Key takeaways
- Describe the work as an output with a standard and a price, not as hours under your direction; that protects quality and status.
- Most plumbing and heating subcontract work falls under CIS, so the agreement should say who verifies, what is deducted and when statements are issued[1][2].
- Your customer's contract is with you, and you owe them reasonable care and skill whoever does the work[3].
- Set payment terms you will keep. Late payment is now a major obstacle for 45% of construction SME employers[4].
- A narrow non-solicitation clause for customers met through your work is reasonable; a blanket ban on working in your area is not.
Why a written agreement matters
Plenty of plumbing firms still run subcontractors on a phone call and a day rate. That works until a boiler leaks a month after install, a subbie is injured on a job, or a customer rings the subbie directly for their next bathroom. A written agreement settles those questions before they arise. It also shows how the relationship really works, which matters if anyone later asks whether the subcontractor was actually a worker or an employee.
Keep it short enough that both sides read it. A main agreement of three or four pages, plus a job sheet for each piece of work, is enough for most domestic and light commercial firms.
The clauses, in order
Parties and status
Name both businesses. State that the subcontractor is in business on their own account, controls how the work is done and may send a suitably qualified substitute with your agreement. Only include this if it is true.
Scope and specification
Each job sheet says what is to be done, to which standard, by when and for what price. Attach drawings, the survey or the customer quote.
Standards and compliance
Work must meet Building Regulations, water fittings rules and manufacturers' instructions. Gas work is done only by people in the approved class, which in practice means Gas Safe registration for the right categories[5].
Materials and equipment
Say who supplies what. If you supply the boiler and the subbie supplies fittings, list it. The subcontractor provides their own tools and test equipment.
Site conduct
Arrival times, protection of the property, parking, waste removal, smoking and how to speak to customers. This is output standard, not daily control.
Price and payment
Fixed price or day rate, how invoices are submitted, payment terms and CIS deductions.
Variations
No extra work without written approval from you, even if the customer asks on site.
Defects and callbacks
The subcontractor returns to fix defects in their work at their own cost within an agreed period.
Insurance
Public liability at a stated minimum, and employers' liability if they employ anyone. Certificates provided before the first job and on renewal.
Health and safety
They follow your site risk assessments, provide their own PPE if genuinely self-employed, and report accidents and near misses.
Customers and data
Non-solicitation of your customers, no use of customer data except for the job, and secure handling of any personal data.
Termination and disputes
Notice to end the agreement, immediate termination for serious breaches, and how disputes are resolved, including the statutory right to adjudication under the Construction Act where it applies.
Payment terms and CIS
The Construction Industry Scheme covers installing systems for heating, lighting, power, water and ventilation, so most plumbing and heating subcontract work falls under it[1]. Under CIS, contractors deduct 20% from a registered subcontractor's payments and 30% if the subcontractor is not registered or cannot be verified[2]. The agreement should say that you will verify the subcontractor before the first payment, deduct at the verified rate, and send a monthly deduction statement.
45%
Construction SME employers naming late payment as a major obstacle in 2025, up from 36%[4]
Source: Department for Business and Trade (GOV.UK), 2025[4]
Show the data
| Item | Value |
|---|---|
| 2024 | 36% |
| 2025 | 45% |
Late payment is the commonest reason good subcontractors stop answering the phone. Across all sectors, late payment was a problem for 63% of SME employers that gave trade credit in 2025[6], and construction was hit hardest. Agree terms you can keep, such as payment within 14 days of a valid invoice, and pay on the day. Both sides should also know the default rule: businesses can charge statutory interest of 8% plus the Bank of England base rate on late business-to-business payments[7].
Sample clause: 'The Contractor will pay each valid invoice within 14 days of receipt, less any deduction required under the Construction Industry Scheme. The Contractor will verify the Subcontractor with HMRC before the first payment and will provide a monthly statement of deductions.'
Defects, warranties and your customer
Your customer contracted with you, so you are the one who must perform the service with reasonable care and skill[3]. If the subbie's work is poor, the customer comes back to you. The agreement should pass that responsibility back down: the subcontractor fixes defects in their workmanship at their own cost, attends within a set time for leaks and loss of heating, and completes the paperwork you need for manufacturer warranties and Building Regulations notification.
- Defects period: a fixed period for workmanship on installs, for example 12 months.
- Response times: same or next working day for leaks and no heating; within a week for cosmetic issues.
- Paperwork: commissioning records, photos and certificates uploaded before invoicing.
- Right to remedy: if the subcontractor does not attend, you may fix it and deduct the reasonable cost.
Insurance and safety on shared jobs
Ask for the subcontractor's public liability certificate before the first job, check the limit matches what your own insurer and your commercial clients require, and diary the renewal date. If the subcontractor employs anyone, even an apprentice, they need employers' liability cover too. Check that the activities listed on the policy include the work you are giving them: a policy written for bathroom fitting may not cover gas or unvented cylinder work.
On site, the agreement should require the subcontractor to follow your risk assessments and method statements, attend any site induction, report accidents and near misses to you the same day and stop work if conditions are unsafe. If you run the job, you remain responsible for coordinating safety between trades, so make sure everyone knows who that person is on each site.
Non-solicitation without overreach
You want to stop a subcontractor taking customers they met through your work. You cannot stop a self-employed engineer working in your town for the rest of their career. Courts look at restrictions in commercial agreements for reasonableness, so keep the clause narrow: customers the subcontractor worked for through you, for a limited period such as twelve months, and only for the kind of work you do. Add a rule that customer contact details are used only for the job and deleted or returned afterwards.
Sample clause: 'For 12 months after the end of this agreement, the Subcontractor will not, on their own account, seek or accept work from any customer of the Contractor for whom the Subcontractor carried out work under this agreement in the previous 12 months.'
Example: a job sheet for a boiler swap
Example (fictional): a firm in Swindon issues this job sheet under its standard agreement. Job: replace a combi boiler at a semi-detached house, on the same flue route. Supplied by contractor: boiler, flue kit, filter and controls. Supplied by subcontractor: fittings, consumables, tools, analyser. Standard: manufacturer's instructions, Building Regulations notification through the contractor's scheme, power-flush to the firm's written standard. Price: fixed, paid within 14 days less CIS at 20%. Paperwork: commissioning record, photos and gas safety readings uploaded before the invoice. Defects: 12 months on workmanship. The subbie decides the order of work and the start time within the agreed day.
Managing the agreement after it is signed
An agreement only helps if it is used. Issue a job sheet for every job, even small ones, and keep it with the invoice. Review each subcontractor twice a year on quality, callbacks, paperwork and punctuality, and tell them the result. Good subbies like knowing where they stand, and the review gives you a record if you later need to end the arrangement.
Before you sign
- Does the agreement describe what really happens, especially on control and substitution?
- Have you seen the subcontractor's Gas Safe card, categories and insurance certificate?
- Is the CIS status verified and recorded?
- Are payment terms ones you will genuinely meet?
- Is the non-solicitation clause limited in time, customers and type of work?
- Do both sides have a signed copy, and is there a job sheet for each piece of work?
Frequently asked questions
Do I need a written agreement with every subcontractor?
It is not always a legal requirement, but a written agreement is the best evidence of what was agreed on price, standards, defects and status.
Who is responsible to the customer for a subcontractor's work?
You are, if the customer contracted with you. Your agreement should require the subcontractor to put right defects in their own work.
Can I stop a subcontractor working for my customers?
A narrow, time-limited non-solicitation clause covering customers they met through you is more likely to be enforceable than a wide ban.
References
GOV.UK (2026). What is the Construction Industry Scheme (opens in a new tab) ↑
GOV.UK (2026). What you must do as a CIS subcontractor: get paid (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 49 (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
GOV.UK (2026). Late commercial payments: charging interest (opens in a new tab) ↑