Key takeaways
- IGEM/UP/1B Edition 4 was published in March 2026 and became effective on 1 October 2026; Edition 3 was withdrawn on 30 September 2026.
- Permissible pressure loss is now assessed against the installation volume and the fuel gas, and pipework itself must show no perceptible loss.
- Installation volume must be calculated before every purge, and purge volume is 1.5 times installation volume.
- Where appliances cannot be isolated, or the pipework and appliances are new, no pressure loss is permitted.
- Update job sheets, software templates and briefings now; any test since 1 October 2026 should follow Edition 4.
The dates that matter
IGEM/UP/1B covers tightness testing and direct purging of small natural gas, LPG and LPG/Air installations, which is most of the domestic and small commercial work a heating engineer does. Edition 4 was published in March 2026 and supersedes Edition 3[1]. IGEM expected operatives to adopt the new procedures as soon as reasonably practicable, and in all circumstances Edition 4 became effective from 1 October 2026; Edition 3 remained available until it was withdrawn on 30 September 2026[1].
If your engineers, forms or software still follow Edition 3, any tightness test or purge carried out since 1 October 2026 was done to a withdrawn standard. Fix the procedure first, then the paperwork.
Standards are not law in themselves, but they are how competence is judged. The law requires anyone working on a gas fitting to be competent[2], and HSE's code of practice says that knowledge must be kept up to date with changes in the law, technology and safe working practice[3]. Working to a withdrawn edition is hard to defend as competent practice.
What is in scope
Edition 4 applies to sections of installation pipework, including meters, within set limits. IGE/UP/1 applies to installations with volumes above the limit, and IGEM/UP/1C covers meter installations within its own scope[1]. Edition 4 also covers caravans and leisure accommodation vehicles[1].
| Parameter | Limit in Edition 4 |
|---|---|
| Maximum operating pressure at the emergency control valve outlet (NG and LPG/Air) | Not exceeding 2 bar |
| Nominal bore of pipework | Not exceeding 35 mm (DN32, R1¼) |
| Meter badged capacity | Not exceeding 16 m3/h |
| Installation volume (individual dwelling or non-domestic premises) | Not exceeding 0.035 m3 |
| Nominal operating pressure, NG and LPG/Air | Not exceeding 21 mbar |
| Nominal operating pressure, LPG at final stage regulator outlet | Not exceeding 37 mbar |
For anything outside those limits, choose the right standard before you start. IGEM's own selection figure in the standard helps with borderline cases.
What IGEM highlights for engineers
IGEM's published FAQ on Edition 4 focuses on a few points that change day-to-day practice[4]:
- Permissible pressure loss is defined in the standard and is based on the installation volume and the fuel gas; those limits apply wherever a pressure loss has to be assessed.
- The purging procedure itself is unchanged, but the method for working out purge volume has been revised for some installations.
- For all purging, installation volume must be calculated, and purge volume is determined as 1.5 times the installation volume.
- That applies even where the tightness test itself did not need the installation volume: it still has to be calculated before purging.
- When testing the installation pipework alone, the test includes the meter, unless it is carried out from an additional emergency control valve.
Reading a pressure loss: the decision path
Look for perceptible movement
If there is perceptible movement, the engineer must investigate whether the loss is on the installation pipework or on the appliances[4].
Pipework first
A perceptible pressure loss on pipework is a failure and must be repaired or made safe. There are no permissible leakage limits when proving installation pipework gas tight[4].
Appliances connected, loss found
Where existing appliances are connected and a loss is found, isolate the appliances and confirm there is no loss on the pipework and meter[4].
Compare with the smallest limit
If the loss is below the smallest permissible limit for that gas, it can be accepted without calculating installation volume for the comparison[4].
Above the smallest limit
Calculate the installation volume and confirm the loss is within the relevant table in the standard for natural gas or LPG. If it exceeds the limit, or there is a smell of gas, the test has failed and remedial action is required[4].
Why the same leak rate gives different readings
Engineers sometimes ask why 1 mbar might be the limit on one job and 8 mbar on another. IGEM's answer is that the maximum permissible pressure loss is based on a leakage rate of 19 ml per minute for the installation volume: an 8 mbar loss on a small installation volume is roughly equivalent to a 1 mbar loss on a larger one, and both fall within the same leakage limit[4].
Source: Institution of Gas Engineers and Managers (IGEM), 2026[4]
Show the data
| Item | Value |
|---|---|
| Smaller installation volume | 8 mbar |
| Larger installation volume | 1 mbar |
That is why calculating installation volume properly matters. An engineer who guesses volume can pass an installation that should fail, or fail one that is acceptable.
When no loss is acceptable at all
IGEM's examples set out situations where no permissible pressure loss is allowed: new pipework with new appliances, and installations where existing appliances are connected because isolating them is not reasonably practicable[4]. In those cases the test must show no perceptible movement.
Make this explicit in your procedures and on your job sheet, because it is the situation where habits from older practice are most likely to creep in.
When a test fails: explaining it to the customer
A failed tightness test is unwelcome news, often delivered on a cold day when the customer expected a routine service. Clear, calm wording helps them accept that the supply has to stay off until the fault is found and fixed.
Script: 'The test shows gas is escaping somewhere in the pipework. I can't leave the supply on while that's the case, so I've turned it off at the meter and labelled it. Next I need to find the leak; most are at joints or fittings and can be repaired today or tomorrow. I'll write down what I found and what happens next.'
- Make the installation safe first, then explain. Do not debate the result with the supply on.
- Give the customer the paperwork the unsafe situations procedure requires, and keep a copy.
- If you cannot trace or make safe an escape, or it is upstream of the emergency control valve, call the gas emergency service. When told of an escape, the gas conveyor must attend as soon as reasonably practicable and stop the escape within 12 hours[5].
- Record the readings, installation volume, the limit applied and the result, so the next engineer can follow your reasoning.
Customers who understand why the gas is off are less likely to call another firm to 'just turn it back on', which is the outcome that worries engineers most.
Updating procedures and paperwork
- Buy the standard and its free amendments document from IGEM, and keep a copy where every engineer can read it.
- Update tightness test and purge forms so they record gas type, installation volume, the permissible limit used, purge volume, gauge type, readings and result.
- Update any software templates, including certificate apps, and remove old paper forms from vans.
- Brief every engineer, record attendance and test understanding with two or three worked scenarios.
- Sample-check completed tests from the last month against the new forms.
- Check commissioning paperwork too; the paper Benchmark checklist is no longer maintained and the record has moved online and to the Benchmark apps[6].
A short implementation plan
This week: stop old forms
Withdraw Edition 3 forms and templates from use and tell every engineer in writing.
This week: brief the team
Thirty minutes on scope, installation volume, purge volume and the no-loss situations.
Within a fortnight: update software
Confirm your certificate and job sheet tools have Edition 4 fields; ask suppliers for their update dates.
Within a month: audit
Review a sample of tests by each engineer since 1 October 2026 and correct any procedural gaps.
Ongoing: keep evidence
File the briefing record, the audit and any corrections, ready for an inspection.
Worked example
Example: a fictional six-engineer firm discovers in November that two engineers' certificate apps still show the old test layout. The office withdraws paper forms the same day, holds a briefing on the purge volume rule and the no-loss situations, and asks the software supplier for the update. An audit of 30 tests done since October finds four where installation volume was not recorded before a purge; the engineers revisit the records with the customers' agreement, and the firm adds a mandatory volume field to its job sheet.
For how inspectors will look at this, see preparing for a Gas Safe inspection. For the landlord paperwork that often sits alongside these tests, see landlord gas safety records, and for keeping qualifications aligned, see planning ACS reassessments.
Frequently asked questions
When did IGEM/UP/1B Edition 4 come into effect?
It was published in March 2026 and became effective from 1 October 2026. Edition 3 was withdrawn on 30 September 2026.
Do I have to calculate installation volume for every tightness test?
Not always for the test itself: if the pressure loss is below the smallest permissible limit for that gas, you can accept it without calculating volume. But installation volume must be calculated before any purge, to work out purge volume.
What is the purge volume under Edition 4?
IGEM's FAQ says purge volume is determined as 1.5 times the installation volume, for all purging.
Is any pressure loss acceptable on pipework?
No. A perceptible pressure loss on installation pipework is a failure that must be repaired or made safe. Permissible limits apply only to the whole installation with existing appliances connected, in the situations the standard describes.
References
Institution of Gas Engineers and Managers (IGEM) (2026). IGEM/UP/1B Edition 4: Tightness testing and direct purging of small LPG/Air, NG and LPG installations (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑
Health and Safety Executive (2018). Safety in the installation and use of gas systems and appliances (L56, fifth edition), paragraph 85 (opens in a new tab) ↑
Institution of Gas Engineers and Managers (IGEM) (2026). FAQ: IGEM/UP/1B Edition 4 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1996). The Gas Safety (Management) Regulations 1996, regulation 7 (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2026). Benchmark goes digital - what homeowners need to know (opens in a new tab) ↑