Key takeaways
- A competent person scheme lets you self-certify certain building work instead of getting building regulations approval[1].
- Within 30 days of completion, the installer must give the occupier a certificate and notify the building control authority[2].
- Homeowners who use a registered installer do not need to apply for approval themselves[3], which is a real selling point.
- MCS notifications accounted for 60% of UK heat pump sales in 2024[4], showing how certification gates access to grant-funded work.
What a competent person scheme does
Most plumbing and heating work that falls under the Building Regulations would, in theory, need a building notice or full plans application and an inspection by building control. Competent person schemes offer a different route. GOV.UK puts it simply: you can join a competent person scheme to self-certify certain types of building work instead of getting building regulations approval[1].
The scheme assesses your competence, inspects samples of your work and handles the notification to building control when you register a job. In return, you take responsibility for certifying that the work complies. GOV.UK lists installing a bathroom that involves plumbing, installing or replacing a heating system and adding extra radiators among the work that can need building regulations approval in England[3], so for a typical plumbing and heating firm membership is close to essential.
Which types of work schemes cover
GOV.UK lists authorised schemes by the type of work they cover. The categories most relevant to plumbing and heating firms are combustion appliances, heating and hot water systems, plumbing and water supply systems, electrical installations, and microgeneration and renewable technologies[1].
| Work type on GOV.UK | Typical jobs for a plumbing and heating firm | Point to watch |
|---|---|---|
| Combustion appliances: gas, oil and solid fuel | Boiler replacements, new gas fires, oil boilers, wood burners | Gas work also requires Gas Safe registration by law |
| Heating and hot water systems | New systems, cylinder replacements, unvented hot water | Unvented work usually needs specific training |
| Plumbing and water supply systems | Bathroom installations that involve plumbing | Separate from water company notification |
| Electrical installations | Boiler wiring that is notifiable, new circuits | See the Part P rules on notifiable work |
| Microgeneration and renewable technologies | Heat pumps, solar thermal | Grant schemes usually require MCS certification |
The list also includes air pressure testing, wall insulation, mechanical ventilation and air-conditioning, replacement windows and doors, and roof coverings[1]. Some plumbing firms add ventilation or air-conditioning as they move into heat pump and whole-house work.
Gas Safe is not quite the same thing
Gas Safe Register appears in the GOV.UK table, but it is footnoted as not technically a competent person scheme[1]. The difference matters. Gas Safe registration is a legal requirement: no employer or self-employed person may carry out work on a gas fitting unless they belong to a class of persons approved by the HSE, which in practice means the Gas Safe Register[5]. It also lets you notify building control of gas appliance installations. Competent person schemes for other work types are voluntary; the alternative is building control approval for each job.
The 30-day rule
30 days
Time after completion to give the occupier a certificate and notify building control[2]
Regulation 20 of the Building Regulations 2010 sets the timetable. Not more than 30 days after completing the work, the person carrying it out must give the occupier a copy of the certificate and give the building control authority either notice or the certificate[2]. In practice your scheme does the notification when you register the job, and the certificate goes to the occupier by post or email.
Late registration is one of the most common reasons schemes contact members. Build registration into job close-out, not into a monthly admin session, and check that the address and work description are right before submitting.
Why customers care
For the homeowner, the main benefit is that they do not need building regulations approval themselves if they use an installer registered with a competent person scheme[3]. The certificate is also what their solicitor asks for when they sell. A missing certificate for a boiler or bathroom can hold up a sale or lead to an indemnity policy, and the seller will remember whose job it was.
Certification also unlocks grant-funded work. MCS heat pump notifications accounted for 60% of total UK heat pump sales in 2024[4], and MCS reported 210,000 certified renewable installations in the UK from January to June 2026[6]. If you want to fit heat pumps under grant schemes, microgeneration certification is part of the entry ticket.
- Notified through MCS 60%
Source: Heating and Hotwater Industry Council (HHIC), 2024[4]
Show the data
| Item | Value |
|---|---|
| Notified through MCS | 60% |
Choosing schemes for your firm
- List the notifiable work you actually do in a typical year, by work type.
- Check which schemes cover each type, and whether one scheme can cover several.
- Compare assessment and inspection requirements, including how often your work will be sampled.
- Ask how job registration works: from a phone on site, through software, or by batch upload.
- Check what support comes with membership, such as technical helplines and guidance updates.
- Plan for growth: if you will start heat pump or electrical work, choose schemes you can extend.
Fewer schemes means less admin, but only if each one genuinely covers your work. Holding a scheme that does not include a job you do is the same as holding none for that job.
If you are not registered for a job
If you are not registered for a particular type of notifiable work, the customer or you must use building control instead: a building notice or full plans application before work starts, inspections during the job, and a completion certificate at the end. It works, but it adds time and paperwork. Emergency repairs to a boiler or heating system do not need advance approval[3], but the work still has to comply with the regulations.
Example: a heating firm adding bathrooms
Example: a three-person heating firm in Nottingham has Gas Safe registration and a heating scheme, and starts winning full bathroom refits. Their first bathroom includes moving the WC, adding a shower and a new radiator. The office manager realises their current scheme does not cover the plumbing and water supply work type. Rather than ask the customer to apply to building control, they add the work type to their scheme membership before the job starts.
On completion, the fitter registers the job from the van. The customer receives the certificate within a fortnight, comfortably inside the 30-day limit. When the customer sells the house two years later, the buyer's solicitor gets the certificate in a single email, and the seller recommends the firm to the buyer for their next job.
What scheme inspections usually pick up
Schemes inspect a sample of registered jobs, and the findings follow a pattern. Most are not dangerous workmanship but gaps between what was done and what was recorded. Knowing the usual findings lets you fix them in your process rather than one job at a time.
- Jobs registered late, or not registered at all because the fitter assumed the office would do it.
- Commissioning records missing flue gas readings, controls settings or system flushing details.
- Work registered under the wrong category, such as a bathroom logged as a heating job.
- Customer details that do not match the property address, which delays certificates.
- Installation photos missing for concealed work, so the inspector cannot confirm what is behind panels.
Treat each finding as a checklist item for the next job. A one-page close-out sheet that fitters complete before leaving site, with photos, commissioning results and the scheme category, removes most of these problems. It also helps when a customer phones months later, because the record of what was done is in one place rather than spread across messages and receipts.
If an inspector does find a technical fault, put it right quickly and record what you changed. Schemes generally look more kindly on a firm that responds well to a finding than on one that argues. Use the finding to brief the rest of the team so the same issue does not appear on the next inspection.
An admin routine that keeps you compliant
Tag notifiable work at quote
Mark each line that needs certification and note the scheme that covers it.
Capture details on completion
Record appliance make, model and serial number, and commissioning results, before leaving site.
Register the same week
Register the job with the scheme within days, not weeks, to stay well inside 30 days.
Check the certificate arrives
Ask the customer to confirm they have it, or send them a copy from the scheme portal.
Keep your own archive
Store certificates by address so you can answer solicitors' requests in minutes.
Frequently asked questions
Do I have to join a competent person scheme?
No, except that gas work legally requires Gas Safe registration. Without a scheme, notifiable work must go through building control approval instead.
How long do I have to certify the work?
Regulation 20 requires the certificate to go to the occupier, and notice or the certificate to go to building control, not more than 30 days after completion.
Does a homeowner need building control if I am registered?
No. Homeowners do not need building regulations approval themselves when they use an installer registered with a competent person scheme for that work.
Is Gas Safe a competent person scheme?
GOV.UK lists it alongside the schemes but notes it is not technically one. Gas Safe registration is a legal requirement for gas work.
References
GOV.UK (2026). Competent person scheme: current schemes and how schemes are authorised (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2010). The Building Regulations 2010, regulation 20 (opens in a new tab) ↑
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑
MCS (Microgeneration Certification Scheme) (2026). Record number of UK households combining renewables to improve energy resilience (opens in a new tab) ↑