Heat pumps low carbon

Doing a room-by-room heat loss survey

How to carry out a room-by-room heat loss survey for a heat pump: kit, measurements, construction assumptions, the MCS calculator and a worked Example.

Ava research teamPublished 7 min read

On this page
  1. Why the survey decides the job
  2. Before the visit
  3. Kit to bring
  4. The survey, room by room
  5. Assumptions are where surveys go wrong
  6. Older homes need extra care
  7. Using the calculation tool
  8. How long a good survey takes
  9. Example: a 1910 terrace with an extension
  10. Sense-checking and presenting the result
  11. Frequently asked questions
  12. References

Key takeaways

  • Heat pump design in the MCS scheme rests on a room-by-room heat load calculation compliant with BS EN 12831-1[1].
  • The 2026 Approved Document L says room-by-room calculation should be used for new systems with emitters, and that sizing from the old appliance is not appropriate[2].
  • Most errors are assumptions, not arithmetic: wall construction, floor type, ventilation and extensions.
  • Older homes are a real share of grant work[3], so record every assumption and its evidence.

Why the survey decides the job

A heat pump sized from a guess will either struggle on the coldest days or cycle inefficiently the rest of the year. Both lead to complaints. The heat loss survey is where you prevent them, and it is also the record that shows a certification body, Ofgem or a customer's adviser how you sized the system. For grant work, the heat pump must be sized to meet the full space heating needs of the property[4], which you can only show with a calculation.

The MCS Heat Load Calculator is designed to help certified installers complete a BS EN 12831-1:2017 compliant heat load calculation, as required by the heat pump design standard MIS 3005-D, room by room[1]. Approved Document L points the same way: its 2026 edition, taking effect on 24 March 2027, says a room-by-room calculation should be used when a new heating system including emitters is installed, and that sizing a replacement from the output of the existing appliance is not appropriate[2]. Systems should not be oversized[2].

Before the visit

  • Look up the property's Energy Performance Certificate, which also helps with grant eligibility.
  • Ask for plans, extension dates and any previous insulation or window work.
  • Ask the customer which rooms feel cold, which they heat and the temperatures they like.
  • Check the property's age, construction type and whether it is listed or in a conservation area.
  • Ask for a year of energy bills, which you can use later to sense-check your result.

Ten minutes of questions on the phone saves an hour on site, and the customer's answers about cold rooms often point straight at the elements you need to look at most carefully.

Kit to bring

  • A laser measure and a tape for awkward spaces.
  • A camera or tablet to photograph every room, window, wall build-up and the loft.
  • A torch and a small inspection camera for wall cavities, floor voids and lofts where access allows.
  • A survey sheet or app laid out room by room, matching your calculation tool's inputs.
  • A moisture meter or at least a careful eye for damp, which affects comfort and condition.

The survey, room by room

  1. Walk the outside

    Note orientation, exposure, wall construction clues such as brick bond and wall thickness at openings, extensions and window types.

  2. Measure each room

    Record length, width and height, and which walls are external, party or internal.

  3. Measure openings

    Record the size and type of every window and external door, including roof lights.

  4. Identify construction

    For each external wall, roof and floor, record what you found and the evidence, or mark it as assumed.

  5. Check the loft and floors

    Measure loft insulation depth and note whether ground floors are solid or suspended timber.

  6. Note ventilation

    Record open chimneys, trickle vents, extract fans and obvious draughts.

  7. Record the emitters

    Note every radiator's type and size so you can check its output at the design flow temperature.

  8. Ask about hot water

    Record the number of occupants, baths and showers, and any high-use habits.

Assumptions are where surveys go wrong

The calculation needs a heat loss value for each element and design temperatures inside and out. The arithmetic is done by the tool; the judgement is yours. Assuming a wall is insulated cavity when it is solid brick, or that a floor is solid when it is suspended timber over a ventilated void, can change the answer more than anything else on the sheet. The MCS calculator works from building specification, room dimensions and design temperatures[1], so the quality of those inputs is the quality of the design.

Survey inputs that most often change the result
ElementWhat to recordCommon error
External wallsConstruction, thickness, insulation evidenceAssuming cavity insulation without checking
Windows and doorsSize, glazing type, frameUsing catalogue values for old double glazing
Roof and loftInsulation depth, rooms in the roofMissing sloping ceilings in loft conversions
Ground floorSolid or suspended, insulationTreating a suspended timber floor as solid
VentilationChimneys, vents, draughtsIgnoring an open chimney in a little-used room
ExtensionsAge, construction, glazingUsing the main house construction for a later extension

Write down the source of each assumption: measured, observed, from plans or from age-based defaults. If the customer later says the house has cavity insulation, you can show what you saw and change the design with evidence rather than arguing about it.

Older homes need extra care

Heat pumps are going into old houses. The Warm Homes Plan, drawing on the scheme's evaluation, reports that 14% of Boiler Upgrade Scheme applicants lived in homes built before 1900 and 6% in homes built from 1900 to 1929[3]. Those homes often have solid walls, suspended floors, mixed extensions and alterations nobody recorded.

Boiler Upgrade Scheme applicants living in older homesShare of applicants, from the BUS evaluation as reported in the Warm Homes Plan
Boiler Upgrade Scheme applicants living in older homesComparison. Built before 1900: 14%; Built 1900 to 1929: 6%.14%Built before 1900Built before 1900: 14%6%Built 1900 to 1929Built 1900 to 1929: 6%Boiler Upgrade Scheme applicants living in older homesComparison. Built before 1900: 14%; Built 1900 to 1929: 6%.14%Built before 1900Built before 1900: 14%6%Built 1900 to 1929Built 1900 to 1929: 6%

Source: Department for Energy Security and Net Zero (GOV.UK), 2026[3]

Show the data
ItemValue
Built before 190014%
Built 1900 to 19296%

Damp is also common in the stock: 5% of dwellings in England, 1.4 million homes, had a damp problem in 2024[5]. Note any damp you see, because it affects comfort and how the customer will judge the new system, and because a home with damp walls may need other work first. Great Britain also has 5.2 million rural homes among its 30 million[6], and exposed rural sites deserve careful thought about wind and design temperatures.

Using the calculation tool

Enter the survey into your calculation tool room by room, with design temperatures stated. The MCS Heat Load Calculator is available to certified installers and those working towards certification, and produces a report that can be saved or downloaded for quotations, audits and compliance checks[1]. Whichever tool you use, keep the report with the job, attach the photos that support your key assumptions and make sure the design, the radiator schedule and the heat pump selection all use the same figures.

How long a good survey takes

A proper room-by-room survey of an ordinary house takes longer than a boiler survey, and it should. Budget for it in your diary and your prices rather than squeezing it between breakdowns. Firms that rush the survey usually pay for it later in redesigns, extra radiators fitted at their own cost or a heat pump that never quite satisfies the customer.

  • Book survey time as a fixed slot, with time afterwards to enter the data while it is fresh.
  • Use the same room order and survey sheet on every job, so nothing is skipped when a house is awkward.
  • Photograph first and measure second, so you can check a doubtful figure later without another visit.
  • Enter data into the calculation tool the same day; memory fades quickly across several houses.
  • Have a second person review the first few surveys of any new surveyor before quotes go out.

Some firms charge for the survey and credit the fee against the installation. Whether you do or not, explain to the customer what the survey involves and why it takes time. It sets you apart from quotes based on a quick look and the age of the old boiler.

Example: a 1910 terrace with an extension

Example (fictional): an installer surveys a two-storey terrace built around 1910 with a 1990s kitchen extension. The main house walls are solid brick, confirmed by the brick bond and wall thickness at the window reveals. The extension has cavity walls with insulation visible at a vent. The front room floor is suspended timber with a ventilated void; the extension floor is solid.

The installer records each element with its evidence and photos, enters the two parts of the house with different constructions, and finds that the front bedroom and the extension have the highest heat loss per square metre. The design increases radiator sizes in those two rooms and keeps the rest. The customer's annual gas use, adjusted for boiler efficiency, gives a total that is close to the calculation, which gives both sides confidence.

Sense-checking and presenting the result

Before you quote, compare the calculated heat loss with the customer's past energy use and with similar homes you have surveyed. A large gap does not mean the calculation is wrong, but it means you should check your assumptions again. Then show the customer the room-by-room result in plain terms: which rooms lose most heat, why, and what that means for radiators and the heat pump size. Customers who see the reasoning accept the design far more readily, and they are less likely to compare your quote with a cheaper one sized by guesswork.

Frequently asked questions

Is a room-by-room heat loss survey required for a heat pump?

For MCS certified installations the design standard requires a BS EN 12831-1 compliant room-by-room heat load calculation, and the grant requires the heat pump to meet the full space heating need.

Can I size a heat pump from the old boiler?

No. Approved Document L's 2026 edition says sizing a replacement from the existing appliance's output is not appropriate.

What is the most common heat loss survey mistake?

Wrong construction assumptions, such as treating solid walls as insulated cavity or suspended floors as solid.

Should I use energy bills to size a heat pump?

Use them to sense-check a proper calculation, not instead of one.

References

  1. MCS (Microgeneration Certification Scheme) (2026). The MCS Heat Load Calculator (opens in a new tab) ↑

  2. GOV.UK (Ministry of Housing, Communities and Local Government) (2026). Approved Document L, Volume 1: Dwellings (2026 edition) (opens in a new tab) ↑

  3. Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑

  4. Ofgem (2026). Boiler Upgrade Scheme (BUS): installers (opens in a new tab) ↑

  5. Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 1, housing quality (opens in a new tab) ↑

  6. Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo