Key takeaways
- A quote is both a sales document and the start of a contract; write it so a stranger could tell exactly what is and is not included.
- Consumer quotes must cover the main characteristics, your identity and contact details, the total price inclusive of taxes and the payment and performance arrangements[1].
- For quotes agreed in the customer's home or remotely, add the cancellation rights and what happens if they cancel after asking you to start[2].
- Exclusions and assumptions prevent more disputes than any other section.
- Set payment terms in the quote: late payment was a problem for 63% of SME employers that gave trade credit in 2025[3].
A quote is a sales document and a contract
The quote is often the only document a customer reads closely before saying yes. It has to persuade them that you understand the job and will do it well, and it has to record exactly what you have agreed to do for the price. A one-line quote, for example 'Supply and fit new radiator, £380', does neither. A good quote is still short, usually one or two pages, but every line in it earns its place.
The template below works for most domestic plumbing and heating jobs, from a single radiator to a full system replacement. For boiler replacements, add the boiler-specific items covered in writing a boiler replacement quote customers understand.
What the law requires for consumer quotes
Before a consumer is bound by a contract, you must give them certain information. For contracts made on your premises, that includes the main characteristics of the service, your trading name, geographical address and telephone number, the total price inclusive of taxes or the way it will be calculated, the arrangements for payment and performance and the time by which you will perform the service, your complaint handling policy where applicable, and any after-sales services and guarantees[1].
Most quotes for domestic work are agreed in the customer's home or remotely by phone or email, which makes them off-premises or distance contracts. These carry extra information duties, including the conditions, time limit and procedures for cancelling, and the fact that a consumer who cancels after asking you to start must pay you reasonable costs[2]. The cancellation period ends 14 days after the contract is made[4], and you must not start within it unless the customer expressly asks you to, on a durable medium for off-premises contracts[5].
The quote, section by section
| Section | What to include |
|---|---|
| Your details | Trading name, company number if a limited company, address, phone, email, Gas Safe or other registration numbers |
| Customer and site | Name, address of the work, contact details, landlord or agent if different |
| Quote reference and date | A unique reference, date issued, name of the person who surveyed |
| Summary | One or two sentences on what the job achieves |
| Scope of work | Each task in order: remove, supply, fit, connect, test, commission, hand over |
| Materials | Key items by make and model, and any customer choices still to make |
| Exclusions | Everything a customer might assume is included but is not |
| Assumptions | Conditions the price depends on |
| Price | Total, whether VAT is included, any options priced separately |
| Payment terms | Deposit, stage payments, balance, how to pay, when invoices are due |
| Programme | Likely start date, duration, working hours, what the customer needs to do |
| Validity | How long the price stands |
| Guarantees and paperwork | Workmanship guarantee, manufacturer warranty, certificates and notifications |
| Cancellation | Rights, time limit, how to cancel, cost if cancelled after work starts on request |
| Acceptance | How to accept, and a line for the customer's request to start within the cancellation period |
Writing the scope
Write the scope as a list of tasks in the order they will happen. Use plain words a customer understands, and name locations in the house. Good scope lines look like this:
- Drain down the heating system and isolate the water supply to the bathroom.
- Remove the existing radiator in the front bedroom and dispose of it.
- Supply and fit a new double-panel radiator, sized for the room, on the existing pipework.
- Fit new thermostatic radiator valve and lockshield valve.
- Refill, vent and add inhibitor to the system; test for leaks; balance the radiator.
- Leave the work area clean and remove all waste.
Avoid vague lines such as 'all necessary works' or 'make good as required'. They feel safe to write but mean whatever the customer later wants them to mean.
Exclusions and assumptions that save arguments
Most quote disputes are about something the customer assumed was included. Name the usual suspects explicitly:
- Making good: plastering, tiling and decorating after pipework is moved.
- Electrical work beyond connecting to an existing fused spur.
- Lifting fitted flooring, kitchen units or bath panels that cannot be removed without damage.
- Asbestos surveys or removal, if suspected materials are found.
- Work to the gas meter, the incoming water main or the drains beyond the property boundary.
- Upgrades required by the condition of the existing system once opened up.
Assumptions do the same job from the other side: 'Price assumes existing pipework is in serviceable condition', 'Price assumes clear access to the loft via the existing hatch', 'Price assumes the system can be drained down on the day'. If an assumption turns out wrong, you have a clear basis for discussing a change, which you then agree in writing before doing the extra work.
Payment terms belong in the quote
Agreeing payment terms at the start is far easier than chasing money at the end. Late payment is a common problem for small businesses: in 2025, 63% of SME employers that gave trade credit said late payment had been a problem[3].
- Late payment was a problem 63%
Source: Department for Business and Trade (GOV.UK), 2025[3]
Show the data
| Item | Value |
|---|---|
| Late payment was a problem | 63% |
- Small jobs: payment on completion, by card or bank transfer, stated on the quote.
- Larger jobs: a deposit for materials, a stage payment at a defined point, and the balance on completion.
- Business customers: invoice terms in days, an order number required, and a note that statutory interest of 8% plus the Bank of England base rate applies to late payment[6].
- Name the payment methods you accept and the account details you will use, and tell customers you will never change bank details by email.
Validity, programme and paperwork
Give every quote a validity period, shorter where materials are a large part of the price; protecting quotes against material price rises covers how to set it. Add a likely start date and duration, the working hours, and what the customer must do, such as clearing the airing cupboard or arranging parking.
Finish with the paperwork the customer will receive: your workmanship guarantee and its length, manufacturer warranties and who registers them, certificates, building regulations notifications and commissioning records. Customers value seeing this listed; it is a reason to choose you over a cheaper quote without it.
Acceptance and starting work
Tell the customer exactly how to accept: sign and return, reply to the email, or accept online. For off-premises and distance contracts, add an optional line for the customer to ask you to start within the cancellation period, with a short explanation that if they cancel after you have started at their request they will pay for the work done up to that point. Keep the accepted version with the job record.
Making the quote easy to say yes to
Legal completeness is not the same as clarity. Customers often compare two or three quotes at the kitchen table, and the clearest one has an advantage even when it is not the cheapest. A few presentation habits help:
- Put the summary and total price on the first page, with the detail after it.
- Use the customer's words for the problem: 'no hot water in the upstairs bathroom' rather than a fault code.
- Show optional extras as separate priced lines the customer can tick, not buried in the scope.
- Include one or two photos from the survey with a short caption, such as the corroded valve or the location of the new cylinder.
- Send the quote within a day or two of the visit while the conversation is fresh, and say who to call with questions.
- Keep the standard terms in an attachment or on a second page, referenced clearly from the quote itself.
A quote that reads like a plan of the job, written by someone who listened, does a lot of the selling for you.
Building your own template
Start from your best past quote
Pick the clearest quote you have sent and restructure it into the sections above.
Write standard text once
Draft standard wording for exclusions, assumptions, payment, guarantees and cancellation, and have it checked by an adviser if you are unsure about the legal points.
Build job-type versions
Create versions for your common jobs, such as radiator replacement, cylinder replacement and bathroom first and second fix, with the scope already drafted.
Load it into your software
Put the templates into your job management or quoting system so every quote starts from the same structure.
Review after disputes
Whenever a customer queries an invoice, check whether the quote could have prevented it, and update the template.
Example: before and after
Example: a fictional firm in Derby used to send quotes as a single line and a price. A customer accepted a quote to move a radiator, then complained that the wall had not been replastered. With the new template, the same quote lists 'Making good: we will fill pipe holes; plastering and decorating are excluded', and an assumption that the floorboards can be lifted without damage. The next similar job runs without a query, and the customer arranges a plasterer in advance because the quote told them to.
Frequently asked questions
What should a plumbing quote include?
Your details and registrations, the customer and site, a clear scope, key materials, exclusions, assumptions, the total price and VAT position, payment terms, programme, validity, guarantees and paperwork, cancellation information and how to accept.
Do I have to include cancellation rights in a quote?
For contracts made in the customer's home or remotely, you must give the conditions, time limit and procedure for cancelling, and explain that a customer who cancels after asking you to start must pay reasonable costs[2].
How long should a plumbing quote be?
Usually one or two pages for domestic work. Short enough to read, long enough to state the scope, exclusions, price and terms clearly.
References
legislation.gov.uk (The National Archives) (2013). The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, Schedule 1 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2013). The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, Schedule 2 (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2013). The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, regulation 30 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2013). The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, regulation 36 (opens in a new tab) ↑
GOV.UK (2026). Late commercial payments: charging interest (opens in a new tab) ↑