Key takeaways
- Off-gas oil and LPG homes can get an extra £1,500 until March 2027[1], and the uplifted grant already made up 32% of applications in July to September 2026[2].
- Air-to-air heat pumps now attract £2,500[3], but non-residential buildings are excluded for air-to-air installs[4].
- Some rules have not changed and still catch installers out: no hybrids, full space heating sizing and replacing fossil fuel or electric heating[5][4].
- Check Ofgem's current guidance on the day you quote, date the quote and say what happens if the rules change before installation.
Why rule changes matter to your quotes
The Boiler Upgrade Scheme has changed several times since it opened, and each change moves money between your quote and your customer's pocket. A quote written to last month's rules can promise a grant the customer no longer qualifies for, or miss one they now do. The fix is a routine, not a memory: check Ofgem's installer guidance and the GOV.UK pages on the day you quote, and put the date of that check on the quote.
This article summarises the changes that matter most in November 2026 and the long-standing rules that still trip installers up. It is a starting point, not a substitute for the current guidance, which is what Ofgem will apply when it processes your application and redemption.
Change 1: the off-gas uplift
Until March 2027, homes heated by oil or LPG that have no mains gas connection can get an additional £1,500 towards an air or ground source heat pump[1], taking the grant for those homes to £9,000. Take-up has been quick. By the end of September 2026 there had been 8,107 applications for the new £9,000 off-gas grant, 32% of the 25,374 applications made in July to September 2026[2].
- New £9,000 off-gas grant 32%
- Other applications 68%
Source: Department for Energy Security and Net Zero, 2026[2]
Show the data
| Item | Value |
|---|---|
| New £9,000 off-gas grant | 32% |
| Other applications | 68% |
The uplift is time-limited, so dates matter. For any off-gas job that might run close to March 2027, check how the cut-off applies, whether to the voucher application, the voucher issue or the redemption, in Ofgem's guidance before you quote. Tell the customer in writing what happens to the price if the uplift is not available for their job.
Change 2: air-to-air heat pumps
The scheme now offers £2,500 towards an air-to-air heat pump, alongside £5,000 for a biomass boiler[3]. Government said in the Warm Homes Plan that it would begin providing grants for heat batteries and air-to-air heat pumps[6]. For installers this opens a new product line, but it also brings a new eligibility point: non-residential buildings are excluded where an air-to-air heat pump is being installed[4].
Air-to-air systems involve refrigerant pipework between indoor and outdoor units, so check that your team, or your subcontractor, holds the right refrigerant handling certification before you quote. Be clear with customers about what an air-to-air system does and does not do: it heats rooms by air, and does not provide hot water.
Change 3: funding to 2030
The Warm Homes Plan describes an expanded Boiler Upgrade Scheme funded with £2.7 billion to 2030, alongside a new zero and low-interest loan offer backed with an initial £2 billion of government support[6]. That gives installers more certainty than the year-by-year budgets of the scheme's early years, and makes it more reasonable to invest in certification, training and stock. It does not fix the grant values or rules for that period, which can still change.
Rules that have not changed but still catch installers
- The system must not be a hybrid that combines a heat pump with fossil fuel heating[4]; there is no grant for a gas boiler and air source heat pump combination[5].
- The heat pump must be sized to meet the full space heating needs of the property, whether or not a supplementary appliance is also fitted[4].
- The new system must replace a fossil fuel or electric heating system, except for eligible self-builds[4].
- Social housing and most new builds are not eligible properties[4].
- For shared ground loops, the combined capacity of all heat pumps on the loop cannot exceed 300kWth[4].
Most rejected applications come from these, not from the newer rules. Build them into your survey sheet so they are checked on every job.
Changes on the MCS side
Certification is changing too. MCS is moving installers to a redeveloped scheme in which the MCS Contractor Standard is replaced by the Installer Operating Requirements and the Customer Commitment, and certified businesses must name a Main Contact, a Licensee and a Technical Supervisor[7]. MCS published guidance on its new Installer Agreement on 19 October 2026[7]. If you are already certified, your certification body will contact you about moving over; prepare your procedures in the meantime so your grant work is not interrupted.
Changes at a glance
| Change | What it means | What to do |
|---|---|---|
| Off-gas uplift to March 2027 | Oil and LPG homes without mains gas can get £9,000 | Check the cut-off rule before quoting jobs near the deadline |
| Air-to-air grant | £2,500 for eligible air-to-air installs | Confirm the building is residential and your team is certified for refrigerant work |
| Funding to 2030 | More certainty for planning | Plan certification and training, but recheck rules each quote |
| Redeveloped MCS scheme | New core documents and named roles | Prepare procedures and assign roles now |
A rule check before every quote
Open the current guidance
Read Ofgem's installer guidance and the GOV.UK grant pages on the day you quote.
Note what changed
Compare with your checklist and update it if anything has moved.
Check this property
Run the eligibility points for this home, including fuel, EPC and property type.
Check the grant value
Confirm which amount applies, including any uplift and its deadline.
Date the quote
Write the date of the rule check and the grant value you relied on.
Explain the risk
Say what happens to the customer's price if the grant changes before the voucher is issued.
Example: an off-gas quote near the deadline
Example (fictional): in January 2027 an installer surveys an oil-heated bungalow with no gas connection. The customer wants an April installation to avoid disrupting a family event. The installer checks Ofgem's guidance on how the March 2027 cut-off applies, then quotes two options: apply now and install in March, with the higher grant shown; or install in April, with the quote showing the standard grant and noting that the uplift may not apply.
The customer chooses March. The installer applies the same week, chases the owner's consent email and books the installation well before the deadline. Because the quote stated the date of the rule check and both prices, there is no argument about what was promised.
Keeping your team, website and leaflets current
Rule changes cause most trouble not in the quote but in everything around it: a website page that still shows last year's grant, a leaflet in the van, or an office script that promises the uplift to every rural caller. Customers quote these back to you, and a mismatch with your written quote looks like a bait and switch even when it is an honest oversight.
- Name one person to check Ofgem and GOV.UK guidance on a fixed day each month and after any announcement.
- Keep a one-page grant summary with the date it was last checked, and update everything from it.
- Remove specific grant amounts from printed material that will outlive the current rules, or date it clearly.
- Brief whoever answers your phone, so callers hear the same grant information your quotes use.
- Add a line to every grant page on your website telling customers that eligibility is confirmed at survey.
This takes an hour a month and saves the far longer conversations that follow a customer who believes they were promised a grant they cannot get. It also helps if Ofgem ever asks how you advised a customer, because you can show which rules you relied on and when.
Quote wording that protects you
Sample wording: This quote assumes a Boiler Upgrade Scheme grant of the amount shown, based on the scheme rules published on the date above. The grant is subject to Ofgem's approval. If the grant is not approved or its value changes before the voucher is issued, we will tell you the revised price before any work starts, and you may cancel without charge.
With demand at record levels, including 9,738 applications in September 2026 alone[8], careful quoting matters more, not less. The installers who check the rules every time are the ones whose customers never discover a gap between the quote and the grant.
Frequently asked questions
What is the off-gas uplift?
An extra £1,500 towards an air or ground source heat pump for homes heated by oil or LPG with no mains gas connection, available until March 2027.
Can I get the grant for an air-to-air heat pump?
Yes, £2,500 for eligible installations, but not where the air-to-air heat pump is installed in a non-residential building.
Are hybrid systems now eligible?
No. Systems that combine a heat pump with fossil fuel heating remain ineligible.
How do I avoid quoting the wrong grant?
Check Ofgem's current guidance on the day you quote, date the quote and state what happens if the grant changes before the voucher is issued.
References
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑
Ofgem (2026). Boiler Upgrade Scheme (BUS): installers (opens in a new tab) ↑
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑
Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑
MCS (Microgeneration Certification Scheme) (2026). Moving over to the redeveloped installer Scheme (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑