Key takeaways
- Air-to-air heat pumps heat and cool rooms but do not make hot water, so every quote needs a written hot water plan.
- The Boiler Upgrade Scheme lists £2,500 towards an air-to-air heat pump, against £7,500 for an air source heat pump[1].
- Split systems mean refrigerant work on site: the engineer needs an F gas qualification and the business needs company certification, sole traders included[2][3].
- The best fits are flats, small off-gas homes and extensions with no wet system worth keeping.
- If you lack the refrigerant skills, partner with a certified firm and keep the survey, hot water and controls work yourself.
What an air-to-air system actually is
An air-to-air heat pump moves heat from outdoor air into the house through a refrigerant circuit, then blows warm air into the room from an indoor unit, usually mounted high on a wall. Most domestic installs are split systems: an outdoor unit connected by insulated refrigerant pipework to one or more indoor heads. Reverse the cycle and the same kit cools the room, which is why many customers already think of it as air conditioning.
That makes it a different product from the air-to-water heat pumps most heating engineers now fit. There is no wet system, no radiators and no cylinder coil. For a plumbing and heating firm the work is partly familiar (heat loss, controls, condensate drainage, coordinating the electrics) and partly new (refrigerant pipework, brazing, pressure testing, evacuation and charging).
Air-to-water still dominates grant-funded work: 98% of Boiler Upgrade Scheme applications up to the end of September 2026 were for air-to-water heat pumps[4]. Air-to-air is a niche inside that market, which is exactly why it can be worth a look if your patch has the right housing and few competitors offer it.
The grant position in England and Wales
The Boiler Upgrade Scheme lists £2,500 towards an air-to-air heat pump, alongside £7,500 for an air source or ground source heat pump and £5,000 for a biomass boiler[1]. The installer applies on the customer's behalf and the grant is taken off what the customer pays[5], so the paperwork and the cash-flow wait land on you, not on the homeowner.
Two practical points follow. First, the grant is a third of the air-to-water figure, so the customer's own contribution is a bigger share of the job and you should expect more price-led conversations. Second, the grant depends on scheme rules about the installer, the product and the property, so read the current scheme guidance for air-to-air before you put a grant figure on a quote. Scotland and Northern Ireland have their own arrangements, so a firm working across borders needs a separate answer for each.
Never present a grant amount on a quote as a certainty. Write the scheme name, the amount you expect to claim and the condition: subject to voucher approval.
F gas: what you need before you touch a split system
Refrigerant work is regulated. GOV.UK guidance says you need an F gas qualification to install new systems, service and maintain them, check for leaks, recover gas and decommission old systems[2]. A category 1 certificate covers all activities. Category 2 covers installing, maintaining, servicing and recovering refrigerant on systems holding less than 3kg of F gas, or less than 6kg if hermetically sealed[2]. Most single-room domestic splits sit inside category 2, but larger multi-split systems may not, so check the charge on the data plate before you commit.
The business needs certification too. Any company servicing stationary refrigeration, air conditioning or heat pump equipment for others must be certified by an approved body, and the guidance states that this includes sole traders[3]. The approved bodies it names are Refcom, F-Gas Register (Quidos) and Bureau Veritas[3]. Our guide to F gas certification covers the routes and timing.
Budget for the kit as well as the courses. A typical starting list:
- Refrigerant-grade copper, a flaring or brazing set and oxygen-free nitrogen for purging
- A vacuum pump and micron gauge for evacuation
- Gauges rated for the refrigerant you will fit
- A recovery machine and cylinders, or a written subcontract arrangement for recovery
- Leak detection equipment and a record-keeping routine for every system you install
Which homes suit air-to-air, and which do not
The technology works best where a wet system is missing, costly to add or not worth keeping. 8.5% of households in England and Wales used electric central heating at the 2021 Census[6], and around four million UK homes are off the gas grid and rely on heating oil or LPG[7]. Not all of those are candidates, but flats and small homes in that group are where the conversation usually starts.
| Property | Fit | Why |
|---|---|---|
| Flat with storage or panel heaters | Strong | No wet system to replace; two heads can cover the main rooms; cooling is a summer bonus |
| Well-insulated bungalow off the gas grid | Good | Low heat loss suits a few heads; needs a separate hot water plan |
| Extension or garden office | Good | Avoids extending the wet system; one head often covers it |
| Terrace with a working gas combi | Weak | Many small rooms and stairs; a wet system is already there |
| Listed building or conservation area | Check first | External units and pipe routes may need consent |
| Customer wants invisible, silent heating | Weak | Indoor heads and fan noise are visible and audible |
Ask three questions on the first call: how is the home heated now, how is hot water made, and which rooms matter most. If hot water currently comes from a combi that will be removed, you need a hot water plan before you can quote. Where the customer wants to keep a boiler, our piece on hybrid heat pumps sets out the trade-offs.
Be straight about cooling as well. A customer who buys partly for summer comfort will use it, and that adds electricity use in the months when they expect bills to fall. Put it in the handover notes so the first summer bill is not a surprise, and show them how to set a sensible cooling temperature rather than running the head flat out.
The hot water gap
Air-to-air does not heat water. Every quote needs a line that says how hot water will be produced after the job: an existing cylinder with an immersion, a new cylinder, a heat pump water heater, or the boiler staying in place for hot water only. Leaving this vague is the commonest route to a complaint a few weeks after handover.
This is where a plumber has an edge over a pure air conditioning firm. You can size and fit the cylinder, handle the Building Regulations side of unvented work and add a solar diverter where the customer already has panels. Our guide to heat pump cylinders covers sizing and reheat times.
Worked Example: quoting a two-bedroom flat
Example (fictional): a second-floor flat with old storage heaters, a 120-litre vented cylinder and an immersion heater. The owner wants lower running costs and asks whether the main bedroom can be cooled in summer.
Survey and heat loss
Measure each room and calculate heat loss. The living room and main bedroom carry most of the load; the bathroom keeps an electric towel rail.
Choose the layout
One outdoor unit with two indoor heads, with the refrigerant charge checked against your F gas category before you order.
Plan hot water
Keep the cylinder, replace the immersion and its thermostat, and explain the running cost honestly. Offer a new cylinder as an option, not a default.
Check permissions
The flat is leasehold, so the freeholder must agree to the outdoor unit and wall penetrations. The customer obtains this in writing before you order kit.
Write the quote
Separate lines for equipment, refrigerant pipework, the dedicated electrical supply by your partner electrician, making good, commissioning, and the grant you expect to claim subject to voucher approval.
Hand over
Show the controls, explain filter cleaning, give the service interval and record the refrigerant type and charge in your F gas records.
Is it worth adding to your business?
The case is strongest if you already do heat loss surveys, have someone F gas qualified or willing to train, and work in an area with lots of flats or off-gas bungalows. It is weakest if your diary is already full of boiler work and wet-system heat pumps, because training, tools and certification costs are spread over few jobs.
- Can you name ten homes in your existing customer list with no wet system?
- Will at least one engineer hold a category 1 or 2 qualification within six months?
- Do you have an electrician you trust for dedicated supplies?
- Can you service what you install, including filter cleans and any leak checks required?
- Do your quote templates have a hot water line and a permissions line?
If you answer yes to most, start with extensions and flats, where the job is contained and the customer's comparison is clear. If not, partner with a certified air conditioning firm for the refrigerant side while you keep the survey, hot water and controls.
Frequently asked questions
Can a plumber install an air-to-air heat pump?
Yes, if the person doing the refrigerant work holds a suitable F gas qualification and the business holds F gas company certification[2][3]. Without both, partner with a certified firm for the refrigerant side.
Is there a grant for air-to-air heat pumps?
In England and Wales the Boiler Upgrade Scheme lists £2,500 towards an air-to-air heat pump[1]. Check the current eligibility rules before you put the grant on a quote.
Do air-to-air heat pumps provide hot water?
No. They heat and cool rooms only, so the home needs a separate hot water solution such as a cylinder with an immersion, a heat pump water heater or a retained boiler.
Do I need permission for the outdoor unit?
Check the current planning rules with the local planning authority, especially for listed buildings, conservation areas and flats. For leasehold flats, get the freeholder's consent in writing before ordering equipment.
References
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑
GOV.UK (2026). Qualifications required to work on equipment containing F gas (opens in a new tab) ↑
GOV.UK (2026). Certification for companies working on equipment containing F gas (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: how to apply (opens in a new tab) ↑
Office for National Statistics (2021). Housing, England and Wales: Census 2021 (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2026). HHIC and OFTEC urge Government to back hybrid heating systems to support off-grid households (opens in a new tab) ↑