Key takeaways
- Hot water systems must resist the effects of temperature and pressure, and stored water must never exceed 100°C[1].
- In new dwellings and material changes of use, water delivered to a fixed bath must not exceed 48°C[1].
- New homes in England must be designed for no more than 125 litres per person per day, or 110 where planning makes it a condition[2].
- Bathroom installs with plumbing and new heating systems can need building regulations approval, unless a competent person scheme member does the work[3].
What Part G covers
Part G of Schedule 1 to the Building Regulations 2010 is the part plumbers meet most often. It is titled sanitation, hot water safety and water efficiency, and it sets requirements rather than methods. Approved Document G then gives guidance on ways to meet them. The requirements fall into six areas:
- G1: a supply of wholesome cold water, including to sinks where food is prepared.
- G2: water efficiency in new dwellings.
- G3: hot water supply and systems, including safety devices and the bath temperature limit.
- G4: sanitary conveniences and washing facilities.
- G5: bathrooms in dwellings.
- G6: food preparation areas.
Regulation 4 is what makes these bite. Building work must comply with the applicable requirements of Schedule 1, and where a building is materially altered or a controlled fitting is provided, the work must not leave it more unsatisfactory than before in relation to any requirement[4]. In practice that means a bathroom refit cannot make the hot water supply less safe, even if the old installation was not perfect.
Hot water safety: what G3 requires
| G3 requirement | What it says | What it means on site |
|---|---|---|
| G3(1) supply | A suitable installation supplying heated water to washbasins, bidets, baths, showers and food preparation sinks | Every specified outlet gets hot water from a suitable system |
| G3(2) temperature and pressure | Systems, including cisterns and vessels that supply or receive expansion water, resist the effects of temperature and pressure in normal use and reasonably anticipated malfunction | Correctly rated components, adequate support, expansion accommodated |
| G3(3) storage vessels | Stored water never exceeds 100°C, and discharge from safety devices is conveyed safely to where it is visible | Thermostat plus temperature and pressure relief, with a visible, safe discharge route |
| G3(4) baths | Water delivered to a fixed bath does not exceed 48°C, in new dwellings and material changes of use | An in-line blending valve or equivalent device on the bath supply |
The wording matters. G3(2) talks about reasonably anticipated malfunction[1], so the question is not just whether the system works, but what happens when a thermostat sticks or a valve fails. G3(3) makes the 100°C ceiling and the visible discharge explicit for any system with a hot water storage vessel, apart from systems heating or storing water only for an industrial process[1].
The 48°C bath limit
G3(4) says the hot water supply to any fixed bath must be designed and installed so that the water that can be delivered to that bath does not exceed 48°C[1]. It applies only when a dwelling is erected or formed by a material change of use[1], such as a barn conversion, a house split into flats or a commercial building turned into homes. A like-for-like bath replacement in an existing house does not trigger it, though many plumbers fit a blending valve anyway because it is good practice.
The limit is about scalding, which hurts the youngest and oldest most. A bath filled straight from a cylinder stored hot enough to control legionella can scald in seconds. The usual way to comply is a thermostatic mixing valve on the bath supply, set and commissioned to deliver no more than 48°C. Our guide to TMV installation and servicing covers commissioning and maintenance.
Storage, relief and discharge
Unvented cylinders get most of the attention, but G3(3) applies to any system with a hot water storage vessel. The two duties are to stop stored water ever exceeding 100°C and to make sure any discharge from safety devices is safely conveyed to where it is visible and will not cause danger to people in or about the building[1]. Approved Document G then describes how to achieve that, including the discharge pipe arrangements from relief valves.
- Fit the relief valves the manufacturer specifies, and never cap or plug them.
- Route discharge pipework so a discharge is visible, for example through a tundish where it can be seen.
- Terminate discharge where it cannot scald someone walking past or splash onto a path.
- Size and fall the discharge pipe according to the guidance and the manufacturer's instructions.
- Explain to the customer what a discharge looks like and that it must be reported, not ignored.
Water efficiency: the per-person limit
Regulation 36 sets a water efficiency limit for new dwellings. In England, the potential consumption of wholesome water must not exceed 125 litres per person per day, calculated by the approved methodology; where planning permission makes the optional requirement a condition, the limit is 110 litres per person per day[2]. In Wales, new dwellings have a limit of 110 litres per person per day, and dwellings formed by a material change of use 125[2].
Source: legislation.gov.uk (The National Archives), 2010[2]
Show the data
| Item | Value |
|---|---|
| England standard | 125 litres per person per day |
| England optional (planning condition) | 110 litres per person per day |
| Wales new dwellings | 110 litres per person per day |
The calculation is usually done by the designer, but it rests on the fittings you install: WC flush volumes, shower flow rates, tap flow rates and bath capacity. If you substitute a higher-flow shower or a bigger bath during the build, you can push the dwelling over its limit. Ask for the water efficiency calculation on new-build jobs, and do not swap specified fittings without checking.
When Part G work needs building control
GOV.UK lists installing a bathroom that involves plumbing, installing or replacing a heating system and adding extra radiators among work that can need building regulations approval in England[3]. Homeowners do not need to apply themselves if they use an installer registered with a competent person scheme[3]. Emergency repairs to a boiler or heating system do not need advance approval, though the rules still apply to the work[3].
The hot water side is changing too. In England in 2024, 63% of homes had a condensing combination boiler and 19% another type of condensing boiler[5]. As more homes move to heat pumps with stored hot water, G3 storage and discharge rules will apply to more of your jobs, not fewer.
Cold water, sanitary provision and kitchens
Hot water gets the attention, but the rest of Part G shapes most bathroom and kitchen layouts. G1 is about a supply of wholesome cold water to the places that need it, including any tap where drinking water is drawn and sinks where food is prepared. If a customer wants softened water throughout, the usual approach is to keep an unsoftened drinking water tap at the kitchen sink, and Approved Document G explains the options.
G4 and G5 deal with sanitary conveniences, washing facilities and bathrooms. A WC needs a washbasin with hot and cold water nearby, and a dwelling needs at least one bathroom with a fixed bath or shower. G6 requires a suitable sink in food preparation areas in dwellings. These requirements rarely cause problems in a straight refit, but they matter in conversions, annexes and loft rooms where the layout is new.
- On conversions, check that each new WC has a basin with hot and cold water close by.
- When moving a kitchen sink, keep a wholesome cold water tap at it, not only softened or filtered water.
- Where a pumped WC or macerator is proposed, check the manufacturer's conditions and the guidance before agreeing to it.
- Leave the customer a short note of what was installed, where the isolation valves are and how the hot water is protected.
Checklist for a bathroom or cylinder job
Classify the job
Is it a new dwelling, a material change of use, or work in an existing home? That decides whether G2 and G3(4) apply.
Check approval route
Decide whether you will self-certify through a competent person scheme or the customer needs building control approval.
Confirm the hot water source
Note whether hot water is stored or instantaneous, and identify the safety devices that apply.
Plan discharge and blending
Design the discharge route before first fix, and include a bath blending valve where G3(4) applies.
Protect the efficiency calculation
On new builds, fit the specified fittings or get written approval for any change.
Commission and record
Record cylinder and outlet temperatures, valve settings and discharge checks on the commissioning sheet.
Example: a barn conversion
Example: a plumber is asked to fit two bathrooms and an unvented cylinder in a barn being converted into a family home in Herefordshire. Because this is a material change of use, both the 48°C bath limit and the water efficiency limit apply. The plumber asks the architect for the water efficiency calculation and finds it assumes a 6 litre WC and a low-flow shower head. The client wants a rainfall shower, so the plumber flags it before ordering.
The designer re-runs the calculation with a slightly lower-flow rainfall head that still meets the limit. Both baths get thermostatic blending valves set to 48°C. The cylinder discharge is routed through a tundish in the plant room, visible from the door, to a safe external termination. The commissioning sheet records every setting, and the building control officer signs the work off at the first inspection.
Frequently asked questions
Does the 48°C bath limit apply to every bathroom?
No. G3(4) applies when a dwelling is erected or formed by a material change of use. A replacement bath in an existing house does not trigger it, although fitting a blending valve is still good practice.
What is the water efficiency limit for new homes in England?
125 litres per person per day, or 110 where planning permission makes the optional requirement a condition. It is calculated using the approved methodology.
Do I need building control for a bathroom refit?
Installing a bathroom that involves plumbing can need building regulations approval in England. If you are registered with a competent person scheme, you can self-certify instead.
What temperature must stored hot water never exceed?
Part G requires precautions so that stored water never exceeds 100°C, together with a safe, visible route for any discharge from safety devices.
References
legislation.gov.uk (The National Archives) (2010). The Building Regulations 2010, Schedule 1, Part G (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2010). The Building Regulations 2010, regulation 36: water efficiency of new dwellings (opens in a new tab) ↑
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2010). The Building Regulations 2010, regulation 4: requirements relating to building work (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑