Regulation compliance

TMVs: where they're required and how to service them

Where thermostatic mixing valves are required or advisable, how to commission them, and an annual service routine that keeps outlets safe from scalding.

Ava research teamPublished 6 min read

On this page
  1. Two hazards, one valve
  2. Where a TMV is required, and where it is wise
  3. Choosing the right valve
  4. Installation points that save trouble later
  5. Commissioning, step by step
  6. Annual checks and servicing
  7. Common faults and their causes
  8. Hot surfaces are part of the same risk
  9. Example: a small care home contract
  10. Records to leave behind
  11. Frequently asked questions
  12. References

Key takeaways

  • In new dwellings and material changes of use, water delivered to a fixed bath must not exceed 48°C[1].
  • Where vulnerable people bathe, HSE says water for whole-body immersion must not exceed 44°C[2].
  • Legionella control needs stored water at 60°C and hot outlets reaching 50°C within a minute[3], which is why mixing happens at the point of use.
  • HSE expects TMVs and outlet temperatures to be monitored and maintained so the controls stay effective[2].

Two hazards, one valve

Hot water systems have to balance two risks that pull in opposite directions. Legionella bacteria need to be controlled by heat: HSE's guidance says hot water should be stored at 60°C or above and should reach at least 50°C within one minute at outlets[3]. Water at those temperatures can scald, especially young children, older people and anyone with reduced sensation or mobility.

A thermostatic mixing valve resolves that tension. It blends hot and cold water close to the outlet and holds the mixed temperature steady even when supply pressures or temperatures change, shutting down if the cold supply fails. HSE's guidance on scalding is explicit that any precautions taken should not introduce other risks, for example from legionella[2]. Storing hot and blending late is how you meet both aims.

Where a TMV is required, and where it is wise

Where TMVs are required or advisable, from Part G of the Building Regulations and HSE's guidance on scalding.
SettingWhat the rules sayWhat that means for you
New dwelling or material change of use, fixed bathWater delivered to the bath must not exceed 48°CFit a device such as a TMV on the bath supply and commission it to 48°C or below
Care homes and settings with vulnerable people, baths and showersWater for whole-body immersion must not exceed 44°C where vulnerable people are at riskTMVs on baths and showers, commissioned and maintained to 44°C or below
NHS settings, electric showersHSE notes a maximum of 41°C required in the NHSCheck the client's own policy and healthcare guidance
Existing homesNo general legal requirement for a replacement bathRecommend a TMV where children, older or disabled people live

The Building Regulations requirement comes from G3(4): the hot water supply to any fixed bath must be designed and installed so that the water that can be delivered to that bath does not exceed 48°C[1]. It applies only when a dwelling is erected or formed by a material change of use[1]. Installing a bathroom that involves plumbing can also need building regulations approval in England, which a competent person scheme member can self-certify[4].

In health and social care, HSE's guidance goes further. Where vulnerable people are at risk from scalding during whole-body immersion, water temperatures must not exceed 44°C, and where storage or distribution temperatures are high, baths and showers should be fitted with TMVs to keep water at or below that level[2]. For basins, HSE says the risk is lower, but where someone is vulnerable, adequate controls on output temperature, such as TMVs, should be in place[2].

HSE scald limits in health and social carePart G separately limits bath water in new dwellings to 48°C.
HSE scald limits in health and social careComparison. Electric showers in the NHS (maximum): 41 °C; Accessible hot surfaces (maximum): 43 °C; Whole-body immersion for vulnerable people (maximum): 44 °C.41 °CElectric showers in the NHS(maximum)Electric showers in the NHS (maximum): 41 °C43 °CAccessible hot surfaces(maximum)Accessible hot surfaces (maximum): 43 °C44 °CWhole-body immersion forvulnerable people (maximum)Whole-body immersion for vulnerable people (maximum): 44 °CHSE scald limits in health and social careComparison. Electric showers in the NHS (maximum): 41 °C; Accessible hot surfaces (maximum): 43 °C; Whole-body immersion for vulnerable people (maximum): 44 °C.41 °CElectric showers in the NHS(maximum)Electric showers in the NHS (maximum): 41 °C43 °CAccessible hot surfaces (maximum)Accessible hot surfaces (maximum): 43 °C44 °CWhole-body immersion for vulnerablepeople (maximum)Whole-body immersion for vulnerable people (maximum): 44 °C

Source: Health and Safety Executive, 2026[2]

Show the data
ItemValue
Electric showers in the NHS (maximum)41 °C
Accessible hot surfaces (maximum)43 °C
Whole-body immersion for vulnerable people (maximum)44 °C

Choosing the right valve

  • Match the valve's performance designation to the setting: valves certified for healthcare use are tested to a stricter specification than domestic ones.
  • Check the supply conditions: high or low pressure, balanced or unbalanced, gravity or mains, and the minimum flow the valve needs.
  • Confirm the valve carries a recognised water regulations approval for the way you will install it.
  • Choose a valve with integral strainers and check valves, or plan to fit them, so debris and cross-flow do not upset the mix.
  • For multiple outlets from one valve, check the manufacturer allows it and that pipe runs after the valve are short.

Valves built into bath fillers or shower mixers can meet the requirement if their certification covers the use. Separate in-line TMVs are easier to service and are the usual choice in care settings, where access for maintenance matters more than appearance.

Installation points that save trouble later

  • Fit isolation valves on both inlets so the TMV can be serviced without draining the system.
  • Install the valve as close to the outlet as the manufacturer recommends, to limit the length of blended water pipework.
  • Leave an access panel; a valve that cannot be reached will not be serviced.
  • Flush supply pipework thoroughly before connecting the valve to avoid debris in the cartridge.
  • Label the valve with its location and set temperature for the maintenance log.

Commissioning, step by step

  1. Record supply conditions

    Measure hot and cold supply temperatures and pressures at the valve inlets. These are your baseline for later checks.

  2. Set the mixed temperature

    Adjust the valve to the required maximum for the setting, such as 48°C for a new dwelling bath or 44°C for a care home bath, using a calibrated thermometer at the outlet.

  3. Check stability

    Open and close other outlets on the same supplies and confirm the mixed temperature stays stable.

  4. Test the fail-safe

    Isolate the cold supply and confirm the valve shuts off or reduces flow to a safe trickle as the manufacturer specifies. Restore the supply and recheck the temperature.

  5. Record and hand over

    Write down the set temperature, supply readings, fail-safe result and date, and give the owner a copy with the maintenance schedule.

Annual checks and servicing

HSE's guidance is short and firm: outlet temperatures and TMVs should be monitored and maintained to ensure the controls are effective[2]. Most manufacturers and certification schemes recommend an early in-service check after commissioning and then regular checks at intervals based on what you find. Agree the interval with the client in writing, and shorten it where water is hard or results drift.

  1. Measure the mixed outlet temperature and compare it with the commissioning record.
  2. If it has moved, find out why before adjusting: check supply temperatures, strainers and check valves.
  3. Isolate, remove and clean strainers and filters; descale or replace the cartridge as the manufacturer advises.
  4. Repeat the fail-safe test with the cold supply isolated.
  5. Re-set if needed, record all readings and note any parts replaced.

A valve that keeps drifting is telling you something. Hard water, debris from old pipework or a failing check valve are the usual causes. Replacing the cartridge without fixing the cause means a callback within months.

Common faults and their causes

  • Mixed temperature creeping up over months: usually scale on the thermostatic element or a partly blocked cold strainer.
  • Temperature swinging when other taps are used: unbalanced supplies, undersized pipework or a failing check valve.
  • Poor flow at the outlet: blocked strainers or a valve below its minimum operating flow.
  • No shut-off on the fail-safe test: a worn cartridge or debris holding the shuttle open, which needs immediate attention.
  • Hot water appearing at a cold tap nearby: cross-flow through a failed check valve inside the TMV.

Record which fault you found and what fixed it. Over a few years the log shows which valves, sites and water conditions need closer attention.

Hot surfaces are part of the same risk

Scald risk is not only about water. HSE's guidance for health and social care settings says that where people could come into contact with hot pipes or radiators, the surface should not exceed 43°C when the system is running at its maximum design output[2]. When you install or service TMVs in a care home, look at exposed pipework and radiators in the same rooms and recommend guards or low-surface-temperature emitters where needed.

Example: a small care home contract

Example: a plumbing firm wins the maintenance contract for a twelve-bed care home in Norwich. The home has a stored hot water system at 60°C and TMVs on every bath, shower and basin used by residents. The firm's first visit finds two bath valves delivering above 44°C and one with no fail-safe response. The service records show no checks for over a year.

The firm replaces the faulty cartridge, cleans all strainers, re-commissions every valve and creates a log for each outlet with location, set temperature and supply readings. It agrees a schedule of checks with the manager, with closer intervals for the two valves that drifted. Six months later both are still holding temperature, and the home's inspection paperwork includes a complete TMV record for the first time.

Records to leave behind

  • A TMV schedule listing each valve, its location, outlet served and set temperature.
  • Commissioning sheets with supply temperatures and pressures and fail-safe results.
  • A service log with each check date, readings, actions and parts replaced.
  • The manufacturer's maintenance instructions for each valve type.

In homes, combination boilers deliver hot water on demand, but heat pump and cylinder systems store it. In England 19% of homes had a condensing boiler other than a combination boiler in 2024[5], and many of those feed cylinders, so ask about blending whenever you work on stored hot water.

Frequently asked questions

Is a TMV a legal requirement on every bath?

No. Part G requires bath water to be limited to 48°C in new dwellings and material changes of use. In existing homes it is not generally required, but it is often recommended.

What temperature should a care home bath TMV be set to?

HSE says that where vulnerable people are at risk during whole-body immersion, water temperatures must not exceed 44°C.

How often should TMVs be serviced?

HSE expects TMVs to be monitored and maintained so they remain effective. Follow the manufacturer's schedule and adjust intervals based on results and water hardness.

Does a TMV increase legionella risk?

It can if blended water pipework is long or rarely used. Fit valves close to outlets, keep blended runs short and flush little-used outlets.

References

  1. legislation.gov.uk (The National Archives) (2010). The Building Regulations 2010, Schedule 1, Part G (opens in a new tab) ↑

  2. Health and Safety Executive (2026). Scalding and burning (opens in a new tab) ↑

  3. Health and Safety Executive (2026). Legionella: things to consider for hot and cold water systems (opens in a new tab) ↑

  4. GOV.UK (2026). Building regulations approval (opens in a new tab) ↑

  5. Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑