Boilers heating

Adding underfloor heating to your services

Should your firm add underfloor heating? Wet vs electric, Approved Document L insulation and control rules, screed timing and working with other trades.

Ava research teamPublished 7 min read

On this page
  1. Why underfloor heating is worth adding
  2. Wet or electric: choosing what to offer
  3. Controls the regulations expect
  4. Insulation beneath the pipes
  5. Screed timing and the programme
  6. Working with builders and other trades
  7. Example: a kitchen extension
  8. Survey questions that protect your price
  9. Commissioning and handover
  10. Is it right for your firm?
  11. Frequently asked questions
  12. References

Key takeaways

  • Wet underfloor heating suits the low flow temperatures that heat pumps and the 55°C design guidance push towards[1].
  • Approved Document L sets UFH controls and the insulation needed beneath the pipes, including at least 1.25 m²K/W over unheated rooms or for intermittent use[1].
  • Most callbacks come from the programme, not the pipe: screed, floor finishes and commissioning need agreeing with other trades in writing.
  • Subcontract UFH work for builders usually falls under the Construction Industry Scheme[2].

Why underfloor heating is worth adding

Underfloor heating used to be a premium extra in new builds. It is now a regular request in kitchen extensions, loft conversions and whole-house renovations, and it fits where heating is heading. Almost 100,000 hydronic heat pumps were sold in the UK in 2024, a 63% rise in a year[3], and heat pumps run best at low flow temperatures. Approved Document L already asks for new and fully replaced wet systems to be sized to run at a maximum flow temperature of 55°C or lower[1]. A large warm floor meets the heat need of a room at a lower water temperature than most radiators, which makes it a natural partner for a heat pump or a well-set condensing boiler.

For a plumbing and heating firm, the attraction is a job that is planned weeks ahead, priced per project rather than per hour, and usually sold alongside a new heat source. The catch is that UFH is as much about floors and programmes as it is about pipes, and that is where firms new to it lose money.

Wet or electric: choosing what to offer

Wet and electric underfloor heating compared, with control requirements from Approved Document L[1]
FactorWet (water-based)Electric
Heat sourceBoiler or heat pump via a manifoldMains electricity through mats or cables
Best useWhole floors, extensions, heat pump systemsSmall rooms such as bathrooms, or one-off rooms off the main circuit
Floor build-upDeeper, often in screed or on boards with spreader platesThin, often under tiles
Controls rule (England)Controls to adjust operating temperatureRoom thermostat with manual override
Who does the workYour heating engineersA qualified electrician for the electrical connection

Most heating firms start with wet systems because they use skills the team already has: pipework, pumps, mixing, balancing and controls. Electric mats can still be worth offering for bathrooms, but the electrical side needs a qualified electrician, so decide whether you subcontract it or refer it.

Controls the regulations expect

In England, Approved Document L sets specific rules for new underfloor heating, on top of the general heating system guidance. Every system needs controls to adjust its operating temperature; room thermostats on electric systems need a manual override; and heating for screed floors thicker than 65mm should automatically reduce room temperature at night or when the room is unoccupied[1]. Installing or replacing a heating system can be building work that needs approval[4], though using a competent person scheme installer means the homeowner does not need to arrange approval separately[5].

Insulation beneath the pipes

Heat that goes down into the slab or the room below is heat the customer pays for and does not feel. Approved Document L says ground floors and floors exposed to outside should be insulated so floor heat loss is no more than 10 W/m²[1]. UFH used intermittently or installed over unheated rooms should be separated from the structural floor by insulation of at least 1.25 m²K/W[1]. Over intermediate floors, BS EN 1264-4 levels apply: at least 0.75 m²K/W for wet systems and 0.5 m²K/W for electric[1].

Minimum insulation beneath underfloor heatingApproved Document L (England), paragraphs 6.30 and 6.31
Minimum insulation beneath underfloor heatingBar chart. Over unheated rooms or intermittent use: 1.25 m²K/W; Wet UFH over an intermediate floor: 0.75 m²K/W; Electric UFH over an intermediate floor: 0.5 m²K/W.Over unheated rooms or intermittent useOver unheated rooms or intermittent use: 1.25 m²K/W1.25 m²K/WWet UFH over an intermediate floorWet UFH over an intermediate floor: 0.75 m²K/W0.75 m²K/WElectric UFH over an intermediate floorElectric UFH over an intermediate floor: 0.5 m²K/W0.5 m²K/WMinimum insulation beneath underfloor heatingBar chart. Over unheated rooms or intermittent use: 1.25 m²K/W; Wet UFH over an intermediate floor: 0.75 m²K/W; Electric UFH over an intermediate floor: 0.5 m²K/W.Over unheated rooms or intermittent useOver unheated rooms or intermittent use: 1.25 m²K/W1.25 m²K/WWet UFH over an intermediate floorWet UFH over an intermediate floor: 0.75 m²K/W0.75 m²K/WElectric UFH over an intermediate floorElectric UFH over an intermediate floor: 0.5 m²K/W0.5 m²K/W

Source: GOV.UK (Ministry of Housing, Communities and Local Government), 2023[1]

Show the data
ItemValue
Over unheated rooms or intermittent use1.25 m²K/W
Wet UFH over an intermediate floor0.75 m²K/W
Electric UFH over an intermediate floor0.5 m²K/W

Agree who supplies and fits the insulation before you price. On many extensions the builder lays it, and your design depends on them using the right thickness and product. Write the required value on your drawings and ask to see it before your pipe goes down.

Screed timing and the programme

Screed is where UFH projects slip. The pipework is pressure tested before the screed goes down and kept under pressure during the pour, so a damaged pipe shows up immediately. After that the screed has to cure and dry to its manufacturer's schedule before the system is brought up to temperature gradually, and floor finishes have to wait again. Every one of those steps belongs to a different trade.

  • Agree the sequence in writing: insulation, edge strip, pipe, pressure test, screed, curing, controlled heat-up, finishes.
  • Use the screed manufacturer's curing and heat-up schedule, not a rule of thumb, and give a copy to the builder and the customer.
  • Do not use the UFH to force-dry screed unless the screed manufacturer's instructions allow it.
  • Record the pressure test before and during the pour with photos and the gauge reading.
  • Ask the customer what floor finish they plan, because thick carpet and underlay reduce output.

Working with builders and other trades

When you work for a builder rather than the homeowner, you are usually a subcontractor. The Construction Industry Scheme covers installing heating systems, so most plumbing and heating subcontract work falls under it[2]. Contractors deduct 20% from a registered subcontractor's payments and 30% if the subcontractor is not registered or cannot be verified[6]. Register before you start, and factor the deduction into your cash flow.

Put the interfaces into your quote: what you supply, what the builder supplies, who is responsible for protecting pipework during other works, and who signs off the heat-up. If a screeder damages a pipe, you need a record showing the system held pressure when you left it.

Example: a kitchen extension

Example (fictional): a builder asks a heating firm to quote wet UFH for a 30 m² kitchen extension feeding from a new heat pump. The firm's survey sheet asks for the floor build-up, the insulation the builder will lay, the screed type and the planned floor finish. The firm calculates the room's heat loss, designs the pipe layout and manifold, and lists the insulation value it needs under the pipe.

The quote separates the firm's scope from the builder's, states that the screed manufacturer's heat-up schedule will be followed, and includes a return visit to commission after the screed has dried. Because the customer chose a stone floor rather than carpet, the design flow temperature stays low, which suits the heat pump.

Survey questions that protect your price

Underfloor heating quotes go wrong when the survey misses something that only appears once the floor is open. Build a survey sheet that forces the questions, and do not issue a fixed price until each one has an answer. Where the customer or builder cannot answer yet, price the uncertain items as provisional and say so.

  • What is the floor construction now, and what will it be after the works: solid, suspended timber or a new slab?
  • Who lays the insulation and edge strip, and what product and thickness?
  • Which screed type, and whose curing and heat-up schedule applies?
  • What floor finish is planned in each zone, including rugs and thick carpet?
  • Where will the manifold go, and is there space for it with access for maintenance?
  • What is the heat source, and does it need a mixing unit or separate pump?
  • Which rooms are zones, and where will each thermostat sit?
  • When will the floor be ready for you, and who confirms that date?

The answers also tell you how much programme risk you are taking on. A clear sequence agreed with a builder you trust is a different job from an extension where nobody has decided the floor finish. Price the second one accordingly, or decline it.

Commissioning and handover

Approved Document L says all equipment in UFH systems should be commissioned to BS EN 1264-4[1]. In practice that means filling and purging each loop, balancing the flow rates at the manifold, setting the mixing or flow temperature, checking each zone's controls switch the right loops, and recording it all. Give the customer the loop schedule and a marked drawing, because the next trade to lift a floor will need it.

Explain how UFH behaves. It warms a room slowly and is best left to run steadily, with modest setbacks rather than being switched off and on like radiators. Customers who expect instant heat sometimes report a fault that is just the system working as designed, and five minutes at handover avoids that call.

Is it right for your firm?

Underfloor heating suits firms that already handle system design, have steady relationships with builders and can plan work weeks ahead. It suits firms less if most of their work is reactive breakdowns, because the programme risk sits with you. Start with projects where you also supply the heat source, so the design is yours from the boiler or heat pump to the floor, and add stand-alone UFH work once your survey sheet, quote template and commissioning record are proven.

Frequently asked questions

Does underfloor heating need building regulations approval?

Installing or replacing a heating system can be notifiable work. Using a competent person scheme installer means the homeowner does not need separate approval.

How much insulation goes under underfloor heating?

In England, at least 1.25 m²K/W for intermittent use or over unheated rooms, and BS EN 1264-4 levels over intermediate floors: 0.75 for wet systems and 0.5 for electric.

Can underfloor heating dry the screed?

Only if the screed manufacturer's instructions allow it. Follow their curing and heat-up schedule.

Is UFH a good match for heat pumps?

Usually yes, because a large heated floor can meet a room's needs at a low flow temperature, which suits heat pump efficiency.

References

  1. GOV.UK (Ministry of Housing, Communities and Local Government) (2023). Approved Document L, Volume 1: Dwellings (2021 edition incorporating 2023 amendments) (opens in a new tab) ↑

  2. GOV.UK (2026). What is the Construction Industry Scheme (opens in a new tab) ↑

  3. Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑

  4. GOV.UK (2026). Building regulations approval (opens in a new tab) ↑

  5. GOV.UK (2026). Building regulations approval (opens in a new tab) ↑

  6. GOV.UK (2026). What you must do as a CIS subcontractor: get paid (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo