Key takeaways
- Base your day rate on your charge-out rate and the hours you can really bill in a full day, then add day-specific costs.
- Define a day in writing: start and finish, travel, breaks, material runs, half days and overtime.
- Most plumbing and heating subcontract work falls under CIS[1]; registered subcontractors lose 20% of the labour element at source and unregistered ones 30%[2].
- Late payment is the main risk on subcontract days: 45% of construction SME employers called it a major obstacle in 2025[3].
- For domestic projects, use the day rate to build a fixed price rather than quoting days to the customer.
What a day rate is for
A day rate is a price for a full working day on one job. It suits work where you will be in the same place all day: bathroom first and second fix, boiler and cylinder installs, system replacements, commercial jobs and subcontract work for builders and main contractors. It simplifies quoting for longer jobs and cuts the unbilled travel that eats into a day of small call-outs, so a good day rate can be slightly lower per hour than your call-out pricing and still earn more.
The risk is that 'a day' means different things to you and the person paying. Set the rate from your numbers, then define exactly what it buys.
Domestic and subcontract day rates are different products
| Factor | Domestic project (homeowner) | Subcontract (builder or contractor) |
|---|---|---|
| How it is sold | Usually as a fixed price built from days | Openly as a day rate or price per job |
| Materials | You supply and mark up | Often supplied by the contractor |
| Overrun risk | Yours, if the price is fixed | Usually the contractor's, if paid by the day |
| Tax deductions | None | CIS deductions at source unless you have gross payment status |
| Payment | Deposit and stage payments | Weekly or monthly invoice, often on 30-day terms or longer |
| Paperwork | Certificates, notifications, warranty registration | Timesheets, CIS statements, site inductions, method statements |
| Biggest risk | Under-estimating days | Late or short payment |
Building the day rate
Start from your charge-out rate
Use the hourly rate that covers your income, overheads and margin over your billable hours. If you have not calculated it, start with working out your true labour rate.
Count the billable hours in a full day
A full day on one site usually means more billable hours than a day of call-outs, because there is one journey instead of five. Use what you actually achieve on site, typically a standard working day less breaks.
Multiply
Charge-out rate multiplied by billable hours in a day gives the floor. Below this, a day on site earns less than your normal work.
Add day-specific costs
Parking, congestion or clean-air charges, site travel beyond your usual area, and specialist kit you bring every day.
Check against the employment benchmark
Full-time employee plumbers had median gross weekly pay of £782.50 in April 2026[4]. A day rate that works out below an employee's daily wage, once your overheads are counted, is not sustainable.
Set a separate rate for a second person
An improver or apprentice costs less but is not free; price their day from their loaded cost, not as a discount on yours.
Define what a day includes
Most day-rate disputes are about the edges of the day. Put these points in your quote or subcontract terms:
- Start and finish times on site, and whether travel to site is within the day.
- Breaks, and whether a half-day rate applies when you are sent home early because the site is not ready.
- Time spent collecting materials the contractor or customer was meant to supply.
- Overtime, evenings and weekends: a separate rate, agreed in advance.
- Waiting time when another trade has not finished: charged at the day rate, at a reduced rate, or not at all.
- Minimum booking, such as a full day for any attendance on a new site.
- Cancellation notice: what you charge if a booked day is cancelled the evening before.
CIS: what a subcontract day really pays
The Construction Industry Scheme covers installing heating, water and ventilation systems, so most plumbing and heating subcontract work falls under it[1]. When a contractor pays you under CIS, they take deductions at the standard rate of 20% if you are registered and they can verify you, and at 30% if either does not apply[2]. With gross payment status, no deductions are taken[2].
Deductions are not taken from VAT, consumable stores, plant hired for the job, or materials you have paid for directly, and the contractor may ask for receipts as evidence of material costs[2]. Show labour and materials separately on every subcontract invoice. If you do not, the contractor may treat the whole amount as labour.
Example: a registered subcontractor invoices a week of five days at a fictional £260 a day, plus £400 of materials they bought themselves. The 20% deduction applies to the £1,300 of labour, so £260 is withheld and £1,440 is paid. If they had not registered for CIS, the 30% rate would withhold £390. The deducted amount counts towards their tax bill, but it is cash they do not have this month.
Getting paid on time
For subcontract work, the day rate matters less than whether it arrives. Late payment is a growing problem for construction firms: the share of construction SME employers naming it as a major obstacle rose from 36% in 2024 to 45% in 2025, the highest of any sector[3].
Source: Department for Business and Trade (GOV.UK), 2025[3]
Show the data
| Item | Value |
|---|---|
| 2024 | 36% |
| 2025 | 45% |
Across all sectors, late payment was a problem for 63% of SME employers that gave trade credit in 2025[3]. On business-to-business work you can charge statutory interest of 8% plus the Bank of England base rate on late payments[5]. Few small firms use it, but stating it in your terms changes how quickly invoices are paid.
- Agree payment terms in writing before the first day: weekly invoicing for subcontract work, not monthly.
- Submit timesheets signed off by the site manager each Friday, so the hours cannot be disputed later.
- Ask for a contact in accounts as well as the site manager.
- Stop work, politely and in writing, when an agreed payment is overdue by more than your terms allow.
Questions to ask before accepting subcontract days
A busy builder offering two weeks of steady days can look like an easy decision in a quiet month. Ask these questions first, and get the answers in writing:
- Who supplies materials, and who collects them? If it is you, how and when are they paid for?
- Are you paid by the day, by the job or on measured work, and what happens when the job is not ready for you?
- What are the payment terms, and who signs off your timesheets?
- Will they verify you under CIS before the first payment, so you are not taxed at the higher rate by mistake?
- Who is responsible for notifying the work and issuing certificates, and are you expected to sign off work you did not do?
- What is the cancellation notice if the programme slips, and is a lost day paid?
A contractor who will not answer these clearly is telling you how the job will go.
Day rates on domestic projects
Homeowners rarely want an open day rate. They want to know what the bathroom or the new heating system will cost. Use your day rate internally to build a fixed price: estimate the days for each stage, multiply by the day rate, add materials, job costs and an allowance for the unknowns, and present the total with a clear scope. Keep a record of how many days each job type really takes; your estimates get better with every job.
Stage payments protect your cash flow on longer domestic jobs: a deposit to order materials, a payment at first fix, and the balance on completion. Agree them before you start, in writing. For how fixed and time-based prices compare, see hourly rate or fixed price.
Overruns and lost days
Lost days are the hidden cost of day-rate work. A day booked for second fix that turns out to be a morning because the tiler has not finished is a day you could have filled elsewhere. Protect yourself in the terms:
- A half-day minimum when you attend and cannot work through no fault of yours.
- Notice periods for cancellation, with a charge for late cancellation.
- A rule that extra days caused by changes to the specification are charged at the day rate, agreed in writing before they are worked.
- A daily site diary, even a photo and two lines on your phone, recording what was done and what held you up.
Example: pricing a bathroom with a day rate
Example: a fictional heating and bathroom firm in Brighton prices a bathroom refit. From past jobs it allows one day for strip-out and first fix, half a day after plastering for boxing and preparation, and one and a half days for second fix and commissioning: three days at its day rate. It adds the sanitaryware, valves, pipework and consumables at current merchant prices, a skip and parking, and an allowance of half a day for surprises behind the old bath. The customer sees one fixed price with a written scope and three stage payments; the firm sees exactly how many days it has sold.
Frequently asked questions
How do I work out a day rate as a plumber?
Multiply your charge-out rate by the hours you can bill in a full day on one site, add any day-specific costs such as parking, and check the result against what an employed plumber earns per day once your overheads are included.
Is subcontract plumbing work covered by CIS?
Usually. CIS covers installing heating, water and ventilation systems[1]. Registered subcontractors have 20% deducted from the labour part of each payment, and unregistered ones 30%[2].
Can I charge interest if a contractor pays late?
On business-to-business work you can charge statutory interest of 8% plus the Bank of England base rate on late payments[5]. Put it in your terms so it is expected.
References
GOV.UK (2026). What is the Construction Industry Scheme (opens in a new tab) ↑
GOV.UK (2026). What you must do as a CIS subcontractor: get paid (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC) (opens in a new tab) ↑
GOV.UK (2026). Late commercial payments: charging interest (opens in a new tab) ↑