Regulation compliance

The Building Safety Act: what changes for plumbers

The dutyholder and competence rules that followed the Building Safety Act, what they mean for plumbing firms on domestic jobs, and higher-risk buildings.

Ava research teamPublished 7 min read

On this page
  1. Why a plumber should care
  2. Dutyholders in plain terms
  3. When you are the only contractor
  4. Competence: what the law actually says
  5. Before you start: the client awareness duty
  6. Working as a subcontractor
  7. Higher-risk buildings
  8. A competence file for a small firm
  9. Example: a kitchen extension with three trades
  10. Frequently asked questions
  11. References

Key takeaways

  • Anyone carrying out building work must have the skills, knowledge, experience and behaviours needed to do it in line with all relevant requirements[1].
  • On a domestic job with one contractor, that contractor carries the client's duties[1], which describes most plumbing jobs.
  • A contractor must not start building work unless satisfied the client is aware of the client's duties[1].
  • Higher-risk buildings are at least 18 metres or 7 storeys with at least two homes, or are hospitals or care homes, and sit under the Building Safety Regulator[2].

Why a plumber should care

The Building Safety Act 2022 is usually discussed in terms of tower blocks and cladding, and many small plumbing firms assume it does not reach them. Part of it does. Amendments made under the Act inserted a new Part 2A into the Building Regulations 2010, setting out duties for clients, designers and contractors and competence requirements for everyone who carries out building work in England[1]. That includes notifiable plumbing and heating work in ordinary homes.

Most of what Part 2A asks for is what a good firm already does: plan the work, supervise people, make sure they are capable and raise problems. The change is that these are now legal duties with your name attached, and a building control officer or a court can ask how you met them. Having simple evidence ready is the practical response.

Dutyholders in plain terms

Dutyholder roles under Part 2A of the Building Regulations 2010, as they typically apply to domestic plumbing work.
RoleWho it usually is on a domestic plumbing jobCore duty
ClientThe homeowner or landlord paying for the workMake suitable arrangements for the work to comply; appoint principal roles where needed
DesignerWhoever designs the system, often the plumbing firm itselfDesign so that the work, if built as designed, would comply
ContractorThe plumbing firm and any subcontractorsPlan, manage and monitor their own work so it complies
Principal designerNeeded where more than one contractor is involvedPlan, manage and monitor the design phase
Principal contractorNeeded where more than one contractor is involvedPlan, manage and monitor the construction phase

Every person carrying out building work must make sure the work done by them, and by any workers under their control, is planned, managed and monitored so as to comply with all relevant requirements[1]. Where more than one contractor is involved, the client must appoint a principal designer and principal contractor in writing[1]. Where there is only one contractor, that contractor fulfils the principal contractor's duties[1].

When you are the only contractor

That last point captures most plumbing jobs. A boiler replacement, a bathroom refit or a cylinder change is usually one firm, start to finish. Part 2A also deals with domestic clients, who cannot be expected to know building law. Where the client is a domestic client, certain client duties must be carried out by the contractor where there is only one contractor for the project, or by the principal contractor where there is more than one[1]. In effect, on a typical domestic job, you carry the homeowner's duties as well as your own.

The UK plumbing and heating trade is overwhelmingly made up of small firms. Of 47,910 registered plumbing, heating and air-conditioning enterprises in 2026, 45,370, about 95%, were micro businesses with 0 to 9 employees[3]. Those firms rarely have a compliance department, so the duties land on the owner.

UK plumbing, heating and air-conditioning enterprises by size, 2026VAT or PAYE-registered enterprises in SIC 2007 class 43.22; firms with 250 or more employees not shown.
UK plumbing, heating and air-conditioning enterprises by size, 2026Stacked bar chart. 0 to 9 employees: 45,370; 10 to 49 employees: 2,270; 50 to 249 employees: 250.0 to 9 employees: 45,370 (95%)10 to 49 employees: 2,270 (5%)50 to 249 employees: 250 (1%)UK plumbing, heating and air-conditioning enterprises by size, 2026Stacked bar chart. 0 to 9 employees: 45,370; 10 to 49 employees: 2,270; 50 to 249 employees: 250.0 to 9 employees: 45,370 (95%)10 to 49 employees: 2,270 (5%)50 to 249 employees: 250 (1%)
  • 0 to 9 employees 45,370 95%
  • 10 to 49 employees 2,270 5%
  • 50 to 249 employees 250 1%

Source: Office for National Statistics (Nomis), 2026[3]

Show the data
ItemValue
0 to 9 employees45,370
10 to 49 employees2,270
50 to 249 employees250

The good news is that for a single-firm domestic job, the duties are proportionate. You need to know what the work must comply with, plan it, check it is done right and keep evidence. The rest of this guide sets out how.

Competence: what the law actually says

Part 2A sets two competence tests. An individual carrying out building work must have the skills, knowledge, experience and behaviours necessary to do it in accordance with all relevant requirements[1]. An organisation must have the organisational capability to do so[1]. A contractor must also be competent to fulfil the duties of a contractor under the regulations[1]. Someone who is in training to meet those requirements is exempt while they train[1], which covers apprentices working under supervision.

Competence is not defined by a single certificate. Qualifications, scheme memberships, manufacturer training, years of relevant work and a track record of compliant jobs all count. Behaviours matter too: following procedures, raising concerns and refusing to cut corners. For most firms, the evidence already exists; it just is not in one place.

  • Qualifications: plumbing and heating qualifications, water regulations, unvented hot water, energy efficiency.
  • Registrations: Gas Safe, competent person schemes, approved contractor schemes.
  • Product training: manufacturer courses for boilers, heat pumps and controls you fit.
  • Experience: a short note of the work types each person does regularly.
  • Behaviours: how you supervise new starters and how concerns are raised and recorded.

Before you start: the client awareness duty

One duty changes how you begin a job. A contractor must not start any building work unless satisfied that the client is aware of the duties owed by the client under the regulations[1]. Designers have a matching duty before starting design work[1]. On a domestic job, you meet this with a short, plain explanation at quote or booking stage.

A sentence for quotes: Building work in your home must meet the Building Regulations. As your only contractor, we will plan and carry out the work to comply, register it with our scheme where it is notifiable, and give you the certificate. If you plan to use other trades on this project, please tell us, because the rules then need a principal contractor.

Keep the wording with the quote or order confirmation. If anything goes wrong later, it shows you told the client what they needed to know before starting.

Working as a subcontractor

On larger refurbishments you may be one of several trades under a builder acting as principal contractor. Your duties then include giving each worker under your control appropriate supervision, instructions and information, and reporting any concerns about compliance to the principal contractor rather than the client[1]. If you see another trade's work that would stop yours complying, such as a joist notched where your pipe must run, say so in writing to the principal contractor.

You must also, if asked, advise the principal contractor or client on whether any work is higher-risk building work[1]. You are not expected to measure the building, but you should know the criteria well enough to raise the question.

Higher-risk buildings

During building work in an existing building, a higher-risk building is one that is at least 18 metres in height or has at least 7 storeys, and contains at least two residential units, or is a care home or hospital[2]. These buildings sit under a regime directly overseen by the Building Safety Regulator[2], with stricter approval and change control. Replacing a boiler in a flat on the ninth floor of a residential block is not the same paperwork as replacing one in a semi.

If an enquiry comes from a flat in a tall block, ask the managing agent whether the building is higher-risk and how building work is approved before you quote. Do not assume your usual competent person scheme route applies; check first.

A competence file for a small firm

  1. One page per person

    List each fitter's qualifications, registrations, product training and the work types they do. Update it when anything changes.

  2. One page for the firm

    Describe how jobs are planned, supervised and checked, who signs off notifiable work, and how concerns are raised.

  3. Standard quote wording

    Add the client awareness sentence to every quote for notifiable work.

  4. Job close-out record

    Keep photos, commissioning results and certificates for each job, filed by address.

  5. Annual review

    Once a year, check the file against the work you now do. New work types, such as heat pumps, need new evidence.

The competent person schemes you already belong to remain the main way to certify notifiable work[4]. Part 2A sits alongside them rather than replacing them.

Example: a kitchen extension with three trades

Example: a homeowner in Reading hires a builder for a kitchen extension, an electrician for the wiring and a plumbing firm for underfloor heating and a boiler move. The builder has been appointed principal contractor in writing. Moving the boiler and adding a heating system is work that can need building regulations approval[5], so the plumber confirms with the builder how it will be certified and who notifies building control.

During first fix the plumber finds the planned flue position is too close to a new opening window. Instead of quietly rerouting, the plumber emails the principal contractor with a photo and a proposed alternative, which is agreed the same day. The email goes into the job file next to the commissioning sheet. If building control asks how compliance was managed, the record is there.

Frequently asked questions

Does the Building Safety Act apply to boiler replacements?

The dutyholder and competence rules in Part 2A of the Building Regulations apply to building work in England, including notifiable plumbing and heating work in homes, not just tall buildings.

Who is the principal contractor on a domestic plumbing job?

Where there is only one contractor, that contractor fulfils the principal contractor's duties. Where there are several, the client should appoint one in writing.

Do apprentices have to meet the competence requirements?

Part 2A exempts individuals who are in training to meet the competence requirements, so apprentices can work under appropriate supervision.

What makes a building higher-risk?

During work on an existing building, it is at least 18 metres or 7 storeys and contains at least two residential units, or it is a care home or hospital.

References

  1. legislation.gov.uk (The National Archives) (2023). The Building Regulations 2010, Part 2A: dutyholders and competence (opens in a new tab) ↑

  2. GOV.UK (2025). Criteria for determining whether an existing building is a higher-risk building during building work (opens in a new tab) ↑

  3. Office for National Statistics (Nomis) (2026). UK Business Counts - enterprises by industry and employment size band (SIC 2007 class 43.22), via Nomis (opens in a new tab) ↑

  4. GOV.UK (2026). Competent person scheme: current schemes and how schemes are authorised (opens in a new tab) ↑

  5. GOV.UK (2026). Building regulations approval (opens in a new tab) ↑