers ask more questions before they commit, especially about running costs and noise, and they expect written answers.
- Plan survey and design time as paid work, not as a favour before the quote.
- Line up a reliable electrician for supplies and controls wiring before the first job.
- Keep a standard pack of written answers on running costs, noise, grants and planning.
- Expect fewer jobs a month at higher value, and plan wages and van use around that.
- Keep boiler servicing running, because it funds the business while the heat pump side grows.
Three ways in
| Route | What it means | Best for |
|---|---|---|
| Refer or partner | Pass heat pump leads to a certified installer, perhaps doing the plumbing as a subcontractor | Testing demand without investment |
| Umbrella scheme | Install under an MCS certified business that handles design and certification | Building experience before certifying |
| Full MCS certification | Your business designs, installs, certifies and applies for grants | Firms committed to heat pump work |
The routes can be steps rather than alternatives. Many firms start by partnering, move to an umbrella scheme while they build experience, and certify once they have a steady flow of jobs. Compare the options in MCS umbrella schemes vs full certification.
Signals to look for
| Factor | Good sign | Warning sign |
|---|---|---|
| Customer enquiries | Several heat pump questions a month | Almost none, even when you ask |
| Housing stock | Owner-occupied homes with space outside | Mostly flats or terraces with no external space |
| Team | An engineer who wants to specialise | Everyone fully booked on boiler work |
| Cash | Can carry two or three grants at once | One delayed payment would hurt wages |
| Office | Someone to manage paperwork and grants | The director already does all the admin at night |
Where firms get caught out
The commonest problems are not technical. They are sizing done in a hurry to win a quote, running cost promises that a tariff change later breaks, and installs started before the voucher or the customer's paperwork is ready. Each one turns a profitable job into a complaint. Build your process so that the heat loss is done properly, running costs are explained as estimates with assumptions, and no work starts until the voucher is issued. Read heat pump sizing mistakes that cause complaints before your first design.
Example: a two-van gas firm decides
Example (fictional): a two-engineer firm with 450 service customers logs every heat pump question for three months and gets 14. It partners with a local certified installer, earning a referral fee and doing the radiator work as a subcontractor on five jobs. One engineer attends each install and starts training.
After six months the firm reviews the numbers. Demand is steady, the engineer is keen and the radiator work paid well, but the firm cannot carry more than two grants at a time. It decides to join an umbrella scheme for the next year, set deposits to cover equipment costs, and revisit full certification once it has done twenty installs.
A 90-day test plan
Count the demand
Log every heat pump question from customers and enquiries for 90 days.
Talk to a certified installer
Agree a referral or subcontract arrangement and attend their surveys and installs.
Book the training
Start a recognised heat pump course for the engineer who wants to specialise.
Model the cash
Work out how many grant-funded jobs you could carry at once.
Decide the route
Partner, umbrella or certify, based on the numbers, not the brochure.
Done right, the work earns its place. Government reports that 90% to 95% of property owners with a grant-funded heat pump are satisfied with their heating system[6]. The firms that keep those customers happy are the ones that sized and set up the system properly, which is a skill a careful gas engineer already has the habits for.
Frequently asked questions
Can a gas engineer install heat pumps without MCS?
You can install a heat pump, but the customer only gets the Boiler Upgrade Scheme grant if the installer is MCS certified, so most firms work through certification or an umbrella scheme.
Are heat pump jobs more profitable than boiler swaps?
The tickets are larger, but they take more survey, design and paperwork time. Measure profit per working day, including office time.
How long does the grant take to arrive?
After commissioning and the MCS certificate, you apply to redeem the voucher, and Ofgem pays approved redemptions on its next weekly payment day, with occasional short delays.
Do most heat pumps replace gas boilers?
Under the grant scheme, yes: more installations displaced gas heating than any other fuel.
References
Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Ofgem (2026). Boiler Upgrade Scheme (BUS): installers (opens in a new tab) ↑
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑
Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: how to apply (opens in a new tab) ↑