Key takeaways
- A call-out fee that includes the first hour is the easiest structure for customers to understand and compare.
- A separate attendance fee plus time suits firms with long travel or many short jobs, but must be explained clearly up front.
- The headline price must not hide fees the customer will necessarily pay: the total price includes them[1].
- Winter demand is several times summer demand[2], so set and publish out-of-hours and emergency rates before the cold weather.
- For phone bookings, confirm the price basis in writing and get the customer's express request to start within the cancellation period[3].
Why the structure matters as much as the number
Customers ringing about a leak or a dead boiler usually ask one question first: 'How much is it for you to come out?' The way you answer shapes everything after it. A structure the customer understands in one sentence wins bookings and avoids arguments on the doorstep. A structure that needs three follow-up questions loses the caller to the next firm on the list, or worse, wins the job and loses the customer when the invoice arrives.
There are four common ways to charge for attending a reactive job. Each can be fair and profitable; they differ in who they suit and how easy they are to explain.
The four common structures
| Structure | How it works | Works best when | Main risk |
|---|---|---|---|
| Call-out including first hour | One fee covers attending and the first hour of work; then a rate per half hour | Most domestic repairs take around an hour; customers compare firms by headline price | Short jobs feel expensive to the customer |
| Separate attendance fee plus time | A fee for attending, then time charged from arrival | Long travel distances; many very short jobs | Customers add the two figures differently, or not at all |
| Fixed diagnosis fee | A set fee to find the fault; the repair is quoted before it is done | Boiler breakdowns and faults where the repair varies widely | Customer pays twice if they think the diagnosis should include the fix |
| No call-out, minimum charge | A higher hourly rate with a minimum, usually one hour | Firms competing on 'no call-out fee' in their area | Minimum and rate must still cover travel and set-up |
Hidden fees are a legal problem, not just a reputation one
Whichever structure you choose, the customer must be able to see the whole price. Under the Digital Markets, Competition and Consumers Act 2024, the material information in an invitation to purchase includes the total price, and the total price includes any fees, taxes or charges the consumer will necessarily incur[1]. Where the price cannot be calculated in advance, you must say how it will be calculated[1].
In practice that rules out advertising 'no call-out fee' and then adding an unavoidable attendance charge, or quoting a rate on your website that excludes VAT for domestic customers without saying so. It also means stating the minimum charge, the time units after the first period and any out-of-hours uplift wherever you state the rate.
First hour included: the case for and against
- For: one figure to remember, easy to compare with other firms, and most small repairs finish inside it.
- For: the engineer is not watching the clock in the first hour, which tends to mean a better job and a happier customer.
- For: fewer invoice queries, because most invoices simply show the call-out plus parts.
- Against: a 15-minute washer change costs the customer the same as a full hour, which some will resent unless you explain it.
- Against: you must price the first hour to cover travel and set-up as well as the work, so the figure looks high next to an hourly rate.
Separate attendance fee: the case for and against
- For: travel cost is recovered openly, which suits rural firms and wide service areas.
- For: the time rate after arrival can be lower, which looks better on longer jobs.
- Against: customers often hear only the lower of the two numbers, and are surprised by the total.
- Against: two numbers to explain on every call, and more scope for confusion between the office and the engineer.
- Against: firms with 'free call-out' competitors nearby can look more expensive at first glance even when they are not.
If you choose this model, always give the customer a worked total on the phone: 'If it takes about an hour, that's the attendance fee plus one hour, so this figure in total, plus any parts.'
Out-of-hours and emergency rates
Demand for heating repairs follows the weather. Household gas demand in the UK in January to March is several times the July to September level: in 2025 it was 111,142 GWh in the first quarter against 19,636 GWh in the third[2]. Cold snaps bring breakdowns, and breakdowns bring evening and weekend calls.
- January to March
- July to September
Source: Department for Energy Security and Net Zero, 2026[2]
Show the data
| Item | January to March | July to September |
|---|---|---|
| 2024 | 103,414 GWh | 22,138 GWh |
| 2025 | 111,142 GWh | 19,636 GWh |
Set your out-of-hours rates before winter, not during the first cold night. Most firms use the same structure as their daytime call-out with a higher figure for evenings, weekends and bank holidays, and some add a separate rate for overnight attendance. Publish the bands and times, and make sure whoever answers the phone states them before booking.
Gas smells are not a paid call-out. Tell the caller to leave the property, avoid switches and flames, and call the national gas emergency number. When told of a gas escape, the gas conveyor must attend as soon as reasonably practicable and stop the escape within 12 hours[4]. You can book a follow-up visit for the repair once the emergency service has made it safe.
Presenting the fee on the phone and in writing
A booking made by phone is a distance contract, and the customer must be given the total price inclusive of taxes or, where it cannot be calculated in advance, the way it will be calculated[5]. If you start within the 14-day cancellation period, which you will for most reactive work, you need the customer's express request to do so[3]. Both fit naturally into the booking call and a confirmation message.
- Phone script, first hour included: 'Our call-out is this figure including VAT, and that covers the first hour on site. After that it's this much per half hour, and parts are extra. The engineer will tell you the cost of any parts before fitting them. Would you like us to come out today?'
- Phone script, fixed diagnosis: 'There's a fixed fee for the engineer to find the fault. Once they know what's wrong they'll give you a price for the repair, and nothing else happens until you agree it.'
- Written confirmation: the date and window, the call-out or diagnosis fee, the rate after the first period, the out-of-hours uplift if it applies, and a line recording that the customer asked you to start straight away.
Skipping this step does not make the job free; it makes the price uncertain. Where no price has been agreed, the customer must pay a reasonable price[6], and what counts as reasonable is decided after the event, often by the customer's view of how long the engineer seemed to spend. A clear call-out structure stated at booking is far stronger ground than an argument about reasonableness on the doorstep.
Choosing your structure
- Look at your last 100 reactive jobs. If most took between 40 minutes and an hour and a half, a call-out including the first hour fits.
- If many jobs are very short and travel is long, consider a separate attendance fee, and practise explaining the total.
- If boiler breakdowns dominate and repair costs vary widely, a fixed diagnosis fee followed by a quoted repair is fairest.
- Check what local competitors advertise, then make sure your structure is at least as easy to understand as theirs.
- Whichever you choose, calculate it from your real costs; working out your true labour rate and setting a minimum charge for small jobs show how.
Mistakes that cause invoice disputes
- Quoting the hourly rate on the phone but not the minimum or the call-out, so the customer hears a smaller number than they will pay.
- Different people in the office describing the fee in different ways.
- Engineers starting extra work beyond the first hour without telling the customer the clock is running.
- Out-of-hours rates that apply from a time nobody mentioned when booking.
- Website prices that exclude VAT for domestic customers, or that are out of date.
- Parts added to the invoice without a price being given before they were fitted.
Each of these is fixed by the same habit: a short, standard explanation at booking, repeated in writing, and a rule that the engineer confirms any extra cost before incurring it.
Example: two structures on the same week
Example: a fictional firm in York compares structures on a week of 20 reactive jobs. With a call-out including the first hour, 15 jobs are invoiced at the call-out fee plus parts, and five run into extra half hours. With a separate attendance fee plus time, the totals across the week are almost identical, but 12 of the 20 invoices need a line-by-line explanation and two customers query them. The firm sticks with the first-hour-included model and adds one sentence to every booking call explaining that short jobs pay the same call-out because travel and set-up cost the same.
Frequently asked questions
Should a plumber's call-out fee include the first hour?
For most domestic repair work, yes: it gives customers one figure to remember and covers most small jobs. A separate attendance fee suits firms with long travel and many very short jobs, but needs a worked total on every call.
Can I advertise 'no call-out fee' and charge for attending?
No. The total price you show must include fees the customer will necessarily incur[1]. If attending carries a charge, say so wherever you state your prices.
Do I need the customer's permission to start an emergency job the same day?
For phone and other distance bookings, you must not start within the 14-day cancellation period unless the customer expressly asks you to[3]. Record that request at booking.
References
legislation.gov.uk (The National Archives) (2024). Digital Markets, Competition and Consumers Act 2024, section 230 (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Energy Trends: UK gas, ET 4.1 natural gas supply and consumption (quarterly), September 2026 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2013). The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, regulation 36 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1996). The Gas Safety (Management) Regulations 1996, regulation 7 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2013). The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, Schedule 2 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 51 (opens in a new tab) ↑