Quotes pricing

Writing a boiler replacement quote customers understand

What a clear boiler replacement quote includes: the boiler, flush, filter, controls, flue, gas and condensate work, warranty, paperwork and making good.

Ava research teamPublished 7 min read

On this page
  1. What customers actually compare
  2. The boiler itself
  3. Everything around the boiler
  4. Survey checks that make the quote accurate
  5. Why most quotes are combi swaps
  6. Compliance lines that build trust
  7. VAT and alternatives
  8. Boiler-specific assumptions and exclusions
  9. Presenting the price
  10. Explain the installation day
  11. Example: two quotes, one boiler
  12. Frequently asked questions
  13. References

Key takeaways

  • Customers compare boiler quotes on the headline price; show everything around the boiler so they can compare like with like.
  • List the flush, filter, inhibitor, controls, flue, gas and condensate work, removal, making good, notification and warranty registration.
  • Combis dominate: 63% of homes in England had a condensing combination boiler in 2024, up from 2% in 2001[1].
  • Show compliance clearly: gas work only by a registered engineer[2], building regulations notification[3] and the digital Benchmark record[4].
  • State VAT plainly; a conventional boiler installation is standard-rated, unlike heat pump installs, which are zero-rated until 31 March 2027[5].

What customers actually compare

A customer with two or three boiler quotes on the table will look first at the total, then at the boiler brand, and then, if you are lucky, at the rest. Two quotes with the same boiler can differ widely in price because one includes a power flush, a new filter, smart controls and a flue upgrade and the other does not. If your quote does not make those differences visible, the customer assumes the cheaper quote is the same job for less money.

A good boiler quote fixes that by setting out, item by item, everything that goes into the installation. It is not about adding extras; it is about making sure the customer can see what they are buying and compare it fairly.

The boiler itself

  • Make and model, exactly as the manufacturer names it, so the customer can look it up.
  • Type: combination, system or regular (heat-only), and why that type suits the home.
  • Output, and a one-line reason for the size, such as the number of bathrooms and hot water demand rather than the size of the old boiler.
  • Fuel: natural gas, LPG or oil.
  • Manufacturer warranty length, and the conditions attached to it, such as annual servicing, a filter and registration within a set period.
  • Location: like for like, or a move, and if so where to.

Everything around the boiler

Items to list on every boiler replacement quote
ItemWhat the quote should say
System cleanPower flush, chemical flush or mains clean, and why that method suits the system
FilterMake and model of magnetic filter fitted on the return
InhibitorAdded on completion, with the product name
ControlsThermostat or programmer included, and any upgrade such as smart, load or weather compensation
FlueType, route, length, terminal position and any plume management kit
Gas supplyWhether the existing gas pipe size is adequate, or an upgrade is included
CondensateRoute to drain, internal or external, and protection against freezing for external runs
Water treatmentScale reducer where water hardness requires it
Removal and disposalOld boiler, cylinder and tanks if a conversion, and waste disposal
Making goodWhat is filled, boxed in or left for the customer to decorate
Notification and paperworkBuilding regulations notification, commissioning record, warranty registration

If an item is not included, say so in the exclusions rather than leaving it out. 'Gas pipe upgrade not included; if the survey on the day finds it is required, we will price it before proceeding' is far better than a surprise after the old boiler is off the wall.

Survey checks that make the quote accurate

A boiler quote is only as good as the survey behind it. Most overruns on installation day trace back to something the surveyor did not check or did not write down. Make these checks on every survey, and record the findings with photos:

  • Gas meter location, the pipe route to the boiler and whether its size will meet the new boiler's demand.
  • Flue route, terminal position and clearances from windows, doors, boundaries and other terminals.
  • Condensate route to a suitable drain, and whether an external run will be exposed to frost.
  • Incoming mains pressure and flow rate, which decide whether a combi will deliver enough hot water.
  • Hot water demand: number of bathrooms, showers and people, and whether baths are used at the same time as showers.
  • System condition: sludge in a drained sample, cold spots on radiators, seized or leaking valves.
  • Electrical supply to the boiler position and the controls.
  • Access, parking and any furniture or units that need moving.

Write the key findings into the quote as assumptions. If the surveyor measured the mains flow, say so; if they could not, say what the price assumes. That turns a hidden risk into an agreed condition.

Why most quotes are combi swaps

Most boiler replacement work in England and Wales is gas: mains gas was the central heating type for 73.8% of households at the 2021 Census[6]. Within that, combination boilers have taken over the housing stock. In 2024, 63% of homes in England had a condensing combination boiler and 19% another condensing boiler, against 2% and 1% in 2001[1].

Homes in England by boiler type, 2001 and 2024
Homes in England by boiler type, 2001 and 2024Column chart. Condensing combination boiler: 2001 2%, 2024 63%; Other condensing boiler: 2001 1%, 2024 19%.0%20%40%60%80%Condensing combination boiler · 2001: 2%2%Condensing combination boiler · 2024: 63%63%Condensing combination boilerOther condensing boiler · 2001: 1%1%Other condensing boiler · 2024: 19%19%Other condensing boilerHomes in England by boiler type, 2001 and 2024Column chart. Condensing combination boiler: 2001 2%, 2024 63%; Other condensing boiler: 2001 1%, 2024 19%.Condensing combination boilerCondensing combination boiler · 2001: 2%2%Condensing combination boiler · 2024: 63%63%Other condensing boilerOther condensing boiler · 2001: 1%1%Other condensing boiler · 2024: 19%19%
  • 2001
  • 2024

Source: Ministry of Housing, Communities and Local Government (GOV.UK), 2024[1]

Show the data
Item20012024
Condensing combination boiler2%63%
Other condensing boiler1%19%

Condensing boilers have been required for new and replacement boilers in England since the mid-2000s[1], so nearly every quote is for a condensing model. The decisions customers need help with are more practical: whether a combi suits their hot water use, whether a system boiler with a cylinder would be better for a larger home, and what the controls and system clean will do for running costs.

Compliance lines that build trust

Customers rarely know what paperwork a boiler installation needs, but they notice when a quote explains it. Include these lines in every boiler quote:

  • Gas Safe: your registration number and the engineer's, with a note that work on gas fittings may only be done by someone in a class approved by the HSE, in practice a Gas Safe registered engineer[2].
  • Building regulations: installing or replacing a heating system can need approval, and the homeowner does not need to apply separately when the installer is registered with a competent person scheme[3]. Say that you will notify the work and the customer will receive the certificate.
  • Commissioning record: the Benchmark checklist and service record has moved online and into the Benchmark apps[4]; tell the customer how they will receive their record.
  • Warranty registration: who registers it and when, and what the customer must do to keep it valid.

VAT and alternatives

State the VAT position clearly and show domestic customers a VAT-inclusive total. A central heating installation with a conventional boiler is standard-rated as a single supply, whereas the same installation with an air, ground or water source heat pump is zero-rated, because the zero rate for installing specified energy-saving materials applies until 31 March 2027[5].

If you also install heat pumps, a boiler quote is a natural place to mention the alternative without pressure. In England and Wales, the Boiler Upgrade Scheme offers £7,500 towards an air source or ground source heat pump, but no grant for a hybrid system combining a gas boiler with a heat pump[7]. A short, factual note lets customers make an informed choice; a hard sell does not.

Boiler-specific assumptions and exclusions

  • Assumes the existing radiators and pipework are serviceable and will respond to the chosen system clean.
  • Assumes the flue route surveyed is acceptable on the day; any change required by the manufacturer's instructions will be priced first.
  • Excludes replacing radiators or valves unless listed.
  • Excludes electrical work beyond connecting to an existing fused spur.
  • Excludes redecoration, and making good beyond filling and boxing listed in the scope.
  • Excludes asbestos surveys or removal if suspect materials are found around the old boiler or flue.

Presenting the price

Give one clear total for the recommended option, VAT included, with the items above listed underneath. Put genuine options such as a smart thermostat upgrade or a longer warranty as separately priced lines the customer can add. If you want to offer two or three complete packages, structure them as explained in good-better-best options on boiler quotes, and keep the full scope for each one. For the general structure of any quote, see what to include in a plumbing quote.

Explain the installation day

  1. Before the day

    Confirm the date, the arrival time and what the customer needs to clear, such as the airing cupboard or kitchen cabinets around the boiler.

  2. Morning

    Protect floors, isolate gas, water and electricity, drain down and remove the old boiler.

  3. Installation

    Fit the new boiler, flue, filter, controls and any pipework changes; carry out the system clean.

  4. Commissioning

    Test gas tightness and combustion, set up the controls, add inhibitor and complete the commissioning record.

  5. Handover

    Show the customer how to use the controls, what to do if the pressure drops, and when the first service is due. Tell them when the certificate and warranty confirmation will arrive.

Example: two quotes, one boiler

Example: a fictional homeowner in Swindon receives two quotes for the same combi boiler. The cheaper quote lists only 'supply and fit boiler, including flue and commissioning'. The dearer one lists a chemical flush, a magnetic filter, a smart thermostat, an external condensate run with frost protection, a gas pipe upgrade and warranty registration. Once the second firm's office explains on a follow-up call that the first quote leaves out most of these, the customer asks the first firm to requote like for like. Their revised figure is close to the second firm's, and the customer chooses the firm that explained it.

Frequently asked questions

What should a boiler installation quote include?

The boiler make, model, type and output; the system clean, filter, inhibitor and controls; flue, gas and condensate work; removal and disposal; making good; notification, commissioning record and warranty registration; VAT; and clear exclusions.

Is VAT charged on a new gas boiler?

A central heating installation with a conventional boiler is generally a standard-rated supply, while installing a heat pump instead is zero-rated until 31 March 2027[5]. Show domestic customers VAT-inclusive totals.

Does a boiler replacement need building regulations approval?

Replacing a heating system can need approval, but homeowners do not need to apply themselves if the installer is registered with a competent person scheme[3]. The installer notifies the work and the homeowner receives a certificate.

References

  1. Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑

  2. legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑

  3. GOV.UK (2026). Building regulations approval (opens in a new tab) ↑

  4. Heating and Hotwater Industry Council (HHIC) (2026). Benchmark goes digital - what homeowners need to know (opens in a new tab) ↑

  5. HM Revenue and Customs (GOV.UK) (2026). VAT on energy-saving materials and heating equipment (VAT Notice 708/6) (opens in a new tab) ↑

  6. Office for National Statistics (2021). Housing, England and Wales: Census 2021 (opens in a new tab) ↑

  7. GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo