Staffing training

Onboarding a new engineer: the first two weeks, day by day

A two-week onboarding plan for a new plumbing or gas engineer: day-one paperwork, safety induction, ride-alongs, systems training and sign-offs.

Ava research teamPublished 7 min read

On this page
  1. Why the first fortnight decides whether the hire sticks
  2. Before day one
  3. Day one: paperwork and safety induction
  4. Days two to five: ride-alongs by job type
  5. Week two: supervised solo work and sign-offs
  6. Teaching your way of doing things
  7. Five ways onboarding goes wrong
  8. Example: the day-ten review
  9. The end-of-onboarding checklist
  10. After the fortnight: weeks three to twelve
  11. Frequently asked questions
  12. References

Key takeaways

  • The principal written statement is due on the engineer's first day, so have it signed before the van keys are handed over[1].
  • Nobody touches a gas fitting until they are on your Gas Safe registration and you have seen their current competence[2].
  • Plan ride-alongs by job type, not by whoever has a spare seat in their van.
  • Sign off each kind of work separately: a good installer may still need coaching on landlord safety checks.
  • Hiring is hard, so losing a new starter in month one is the most expensive outcome of all[3].

Why the first fortnight decides whether the hire sticks

Finding an engineer is the hard part. In the 2025 small business survey, 45% of construction SME employers named recruitment and skills as an obstacle, up from 44% the year before[3]. Once you have won a hire, a chaotic first week throws that effort away. New starters judge a firm quickly: whether the van is ready, whether anyone explains how jobs are booked, whether they are thrown onto a complaint visit on day two.

Construction SME employers naming recruitment and skills as an obstacle
Construction SME employers naming recruitment and skills as an obstacleComparison. 2024: 44%; 2025: 45%.44%20242024: 44%45%20252025: 45%Construction SME employers naming recruitment and skills as an obstacleComparison. 2024: 44%; 2025: 45%.44%20242024: 44%45%20252025: 45%

Source: Department for Business and Trade (GOV.UK), 2025[3]

Show the data
ItemValue
202444%
202545%

There is also a direct cost. The median full-time employee plumber earned £782.50 a week before tax in April 2026[4]. Two weeks of pay plus employer National Insurance at 15% on earnings above the secondary threshold[5] is money you spend before the engineer is fully productive. A structured plan shortens that unproductive period and tells you early if the hire is wrong.

Before day one

  • Right to work check done and filed, at least two working days before the start.
  • Principal written statement prepared, covering pay, hours, holiday, probation and training[1].
  • Engineer added to your Gas Safe registration, if they will do gas work, and their certificates of competence copied to the file.
  • Van ready: taxed, insured for the driver, stocked to your standard van list, with a tracker if you use one.
  • PPE and workwear in the right sizes, provided free of charge, since workers cannot be charged for PPE they need for the job[6].
  • Phone, job app login, email and certificate software accounts set up and tested.
  • A buddy engineer named and told which days they will have a passenger.
  • Week-one diary built: ride-alongs on planned work, no emergencies or complaints.

Send the engineer a short welcome message the week before: where to be at what time on Monday, who they will meet and what to bring. It removes first-day nerves and stops the 'where do I park' phone call at 7am.

Day one: paperwork and safety induction

  1. Paperwork first

    Sign the written statement, collect bank and emergency contact details, confirm pension enrolment (employers must pay at least 3% under auto-enrolment[7]) and explain how holiday is booked.

  2. Safety induction

    Walk through your risk assessments for the work you do: gas, hot works, asbestos awareness, working at height, manual handling, lone working and confined spaces such as lofts and under-floor voids.

  3. Emergency procedures

    Show exactly what to do on a gas escape, a carbon monoxide concern or an unsafe appliance: who to call, which forms, what to tell the customer.

  4. Vehicle handover

    Check the van together, record existing damage with photos, and go through the van policy, fuel card and any private use rules.

  5. Systems tour

    Log in to the job app together. Open a real job, add photos, complete a test certificate and close it, so the engineer has done every step once before the first live job.

Days two to five: ride-alongs by job type

A sample week-one plan for a gas and heating engineer
DayJob typesWhat the buddy watches for
2Boiler services and landlord safety checksTest sequence, flue checks, how readings are recorded
3Breakdowns and repairsFault-finding order, parts decisions, explaining costs before work starts
4Install day with the install teamProtection of the property, commissioning, handover to the customer
5Engineer leads, buddy watchesCustomer greeting, explaining findings, paperwork closed before leaving

Each evening the buddy sends the office three lines: what went well, what needs coaching and whether the engineer is ready for the next step. Keep it short so it actually happens.

Week two: supervised solo work and sign-offs

In week two the engineer works alone on planned jobs that match what the buddy has signed off. The office keeps their diary lighter than a full engineer's, with travel slack, and calls after the first two jobs each day. A senior engineer checks a sample of certificates and photos every day. Emergency and complaint work waits until the end of the fortnight review.

Sign off work by category. An engineer can be excellent on combi swaps and still be unsure about unvented cylinders, commercial catering or a particular manufacturer's controls. A category list, ticked by a named senior engineer, tells the scheduler exactly what can be booked. Gas categories must match the engineer's current certificates of competence[2].

Teaching your way of doing things

  • How you introduce yourselves at the door and what you say about shoe covers and dust sheets.
  • When to phone the office: before any extra work, any price above the quoted amount, any unsafe situation.
  • How to photograph jobs: before, during, after, data plate and flue terminal.
  • What a closed job looks like: certificate issued, photos uploaded, notes written for the next engineer.
  • How customers are told the outcome, and the standard wording for a 'not to current standards' finding.

Script for the end of a visit: 'I've finished and tested everything. Here is what I found, here is what I did, and this is what I recommend next. You'll get the certificate by email today. If anything changes, call the office and quote this job number.'

Five ways onboarding goes wrong

  1. The emergency pull. A busy Monday and the new engineer is sent alone to a no-heat call in week one. One bad visit can cost you the customer and the engineer's confidence.
  2. The silent buddy. The ride-along engineer is never told what to teach, so the new starter spends three days carrying tools and learns nothing about your paperwork.
  3. The missing van stock. Engineers who lose an hour a day driving to merchants for parts that should have been on the van soon start looking elsewhere.
  4. No feedback until probation ends. Problems that could have been fixed in week two become reasons to let someone go in month three.
  5. Pay and holiday confusion. If the first payslip has an error or nobody can say how overtime is paid, trust drops quickly.

Each of these is cheap to prevent with a written plan and one named person who owns it. In a small firm that is often the owner, but it can be a senior engineer who is paid a little extra for buddying new starters.

Example: the day-ten review

Example (fictional): a firm in Nottingham reviews its new engineer, Sam, on day ten. The buddy notes are positive on services and breakdowns. Two certificates were missing flue readings, and a customer was not told about an extra part before it was fitted. The owner and Sam agree three actions: a certificate check by a senior for one more week, a call to the office before any unquoted part, and a ride-along on a cylinder install. Sam is signed off for services and breakdowns and stays unsigned for cylinders. The review takes 30 minutes and is written down.

The end-of-onboarding checklist

  1. Written statement signed, and the wider statement items diaried for within 2 months[1].
  2. Right to work, driving licence and competence certificates on file.
  3. Safety induction signed by the engineer and the person who delivered it.
  4. Category sign-offs recorded and shared with whoever runs the diary.
  5. Van check, fuel card and tracker set up, with the van policy signed.
  6. First one-to-one booked for week four and a probation review date set.
  7. Feedback from the engineer: what was confusing, what was missing.

Ask that last question seriously. A new starter sees gaps that everyone else has stopped noticing, from missing stock on the van list to a confusing job app screen. Fix one thing they raise and tell them you did.

After the fortnight: weeks three to twelve

Onboarding does not end when the engineer starts running a full diary. Book short one-to-ones at week four, week eight and before the probation review. Use the same three questions each time: what is going well, what is getting in the way, and what would make the next month easier. Keep sampling certificates and job photos, but reduce how often as the engineer proves reliable.

Add new job categories one at a time, each with a ride-along and a sign-off. By the end of probation both sides should know exactly which work the engineer is trusted with, what training comes next and how their pay can grow. Record it, because that note becomes the starting point for the first performance review.

Frequently asked questions

When must a new engineer get a written contract?

The principal written statement must be given on the first day of employment. Some items, such as pension details and disciplinary procedures, can follow within 2 months.

Can a new engineer do gas work on day one?

Only if they are on your Gas Safe registration and hold current competence for that type of work. Many firms still keep them on ride-alongs for the first week.

How long should onboarding last?

Two weeks of structured induction is a sensible minimum for an experienced engineer, followed by one-to-ones through probation.

References

  1. GOV.UK (2026). Employment contracts: written statement of employment particulars (opens in a new tab) ↑

  2. legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑

  3. Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑

  4. Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑

  5. GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑

  6. Health and Safety Executive (2022). Personal Protective Equipment at Work (Amendment) Regulations 2022 (opens in a new tab) ↑

  7. GOV.UK (2026). Workplace pensions: what you, your employer and the government pay (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo