Key takeaways
- Employers and people in control of premises must assess and manage legionella risk; contractors support them but rarely hold the duty[1].
- HSE guidance: store hot water at 60°C or above, reach at least 50°C at outlets within a minute and keep cold water below 20°C[2].
- Sentinel outlet temperatures are checked monthly and recorded; little-used outlets are flushed weekly[2][3].
- A clean, complete logbook is the evidence of control, and it is often the contractor who keeps it up to date.
- Risk assessment and water sampling need specific competence; know when to bring in a specialist.
Why legionella is a plumbing contractor's business
Legionella bacteria multiply in water that is lukewarm rather than properly hot or cold, especially where water sits still, and people can become ill by breathing in fine droplets from showers, taps and spray. Hot and cold water systems in offices, hotels, gyms, schools and care homes are exactly where that risk lives. The pipework, cylinders, tanks and mixing valves you install and maintain are the controls that keep it in check.
For a plumbing and heating firm, legionella control is both a responsibility and an opportunity. Get it wrong on an installation, by leaving a dead leg or setting a cylinder too low, and you create risk for the building's occupants. Get it right, and you can offer monthly monitoring visits that bring steady work and a reason to be on site when other faults appear.
Commercial buildings are different from most homes. In England, 63% of homes had a condensing-combination boiler in 2024[4], which heats water on demand with little or no storage. Offices, hotels and care homes usually store hot water in calorifiers or cylinders and often have cold water tanks, which is where the control regime matters most.
Who holds the legal duty
HSE is clear that employers and those in control of premises must assess and manage sources of risk[1]. In practice that means the building owner, the employer or the landlord, depending on who controls the water system. They are often called the duty holder. Their main tools are a written risk assessment, a written scheme of control and a named responsible person who makes sure the scheme is carried out. The detail sits in HSE's Approved Code of Practice L8 and the technical guidance HSG274.
- Duty holder: the employer or person in control of the premises. Holds the legal responsibility.
- Responsible person: appointed by the duty holder to manage the scheme day to day. Often a facilities or site manager.
- Contractor: carries out tasks under the scheme, such as temperature checks, flushing, descaling, servicing mixing valves and repairs. Responsible for doing those tasks properly and recording them.
- Specialist: carries out risk assessments, sampling and complex remedial work where the duty holder needs that competence.
Put the split of responsibilities in writing. A contract that says you will maintain the water system without listing tasks invites the assumption that you are responsible for everything.
The temperatures that control the risk
HSE guidance for hot and cold water systems says hot water should be stored at 60°C at least, outgoing water from a calorifier should be at least 60°C, and water at outlets should reach at least 50°C within one minute of running. Incoming and stored cold water should stay below 20°C, and after running sentinel taps for two minutes the cold temperature should be below 20°C[2].
Source: Health and Safety Executive, 2026[2]
Show the data
| Item | Value |
|---|---|
| Stored hot water, at least | 60 degrees C |
| Hot at outlet within 1 minute, at least | 50 degrees C |
| Cold water, below | 20 degrees C |
In care settings the same storage and distribution temperatures apply, with extra attention because residents are more likely to be at higher risk of infection[3]. Where hot water is held hot enough to control legionella, scald protection matters too; see plumbing in schools and care homes for mixing valves and outlet limits.
Monthly and periodic checks
| Task | Frequency in HSE guidance | What to record |
|---|---|---|
| Hot water temperature at sentinel outlets | Monthly | Temperature reached within one minute, outlet ID, date, initials |
| Cold water temperature at sentinel outlets | Monthly | Temperature after two minutes of running |
| Hot water supply to mixing valves | Monthly | Supply temperature reached within one minute |
| Cold water at ball valve outlet of tanks | Every 6 months | Temperature and tank condition |
| Tank inspection for cleanliness | At least annually | Condition, debris, lid and insulation, photos |
| Showerhead and hose cleaning and descaling | Quarterly or as the risk assessment decides | Outlets cleaned, condition |
| Flushing of infrequently used outlets | Weekly | Outlets flushed and duration |
These frequencies come from HSE's guidance on things to consider in hot and cold water systems[2]. The site's own risk assessment may add tasks or change frequencies, so always work from the written scheme of control rather than a generic list. Weekly flushing is often done by site staff rather than a contractor, but someone has to record it[3].
What a good logbook contains
- The current risk assessment and its review date.
- The written scheme of control, listing every task, its frequency and who does it.
- A schematic of the water system, with sentinel outlets and tanks marked.
- Monthly temperature records, signed and dated, with any readings outside limits highlighted.
- Records of flushing, descaling, tank inspections and any cleaning or disinfection.
- Remedial actions: what was found, what was recommended, who approved it and when it was completed.
- Training records for the people carrying out tasks.
An out-of-range reading with no follow-up is worse than no reading at all, because it shows the risk was known and not dealt with. When a temperature fails, record the reading, the likely cause and the action taken, and tell the responsible person the same day.
Who counts as competent
There is no single licence for legionella work, but duty holders must use people with the skills, knowledge and experience for the tasks they do. For routine monitoring, that means training in legionella control and water hygiene, an understanding of the building's system and the discipline to follow the scheme. For risk assessments and sampling, buyers expect specialist training and experience, and HSE notes that samples should be analysed by an accredited competent company[2].
Be honest about where your competence ends. A general plumbing firm can deliver excellent monthly monitoring and remedial plumbing while partnering with a specialist for risk assessments and sampling. Many duty holders prefer that arrangement, because it keeps the assessment independent of the firm doing the work.
When a buyer asks about competence in a tender or onboarding form, answer with specifics: the training each person holds and when it was completed, how long they have carried out monitoring, the types of building they have worked in and how their records are checked. Attach a sample completed logbook page with the client's details removed. That evidence carries far more weight than a statement that your engineers are fully qualified.
Installation choices that reduce risk
- Remove dead legs and redundant pipework when you alter a system, rather than capping them off.
- Size cylinders and tanks to real demand so water turns over rather than sitting.
- Insulate cold pipes away from heat sources and hot pipes to hold temperature.
- Fit mixing valves as close to the outlet as practical where scald control is needed.
- Provide drain and sampling points that make monitoring easy.
- Check whether the work needs notifying to the water company before you start.
On that last point, anyone planning to install certain water fittings must notify the water undertaker and must not begin without its consent[5]. Larger commercial alterations often fall into that category.
Example: a monthly visit to a small hotel
Example: a heating firm carries out monthly checks for a 30-room hotel. The engineer runs the sentinel outlets nearest and furthest from the calorifier, records hot water reaching 52°C and 51°C within a minute and cold water at 18°C and 19°C after two minutes. One mid-corridor bathroom, recently used less because of a refurbishment, reaches only 46°C. The engineer records the reading, flushes the outlet, finds a sticking mixing valve upstream, quotes for a replacement and tells the hotel's maintenance manager before leaving. The logbook entry shows the reading, the cause, the action and the quote reference.
Turning legionella control into a service
Train two people properly
Make sure at least two members of the team are trained in legionella control so monthly visits do not stop when one is away.
Offer monitoring as part of PPM
Bundle monthly temperature checks with boiler and water heater servicing in a planned maintenance contract.
Partner for assessments
Agree a referral arrangement with a specialist for risk assessments and sampling.
Standardise the record
Use a digital or printed record that matches the site's scheme and is completed before the engineer leaves.
Legionella monitoring fits naturally into planned work; see selling planned preventative maintenance and agreeing response times in maintenance contracts. For pricing, see pricing commercial plumbing work.
Agree in the contract what happens when a monitoring visit finds a problem: whether you may carry out minor remedial work up to an agreed value straight away, or must quote first. Fast, recorded follow-up is what the duty holder is really buying.
Frequently asked questions
Is the plumbing contractor the legionella duty holder?
Usually not. The duty sits with the employer or person in control of the premises. Contractors carry out tasks under the scheme of control and are responsible for doing those tasks properly and recording them.
How often should sentinel outlets be checked?
HSE guidance calls for monthly temperature checks at sentinel outlets on hot and cold systems, with results recorded.
Can a plumber carry out a legionella risk assessment?
Only with the right training, knowledge and experience. Many general plumbing firms partner with a specialist for assessments and sampling while providing monitoring and remedial work themselves.
What should happen when a temperature reading fails?
Record it, investigate the cause, take or recommend action, and tell the responsible person the same day. Note the follow-up in the logbook.
References
Health and Safety Executive (2026). Legionnaires' disease (opens in a new tab) ↑
Health and Safety Executive (2026). Legionnaires' disease: hot and cold water systems, things to consider (opens in a new tab) ↑
Health and Safety Executive (2026). Legionella and health and social care premises (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1999). The Water Supply (Water Fittings) Regulations 1999, regulation 5 (opens in a new tab) ↑