Key takeaways
- Late payment is a major obstacle for 45% of construction SME employers, up from 36% a year earlier[1]; on agent work, most delays start with paperwork.
- Read every works order before you travel: address, access, approval limit and what the agent actually authorised.
- Stop and ask before exceeding the approval limit, with photos and a quote through the agent's process.
- Invoice against the works order number with matching descriptions, photos and certificates attached, within a day or two.
- Keep your own job system as the master record, whichever portals agents make you use.
Payment speed starts before the job
Most plumbing and heating firms think of getting paid as an end-of-job task. On agent and landlord work it starts when the works order arrives. An invoice that does not match the order, lacks photos, or includes work nobody approved goes into a queue, and that queue is where weeks disappear.
The wider picture is not encouraging. In 2025, 45% of construction SME employers named late payment as a major obstacle, up from 36% in 2024 and the highest of any sector[1], and late payment was a problem for 63% of UK SME employers that gave trade credit[1]. 47% of construction SME employers used credit cards as a source of finance[1], which is an expensive way to cover a slow-paying client.
Source: Department for Business and Trade (GOV.UK), 2025[1]
Show the data
| Item | Value |
|---|---|
| 2024 | 36% |
| 2025 | 45% |
You cannot fix an agent's accounts department, but you can remove every reason it has to put your invoice aside.
Reading a works order
| Field | Why it matters | Check before you go |
|---|---|---|
| Works order number | The key that links your invoice to the approval | Copy it into your job system exactly |
| Property address and unit | Blocks and HMOs have several units at one address | Confirm flat or room number with the tenant |
| Reported problem | Defines what was authorised | Ring the tenant if it is vague |
| Approval limit | The most you can spend without asking | Know it before you start |
| Access details | Tenant contact, keys, pets, times | Confirm the appointment in writing |
| Priority | Sets the response time you will be measured on | Book a slot that meets it |
| Landlord or agent instructions | Preferred parts, no-go areas, compliance needs | Read the notes field, every time |
If the reported problem is a boiler not working and you find a failed pump, you are within the order. If you find the boiler also needs a new heat exchanger and the radiator valves are seized, you have moved beyond it. Knowing where that line sits before you open your toolbox is the single biggest thing you can do for your cash flow.
Approval limits and variations
Most agents set an approval limit per job. Below it, you fix and invoice. Above it, you stop, report and quote, and the agent asks the landlord. Going over the limit without approval is the fastest way to an invoice that sits unpaid while everyone argues.
Make safe first
If there is a risk to the tenant or the property, make it safe within the limit and tell the agent what you did.
Diagnose and photograph
Take photos of the fault, the serial plate and anything that explains why more work is needed.
Quote through the agent's process
Use the portal or email route the agent specifies, with a short explanation, the photos and a clear price.
Tell the tenant
Explain that the landlord needs to approve the work and roughly when you expect to hear.
Wait for written approval
A phone call is not enough. Get the approval on the portal or in an email, with any new order number.
Book the return visit promptly
Once approved, book quickly. Agents notice who closes jobs and who leaves them open.
If an agent asks you to go ahead over the limit without paperwork, ask them to confirm by email. It protects both of you when the invoice arrives.
Photos that get invoices approved
- Before: the fault as found, the appliance, its serial plate and the area around it.
- During: anything that will be hidden afterwards, such as pipework under floors or behind panels.
- After: the finished repair, the area left clean and any appliance running.
- Evidence: failed parts, readings such as gas pressure or flue analysis where relevant, and meter readings for leaks.
- Access problems: the door, the time and a note if nobody was home, which supports a wasted-visit charge if you agreed one.
- Labelled: name each photo with the works order number and a short description, so the agent does not have to guess.
Photographs answer the questions an agent's accounts team will otherwise ask by email, and they answer the landlord's suspicion that the job was smaller than invoiced.
Invoices that match the order
- Use the works order number as the invoice reference, exactly as issued.
- Describe the work in the same terms as the order, then what you found and what you did.
- Separate labour, parts and any call-out or wasted-visit charge agreed in advance.
- Attach photos and any certificate or record the job produced.
- Invoice only for approved work; quote further recommendations separately.
- Send within a day or two, through the channel the agent specifies.
If you are VAT registered, make sure each invoice meets VAT rules; registration is required once taxable turnover in the last 12 months goes over £90,000[2]. Your invoicing records also feed your tax reporting. Sole traders and landlords with qualifying income over £50,000 had to start using Making Tax Digital for Income Tax from April 2026, with the threshold falling to £30,000 from April 2027[3], so a single digital job and invoice system saves time twice.
Habits engineers need on agent jobs
The office can only invoice what the engineer records. A few habits on site make the difference between an invoice that is paid in a fortnight and one that bounces back and forth for a month.
- Open the works order on the job app before knocking on the door, and read the notes.
- Take the before photos before touching anything, even on a job that looks simple.
- Write the job notes in plain sentences a landlord would understand, not shorthand.
- Phone the office before going over the approval limit, not after.
- Record any parts taken from van stock against the job straight away.
- Close the job on site with the after photos, not at the end of the day from memory.
Resolving a disputed invoice
When an agent queries an invoice, reply the same day with the facts: the works order, the photos, the approval if there was one, and a short explanation. Keep the tone neutral; the person querying it is usually passing on a landlord’s question. If you made a mistake, correct the invoice quickly and say so. If the dispute is about work done over the limit without written approval, accept that you carry some of the risk and learn from it rather than arguing it out for weeks.
Living with several portals
Each large agent may use a different portal, each with its own logins, statuses and upload rules. It is tempting to let the portals become your system. Resist it. Keep one job management system as your master record: every works order, appointment, photo and invoice lives there, and the portals are where you report to each client.
- Assign one person in the office to check every portal at fixed times each day.
- Accept or decline new jobs quickly; slow acceptance is often measured.
- Update statuses as soon as an appointment is booked, attended or delayed.
- Upload photos and certificates from your master system, not from engineers' phones.
- Reconcile portal payments against your invoices weekly, so missing payments surface early.
Chasing what is owed
Send a monthly statement to each agent listing every open invoice with its works order number. Most late payments are lost paperwork, and a statement finds them. If an invoice is genuinely overdue without a reason, phone the person who manages contractor payments. For business-to-business debts, you can also charge statutory interest of 8% plus the Bank of England base rate[4]. Mention it politely in your terms, and use it when a client pays late repeatedly.
Worked Example: cutting debtor days
Example (fictional): a heating firm doing work for four agents finds that its agent invoices take an average of 52 days to be paid, against 14 days for private customers. It reviews a month of invoices and finds a third were queried: missing order numbers, no photos, or work above the approval limit without written approval.
In the Example, the firm adds the works order number as a required field in its job app, makes before and after photos mandatory before an engineer can close a job, and sends a weekly statement to each agent. Three months later the average is down to 27 days and queries have nearly stopped. For the bigger picture on agent relationships, see what agents ask of contractors and handling landlord and agent calls.
Frequently asked questions
What is a works order?
An instruction from an agent or landlord authorising a specific job, usually with a reference number, address, reported problem, priority and approval limit.
What should I do if a repair costs more than the approval limit?
Make safe, photograph the fault, quote through the agent's process and wait for written approval before doing the extra work.
How can I get paid faster by letting agents?
Invoice against the works order number with matching descriptions, photos and certificates, send it promptly and send monthly statements of open invoices.
Can I charge interest on late agent payments?
On business-to-business debts you can claim statutory interest of 8% plus the Bank of England base rate[4].
References
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
GOV.UK (2026). When to register for VAT (opens in a new tab) ↑
GOV.UK (2026). Check if you're eligible for Making Tax Digital for Income Tax (opens in a new tab) ↑
GOV.UK (2026). Late commercial payments: charging interest (opens in a new tab) ↑