Key takeaways
- Define three separate clocks in every SLA: attendance, make-safe and permanent fix.
- Use legal timescales as reference points: Awaab's Law gives social landlords 24 hours to make emergency hazards safe[1].
- Write down what starts and stops the clock, especially lack of access and parts on order.
- Cap service credits and agree a measurement period; a single bad night should not wipe out a month's margin.
- Set targets from your real capacity, including winter demand that can run more than five times summer levels[2].
What a service level agreement should actually say
A service level agreement, or SLA, is the part of a maintenance contract that says how fast you will respond and how that will be measured. Clients care about it because their own customers, tenants or managers hold them to account. Contractors should care just as much, because a vague SLA turns every slow job into an argument and every argument into a deduction.
Good SLAs separate three things that are often blurred together. Attendance is when an engineer arrives on site. Make-safe is when the immediate risk is removed: water isolated, gas appliance capped, temporary heating provided. Permanent fix is when the fault is fully repaired. A burst pipe can be attended in two hours, made safe in three and fixed two days later when a section of pipework has been replaced, and all three times can be met or missed independently.
If the contract only says response time, ask which of the three it means. The answer changes how you staff the contract.
Reference points from the law
There is no general legal SLA for commercial plumbing, but several legal timescales give useful anchors when you negotiate.
- Social housing in England: under Awaab's Law, landlords must investigate emergency hazards and carry out safety work within 24 hours of becoming aware of them[1]. For significant hazards they have 10 working days to investigate and 5 working days after that to complete safety work[3].
- Gas escapes: when told of a gas escape, the gas conveyor must attend as soon as reasonably practicable and stop the escape within 12 hours[4]. That duty sits with the gas network, not with you, but it shapes what clients expect when they report a smell of gas.
- Consumers: where no time is agreed for a service, the Consumer Rights Act 2015 requires it to be performed within a reasonable time[5]. Business clients rely on what the contract says.
Source: Ministry of Housing, Communities and Local Government (GOV.UK), 2026[3]
Show the data
| Item | Value |
|---|---|
| Investigate | 10 working days |
| Complete safety work after investigation | 5 working days |
If you work for social landlords, expect their contracts to set internal targets shorter than these legal limits, so they have time to check your evidence. Our guide to Awaab's Law repair timescales explains the categories in detail.
Build targets from your real capacity
Map your cover
Write down how many engineers are available in each part of the week, including nights and weekends, and who is on call.
Measure travel
For each client site, record realistic drive times at rush hour and at night. A target that works for a site ten minutes away may be impossible for one forty minutes away.
Check your call handling
Measure how long it takes from a client's call to a job being dispatched. If calls go to voicemail while engineers are working, the clock is running before anyone knows.
Look at the seasons
UK household gas demand in the first quarter of 2026 was more than five times the level of the third quarter of 2025[2]. Your winter capacity, not your summer capacity, sets what you can promise.
Set targets per priority
Agree attendance, make-safe and fix targets for each priority level, and test them against last winter's busiest week.
Most plumbing and heating firms are small: about 95% have fewer than ten employees[6]. A small firm can offer excellent response, but only inside a tight geography and with a clear on-call rota. Do not sign a regional SLA you could meet only if nobody were ever ill.
Example priority schedule
| Priority | Definition | Attend | Make safe | Fix |
|---|---|---|---|---|
| Emergency | Danger to people or property, or loss of all heating or water | 4 hours | On attendance | Next working day or parts plus 2 days |
| Urgent | Fault seriously affecting use of the building | Next working day | On attendance | 3 working days |
| Routine | Fault with a workaround | 5 working days | Not applicable | 10 working days |
| Planned | Improvement or non-urgent work | By agreement | Not applicable | By agreement |
Alongside the table, define the clock rules in plain words. The clock starts when the client logs the job with you by an agreed channel. It pauses when the client cannot provide access, when the client has not approved a quote, or when a part is on order and you have told the client its delivery date. It stops when the work order is closed with evidence.
Running an on-call rota that meets the targets
Emergency targets are only as good as the rota behind them. Write it down a month ahead, share it with the whole team and make the rules simple enough to follow at two in the morning.
- One named engineer and one named back-up for every night and weekend, with phone numbers in one shared place.
- A maximum number of consecutive on-call nights per person, so nobody is driving tired.
- A rule for when the on-call engineer calls in the back-up, such as two emergencies at once or a job that needs two people.
- Van stock for make-safe on every on-call van, checked each Friday.
- Access details for contract sites stored where the on-call engineer can see them: key safes, alarm codes, site contacts.
- A short handover note each morning so the day team knows what was made safe overnight and what still needs a permanent fix.
Pay on-call fairly and consistently. Engineers who feel the rota is unfair stop answering the phone, and the SLA fails quietly long before anyone sees it in the monthly report.
Penalties, service credits and caps
Many contracts link missed targets to service credits, which are deductions from your invoice. They are reasonable in principle: the client is paying for reliability. They become dangerous when they are uncapped, measured job by job, or triggered by events outside your control.
- Cap total service credits at a small share of the monthly invoice.
- Measure performance over a month or a quarter, not per job, with a target such as a percentage of jobs inside time.
- Exclude delays caused by no access, client approvals and agreed parts lead times.
- Allow earn-back: credits reduce if the next period's performance is above target.
- Agree a review after the first three months, when both sides have real data.
Example: a managing agent proposes a fixed deduction for every emergency job attended late. The contractor suggests instead that 90% of emergency jobs each month must be attended within four hours, with a credit only if the monthly figure falls below that, capped at a modest share of the month's invoice. The agent accepts, because it gets a clear measure for its own client report, and the contractor is no longer exposed to a single night of snow.
Monthly reporting that keeps the contract
A clear monthly report prevents most SLA disputes, because problems are discussed while they are small. Keep it to one or two pages.
- Jobs received by priority and site.
- Attendance, make-safe and fix performance against each target, with the percentage inside time.
- Every missed target, with the reason and what changes as a result.
- Jobs paused for access or approvals, with dates.
- Open quotes waiting for client approval and their age.
- Planned maintenance completed against plan.
Accurate timings depend on accurate call logging. Out-of-hours calls that land on a mobile in a van are the usual weak point. An AI Employee such as Ava can answer those calls, take down the job, reach the engineer on call and send the details to your team, so the record of each call does not depend on someone remembering to write it down.
Red flags in an SLA
- Response time is not defined as attendance, make-safe or fix.
- The clock starts when the end user reports the fault to the client, not when the client tells you.
- No pause for access, approvals or parts.
- Uncapped deductions measured per job.
- Targets the same for every site regardless of distance.
- No route to review targets once real data exists.
For related guides, see selling planned preventative maintenance, working for insurers and home emergency networks and subcontracting for facilities management companies. Speed of first contact matters as much as speed on site; see how fast to call back plumbing enquiries.
Frequently asked questions
What is a realistic emergency response time for a small plumbing firm?
It depends on geography and cover. A small firm with a reliable on-call rota can often attend local emergencies within a few hours, but should set targets from its own travel times and winter workload, not from a competitor's brochure.
Should the SLA clock pause when we cannot get access?
Yes. Write it into the contract, along with what counts as evidence of an attempted visit, such as a timed photo and a call to the site contact.
What are service credits?
Deductions from your invoice when you miss agreed targets. Keep them capped, measured over a month or quarter, and limited to delays within your control.
Do legal timescales apply to commercial clients?
Not directly. Awaab's Law applies to social landlords, and gas escape duties apply to gas networks. They are useful reference points, but a commercial client's SLA is whatever the contract says.
References
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Awaab's Law: Guidance for social landlords - Timeframes for repairs in the social rented sector (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Energy Trends: UK gas, ET 4.1 natural gas supply and consumption (quarterly), September 2026 (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2026). Awaab's Law: Guidance for social landlords - Timeframes for repairs in the social rented sector (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1996). The Gas Safety (Management) Regulations 1996, regulation 7 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 52 (opens in a new tab) ↑
Office for National Statistics (Nomis) (2026). UK Business Counts - enterprises by industry and employment size band (SIC 2007 class 43.22), via Nomis (opens in a new tab) ↑