Key takeaways
- G3 requires stored water never to exceed 100°C and safety discharges to be visible but harmless[1].
- Unvented installs are notifiable building work; registered competent persons self-certify instead of notifying building control first[2].
- The discharge run is where most installs fail inspection: tundish within 600mm of pipe from the valve, then 300mm vertical before any bend[2].
- Leave the customer the labelled unit, the certificate and the instructions, and book the first annual service before you leave.
What requirement G3 actually says
Unvented hot water is controlled by requirement G3 in Schedule 1 to the Building Regulations 2010. A hot water system, including any vessel that supplies or receives expansion water, must resist the temperature and pressure it may meet in normal use or in a reasonably foreseeable malfunction, and must be adequately supported[1]. A system with a storage vessel must include precautions to stop the stored water exceeding 100°C at any time and to make sure any discharge from safety devices is safely conveyed to where it is visible but will not endanger anyone in or around the building[1]. Separately, hot water delivered to a fixed bath must not exceed 48°C[1].
Approved Document G gives the practical ways to meet those requirements in England. It is the document a building control body or a competent person scheme inspector will hold your installation against, so it is worth knowing the paragraphs on packages, labelling and discharge in detail rather than relying on what the last cylinder you fitted looked like.
Who may install an unvented system
Approved Document G says building owners should choose installers with the necessary skills, which can be shown by registration with a competent person scheme for this type of work or by holding a current registered operative skills certification card for unvented hot water systems[2]. In other words, the G3 card on its own shows the individual's competence, while scheme registration lets the business self-certify.
The installation of an unvented system is notifiable building work. Without scheme registration it must be notified to the building control body before work starts[2]. If the installer is registered with a competent person scheme for unvented hot water, advance notice is not needed; the installer self-certifies, and the owner receives a building regulations compliance certificate, usually issued by the scheme operator[2]. More broadly, using a scheme-registered installer means the homeowner does not need to get building regulations approval themselves[3].
For a small firm, the practical set-up is simple. Make sure every engineer who fits or services unvented cylinders holds a current card, keep copies on file with expiry dates, and add unvented hot water to your competent person scheme registration so you can self-certify. Diary the renewal dates the same way you diary gas reassessments. If an engineer's card lapses, take them off unvented work until it is renewed, because the certificate you issue relies on it.
Choosing and checking the unit
Water heaters of 15 litres or less with appropriate temperature and pressure safety devices will generally satisfy G3(3)[2]. Above that, any unvented system up to 500 litres and under 45kW should be a proprietary unit or package meeting an appropriate standard, rather than an assembly of separate parts chosen on site[2]. Check the data plate before you sign for delivery.
- Manufacturer's name and contact details, and a model reference[2].
- Rated storage capacity, the operating pressure of the system and of the expansion valve[2].
- Operating data for each safety device fitted[2].
- For indirect units, the maximum primary circuit pressure and flow temperature[2].
- The user and installer warning label, visible after installation, with your name, address, phone number and the completion date filled in[2].
Before you commit to an unvented upgrade, check that the incoming main can support it. Measure pressure and flow at the property, at the time of day the household uses most water, and compare them with the manufacturer's minimum requirements. A cylinder fed by a weak supply produces a disappointed customer, however well it is installed.
Getting the discharge pipework right
The discharge run is where unvented installations most often fail inspection, usually because the cylinder position was fixed before anyone worked out where the discharge could go. Plan the route at survey, alongside the cylinder location.
D1 from the valves
Safety devices such as the temperature relief or combined temperature and pressure relief valve discharge through a short length of metal pipe, D1, to a tundish; D1 must be no smaller than the valve outlet[2].
Tundish position
The tundish must be vertical, in the same space as the cylinder, as close as possible to and lower than the safety device, with no more than 600mm of pipe between the valve outlet and the tundish[2].
Air gap and visibility
The tundish should include an air gap to satisfy the water fittings rules, and any discharge should be visible at the tundish[2].
D2 from the tundish
D2 needs a vertical section at least 300mm long below the tundish before any elbow or bend, then a continuous fall of at least 1 in 200[2].
Warning where discharge may go unseen
Where occupants may not notice a discharge, for example people with impaired vision or mobility, consider an electronic device that warns when discharge happens[2].
Termination
Size D2 for its equivalent length and terminate it where a hot discharge is visible but cannot harm anyone, following the manufacturer's instructions and Approved Document G.
Source: GOV.UK (Ministry of Housing, Communities and Local Government), 2024[2]
Show the data
| Item | Value |
|---|---|
| Maximum pipe from valve outlet to tundish (D1) | 600 mm |
| Minimum vertical drop below tundish before any bend (D2) | 300 mm |
Water supply rules to check alongside
The Water Supply (Water Fittings) Regulations 1999 require notice to the water undertaker, and its consent, before installing certain fittings[4]. Unvented cylinders are not named on that list, but two items that often come with an unvented upgrade are: a bath holding more than 230 litres, and a pump or booster drawing more than 12 litres per minute connected to a supply pipe[4]. If the customer wants either, notify before you start.
Replacing a heating or hot water system can also bring in other parts of the building regulations, including energy efficiency and controls[5]. If the job includes a boiler change, treat it as one project with one set of paperwork rather than two separate notifications.
Example: replacing a vented cylinder in a 1930s semi
Example (fictional): a household wants mains-pressure showers and asks for its copper vented cylinder and loft tanks to be replaced. At survey the engineer measures the incoming supply in the evening and finds it meets the chosen cylinder's minimums. The airing cupboard is on an internal wall, so the engineer plans D2 along the landing floor void to an external wall, keeping the 300mm vertical drop below the tundish and a steady fall.
The customer also wants a large freestanding bath. The engineer checks its capacity, finds it is over 230 litres, and notifies the water company before work starts. The quote lists the cylinder package, the discharge route, the loft tank removal and making good, the notification and the certificate, so the customer understands why it costs more than a straight swap.
Paperwork to leave behind
| Document | Who gets it | When |
|---|---|---|
| Building regulations compliance certificate (via your scheme) or building control completion | Homeowner | After you notify the scheme |
| Manufacturer's commissioning checklist and installation instructions | Homeowner, copy on your file | At handover |
| Completed warning label on the unit | Stays on the cylinder | Before you leave |
| Water undertaker consent, where a notifiable fitting was added | Your file, copy to homeowner | Before work starts |
| First service date and what it covers | Homeowner | At handover |
Every service you provide is treated as including a term that you perform it with reasonable care and skill[6]. A complete paperwork pack is how you show that later, if a valve discharges, a ceiling gets wet or a buyer's surveyor asks who fitted the cylinder.
Common faults inspectors find
- Tundish hidden in a cupboard or loft where nobody would see a discharge.
- D2 with a bend straight off the tundish, or a flat or back-falling run.
- D2 in plastic that has not been shown to withstand the discharge temperature and is not permanently marked; Approved Document G expects metal or a proven, marked material[2].
- Warning label missing, blank or painted over.
- Expansion vessel and valves fitted but never set or checked against the data plate.
Each of these is cheap to avoid at installation and expensive to fix afterwards, especially once floors are down and decorated. Build the checks into your commissioning sheet so they are ticked on every job, not remembered on most.
Frequently asked questions
Do I need a G3 card to fit an unvented cylinder?
Approved Document G says skills can be shown by competent person scheme registration for this work or by a current registered operative skills card for unvented systems. Most installers hold the card and the scheme registration.
Do I have to tell building control?
Yes, unless you are registered with a competent person scheme for unvented hot water. Registered installers self-certify and the owner receives a compliance certificate.
How far can the tundish be from the valve?
No more than 600mm of pipe between the valve outlet and the tundish, with the tundish vertical, lower than the valve and in the same space as the cylinder.
Does an unvented cylinder need water company notification?
It is not on the notification list itself, but a bath over 230 litres or a booster pump drawing more than 12 litres per minute is, so check what else the job includes.
References
legislation.gov.uk (The National Archives) (2010). The Building Regulations 2010, Schedule 1 (requirement G3: hot water supply and systems) (opens in a new tab) ↑
GOV.UK (Ministry of Housing, Communities and Local Government) (2024). Approved Document G: Sanitation, hot water safety and water efficiency (2015 edition, with 2024 amendments) (opens in a new tab) ↑
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1999). The Water Supply (Water Fittings) Regulations 1999, regulation 5 (opens in a new tab) ↑
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 49 (opens in a new tab) ↑