Key takeaways
- Installing or replacing a heating system can need building regulations approval; using a competent person scheme means the homeowner does not have to apply themselves[1].
- The regulations give you 30 days after completion to give the occupier the certificate and notify building control[2].
- Contravening building regulations is a criminal offence with fines and a further daily fine while the default continues[3].
- Emergency boiler repairs need no advance approval, but the rules still apply to the work[4].
Why notification exists
Installing a boiler is building work. In England, installing or replacing a heating system, adding radiators and fitting a bathroom with new plumbing can all need building regulations approval[1]. Rather than every homeowner applying to building control, the law lets registered installers self-certify through a competent person scheme, and homeowners who use such an installer do not need approval themselves[1]. For gas work, that scheme is run alongside Gas Safe registration, which is itself a legal requirement for anyone working on gas fittings for a living[5].
Notification is the part of that bargain that falls on you. It tells building control the work was done by someone competent and triggers the certificate the homeowner keeps with the house.
The volume is large because gas dominates home heating. At Census 2021, 73.8% of households in England and Wales, 18.3 million homes, used mains gas central heating[6]. Nearly every gas boiler replacement in those homes is notifiable.
- Mains gas 73.8%
- Electric 8.5%
- Two or more types 8.5%
- No central heating 1.5%
- Other types (remainder) 7.7%
Source: Office for National Statistics, 2021[6]
Show the data
| Item | Value |
|---|---|
| Mains gas | 73.8% |
| Electric | 8.5% |
| Two or more types | 8.5% |
| No central heating | 1.5% |
| Other types (remainder) | 7.7% |
What the regulations actually say
Regulation 20 of the Building Regulations 2010 sets the timetable for work done under a self-certification scheme. Not more than 30 days after completing the work, the person who carried it out must give the occupier a copy of the certificate and give the building control authority either a notice or the certificate itself[2].
30 days
Time after completion to give the occupier the certificate and notify building control[2]
In practice your scheme does most of the mechanics. You submit the notification through it, the scheme passes it to building control and the homeowner receives a Building Regulations Compliance Certificate. The legal duty still sits with the installer, so a notification you meant to send but did not is your problem, not the scheme's.
Which jobs to notify
| Job | Notify? | Notes |
|---|---|---|
| Boiler replacement | Yes | The most common notifiable gas job |
| New boiler where none existed | Yes | Treat as a new heating installation |
| Moving a boiler to a new position | Yes, normally | Treat relocation as installing the appliance again |
| New heating system or extra radiators | Can be | Check against the current scheme list |
| Like-for-like part replacement during a repair | Usually not | Record the work on the job sheet |
| Emergency boiler replacement | Yes, after the event | No advance approval needed, but the rules still apply |
The emergency row matters in winter. Emergency repairs to a boiler or heating system do not need advance building regulations approval, but the work still has to comply[4]. If an emergency call ends with a replacement boiler, notify it like any other installation once the dust has settled, and do not let the urgency of the job mean the paperwork never happens.
The notification step by step
Finish commissioning
The completion date is the day the boiler is commissioned and handed over, which starts the 30-day clock.
Gather the details
Customer name and full address, appliance make, model and serial number, location in the property and the engineer who did the work.
Submit through your scheme
Use your scheme's online portal or app, ideally the same day, and note the reference it returns.
Tell the customer what to expect
Explain that a compliance certificate will arrive from the scheme by post or email and that they should keep it with the house documents.
Check it landed
Review open notifications weekly and chase any not confirmed.
Close the job
Record the notification reference on the job file next to the commissioning record.
What the customer receives and why they care
The homeowner receives a compliance certificate confirming the appliance was installed by a registered business and notified to building control. Most never look at it again until they sell. Then the buyer's conveyancer asks for certificates for any boiler installed since the owner bought the property, and a missing certificate can delay exchange while everyone works out what happened.
Tell customers this at handover. A sentence such as 'You will get a certificate in the next few weeks; keep it with the deeds, because a buyer's solicitor will ask for it' saves you a phone call in five years. Ask them to let you know if it has not arrived.
Landlords and letting agents deserve a slightly different handover. The certificate goes to the occupier under the regulations, which for a rented home is the tenant, so send the owner or agent their own copy and the notification reference at the same time. Agents managing many properties appreciate a simple line on the invoice confirming the job was notified and when.
If a customer asks for a replacement certificate years later, they can usually request one from the scheme using the property address. Keeping your notification reference on file makes that request quick.
Penalties and the less obvious consequences
Contravening a provision of the building regulations is an offence under section 35 of the Building Act 1984. On summary conviction it can lead to imprisonment, a fine or both, on indictment to up to two years' imprisonment, a fine or both, and in either case a further fine for each day the default continues[3]. Prosecutions over a single missed notification are uncommon, but the exposure is real.
- Scheme sanctions: competent person schemes audit members and can act on repeated late or missing notifications.
- Customer complaints: a missing certificate at house sale is a common reason customers come back angry, often years later.
- Warranty problems: manufacturers sometimes check that the installation was notified before accepting a claim.
- Lost evidence: without notification there is no independent record that a registered engineer did the work.
Worked Example: a missing certificate at house sale
Example. A homeowner selling a terrace finds no compliance certificate for the combi a local firm fitted four years earlier. The buyer's conveyancer asks for it. The firm checks its job file: the commissioning record is complete, but the notification was never submitted because the job finished on a Friday before Christmas and the paperwork stayed in the van.
Example. The firm contacts its scheme, explains the error and submits a late notification, which the scheme processes after checking the details. The sale goes through a fortnight late. The firm changes its procedure so engineers notify from the van before leaving site, and the office reviews open notifications every Monday.
An office routine that does not rely on memory
Missed notifications almost never come from engineers who do not care. They come from busy weeks, jobs finished late on a Friday, an emergency replacement squeezed in between breakdowns, or an engineer who thought the office was doing it while the office thought the engineer had. A routine removes the guesswork.
- Make one person responsible for notifications, with a named deputy for holidays and sickness.
- Have engineers submit from site wherever the scheme app allows, and photograph the confirmation screen to the job.
- Add a notification status to every installation job, with three states: not started, submitted, confirmed.
- Run a weekly report of installations completed more than seven days ago that are not yet confirmed, and clear it the same day.
- Treat emergency replacements as installations in the job system from the moment the decision to replace is made, so they cannot hide among repair jobs.
- Check a handful of completed jobs each quarter against the scheme's record to make sure the two agree.
The routine costs a few minutes a week. Compare that with tracing a four-year-old job for a seller whose buyer is threatening to pull out, and it is an easy decision.
Subcontracted installs need a clear agreement. If a self-employed engineer fits a boiler on your behalf, decide in writing whose registration the notification goes under, and check the engineer is registered for that appliance type, before the job starts rather than after.
England, Wales, Scotland and Northern Ireland
The Building Regulations 2010 and the 30-day rule described here apply in England and in Wales, where the Welsh Government has made its own amendments over time. Scotland and Northern Ireland run separate building standards systems with their own approval and certification routes. If you work across a border, check the current rules for each nation with your scheme rather than assuming the English process applies.
For the records that sit alongside notification, see completing the Benchmark checklist and registering boiler warranties.
Frequently asked questions
How long do I have to notify a boiler installation?
Not more than 30 days after completing the work, you must give the occupier a copy of the certificate and notify building control, which your competent person scheme does on your behalf when you submit the notification.
Does an emergency boiler replacement need notifying?
Yes. Emergency work does not need advance approval, but it still has to comply and a replacement boiler should be notified once fitted.
What happens if I forget to notify?
Contact your scheme straight away about a late notification. Contravening building regulations is an offence, and the missing certificate usually surfaces when the property is sold.
Does the homeowner need to apply to building control?
No, not if they use an installer registered with a competent person scheme.
References
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2010). The Building Regulations 2010, regulation 20 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1984). Building Act 1984, section 35 (opens in a new tab) ↑
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑
Office for National Statistics (2021). Housing, England and Wales: Census 2021 (opens in a new tab) ↑