Key takeaways
- Build every price from five parts: loaded labour, materials, job-specific costs, an overhead share and profit.
- An engineer's hourly wage is only the start: employer National Insurance is 15% above £5,000 a year[1], pensions add at least 3%[2] and 5.6 weeks' paid holiday cuts available hours[3].
- Price materials at today's merchant price; repair and maintenance material prices were up 6.2% in the year to September 2026[4].
- Decide your profit figure before you price, not after you see what is left.
- Agree the price or the basis for it before work starts; without one, the customer only has to pay a reasonable price[5].
Why every job needs a build-up
Many plumbers price by feel: a figure that seemed right last time, adjusted for how the customer sounds on the phone. That works until costs move. Wages, van running costs and material prices have all risen in recent years, and a price that made money two years ago can now lose it without anyone noticing. A build-up, even a rough one, shows you where each pound of the price goes and stops you working for nothing.
The method below is cost-plus: work out what the job costs you, then add profit. It is not the only way to set prices, and you may end up quoting a fixed figure or an hourly rate rather than showing the build-up to the customer. But you should know the build-up behind every price you give.
The five parts of a job price
- Labour: the hours the job takes, including travel and collecting parts, at the loaded cost of the person doing it.
- Materials: everything that goes into the job, at the price you will actually pay this week.
- Job-specific costs: parking, waste disposal, equipment hire, access equipment, permits.
- Overheads: a share of the costs of running the business that no single job pays for directly.
- Profit: what the business earns for taking the risk, funding growth and getting through quiet months.
The first three are the direct cost of the job. Overheads and profit are where most small firms under-price, because they are easy to forget when quoting at the kitchen table.
Part 1: the real cost of an hour of labour
Start with pay. The median gross hourly pay of employee plumbers and heating and ventilating installers in the UK was £18.82 in 2026, and £19.00 for those working full time[6]. If you are a sole trader, use the hourly figure you need to draw to live on; if you employ engineers, use what you pay them.
Source: Office for National Statistics, 2026[6]
Show the data
| Item | Value |
|---|---|
| Employee plumbers and heating installers | £18.82 |
| Full-time employee plumbers and heating installers | £19 |
| All employees | £19 |
| All full-time employees | £20.88 |
Then add the costs that come with employing someone. Employers pay 15% secondary Class 1 National Insurance on earnings above £5,000 a year in 2026 to 2027[1], though an eligible employer can reduce the annual bill with the Employment Allowance[1]. Under auto-enrolment, the employer must pay at least 3% into a workplace pension[2]. Almost all workers are entitled to 5.6 weeks' paid holiday a year[3], so you pay for hours in which no customer is billed. Any labourer or apprentice must be paid at least the legal minimum, which for workers aged 21 and over is £12.71 an hour from April 2026[7].
Example: an engineer paid £19.00 an hour for 40 hours a week costs £39,520 in wages over a year. Employer National Insurance on earnings above £5,000 at 15% adds about £5,180, and a 3% pension roughly another £1,000, for a total of about £45,700. Take away 5.6 weeks of holiday and the engineer is available for about 1,856 hours. If three-quarters of those hours are billable, that is about 1,390 hours, so each billable hour costs about £33 before the van or any other overhead.
The billable share matters as much as the wage. Time spent collecting parts, waiting for access, filling in paperwork and driving between jobs is paid but not billed unless you build it into the price. Measure it for a month rather than guessing; most firms are surprised by how much of the day it takes.
Part 2: materials at today's price
Use the price you will pay at the merchant this week, not a figure from last year's price list. Material prices have kept moving: the government's construction material price index for repair and maintenance work rose 6.2% in the year to September 2026, and the index for all work rose 7.2%[4]. Some plumbing lines moved much faster; rigid pipes and fittings were among the biggest risers, up 16.9% over the same twelve months[4].
List every item, including the small ones that add up: fittings, solder, flux, PTFE tape, inhibitor, cleaner, sealant, clips and fixings. Then decide how you will charge for them. Whether you add a markup and how you present it is covered in marking up materials: markup vs margin.
Part 3: costs that belong to this job
- Parking and congestion or clean-air zone charges for city jobs.
- Waste disposal for old boilers, cylinders, radiators and sanitaryware.
- Hire of specialist kit such as drain cameras, power flushing machines or access towers.
- A second person for heavy lifts or work at height.
- Building control or notification fees where you are not registered with a competent person scheme for that work.
- Extra travel for jobs well outside your usual area.
These are easy to forget because they are not part of every job. A short checklist on the quote form catches most of them.
Part 4: an overhead share for every hour
Overheads are the costs of being in business whether or not a job is on: the van and fuel, insurance, tools and test equipment, phone and software, accountant, training and registration fees, office wages and marketing. Add them up for a year and divide by the billable hours for the whole firm. The result is an overhead recovery rate per billable hour, which you add to every hour of labour you price.
For a sole trader this figure can easily match or exceed the hourly cost of labour itself. Working out your true labour rate walks through the calculation from target income to billable hours.
Part 5: profit, decided in advance
Profit is not whatever is left over. It pays for the van you will need to replace, the slow February, the job that goes wrong and has to be put right at your cost, and the growth you want. Most construction SME employers do make a profit: 80% reported a profit or surplus in their last financial year in the 2025 government survey[8]. The ones that do tend to set a profit figure first and price to reach it.
Pick a percentage to add on top of cost and apply it consistently. You can vary it by job type, for example higher on small, high-risk jobs and lower on large, predictable installs, but write down the rule so everyone in the office prices the same way.
A worked build-up
| Line | Basis | Amount |
|---|---|---|
| Labour | 3.5 hours including collecting the radiator, at £33 loaded cost | £115.50 |
| Materials | Radiator, two valves, inhibitor, fittings at this week's merchant price | £165.00 |
| Job-specific costs | Parking permit | £8.00 |
| Overheads | 3.5 hours at £18 overhead recovery | £63.00 |
| Total cost | Sum of the above | £351.50 |
| Profit | 20% on cost | £70.30 |
| Price before VAT | Rounded | £420.00 |
Example: with this build-up in front of them, the office can quote the customer a fixed £420 plus VAT for the radiator swap with confidence. If the customer asks for a discount, the owner can see exactly what it would cost: dropping to £380 halves the profit on the job. Without the build-up, that decision is a guess.
Turning the build-up into a price customers understand
Customers do not need to see your build-up. They need a clear price or a clear way of calculating it, given before work starts. Where no price is agreed, the law says the consumer must pay a reasonable price[5], which leaves you arguing about what is reasonable after the work is done. Decide whether the job suits a fixed price or an hourly rate (see hourly rate or fixed price), then put the figure, what it includes and what it excludes in writing.
Checks before the price goes out
Hours
Have you included travel, collecting parts, set-up, clean-up and paperwork, not only the time on the tools?
Materials
Are the prices from this week, and does the list include every fitting and consumable?
Job costs
Have you checked parking, waste, hire and any notification fees?
Overheads and profit
Are both added at the firm's standard rates, not reduced to win the job without a decision from the owner?
Risk
Is there anything you cannot see, such as old pipework or seized valves, that needs an allowance or a stated exclusion?
Frequently asked questions
What is the best way to price plumbing jobs?
Build each price from loaded labour, materials at current prices, job-specific costs, an overhead share and a profit figure decided in advance. Then present it to the customer as a fixed price or a clear hourly basis.
How much do employee plumbers earn per hour in the UK?
The median gross hourly pay of employee plumbers and heating and ventilating installers was £18.82 in 2026 (provisional), and £19.00 for full-time employees[6]. Employer costs and unbilled time make the cost per billable hour much higher.
Should I show customers my price build-up?
Usually not. Give a clear total or calculation basis, what it includes and excludes, and keep the build-up for your own decisions on discounts and changes.
References
GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑
GOV.UK (2026). Workplace pensions: what you, your employer and the government pay (opens in a new tab) ↑
GOV.UK (2026). Holiday entitlement (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2026). Building materials and components statistics: October 2026 (commentary) (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 51 (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC) (opens in a new tab) ↑
GOV.UK (2026). National Minimum Wage and National Living Wage rates (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑