Key takeaways
- Every visit carries fixed costs (travel, parking, set-up, paperwork) that are the same for a ten-minute job as for a two-hour one.
- Work out the fixed cost of a visit from your loaded hourly cost and vehicle costs; HMRC's simplified flat rate for vans and cars is 55p a mile for the first 10,000 business miles in 2026 to 2027[1].
- Set the minimum charge at or above that fixed cost plus a short job, and state it whenever you state your rate.
- Make small jobs better value rather than cheaper: bundle them, list common fixed-price small jobs and offer a 'while we're there' list.
- The total price you show must include unavoidable charges such as a minimum[2].
Why small jobs lose money
A dripping tap, a running toilet or a stiff stopcock takes a competent plumber a few minutes. Getting to it does not. Every visit means driving there and back, finding somewhere to park, carrying in tools, protecting the floor, isolating the water, writing up the job, raising an invoice and sometimes chasing it. Those costs are the same whether the job takes ten minutes or two hours. Price a small job by the minutes spent on the tools and you lose money every time you accept one.
Most firms deal with this by setting a minimum charge. Done well, it is fair to the customer and protects your margin. Done badly, it feels like a penalty and drives away the small jobs that often lead to bigger ones.
What a visit costs before the work starts
Start by listing the time and money every visit takes regardless of the job itself. The figures below are an illustration for a firm in a medium-sized town; replace them with your own after logging a fortnight of small jobs.
| Fixed element | Example time or cost | Notes |
|---|---|---|
| Travel to and from the job | 35 minutes; 12 miles | Longer in cities and rural areas |
| Parking | £4 | Permits, meters or congestion and clean-air charges |
| Arrival, protection and set-up | 10 minutes | Dust sheets, isolating supply, access |
| Packing up and clean-up | 10 minutes | Restoring supply, testing, tidying |
| Paperwork and invoice | 10 minutes | Job sheet, photos, invoice, payment |
| Payment chasing (averaged) | 5 minutes | Small invoices are the most likely to be paid late |
In this Example, a visit uses 70 minutes and 12 miles before any time is spent on the actual repair. That is the floor under every small job.
Putting a price on the fixed cost
Labour is the bigger part. The median gross hourly pay of employee plumbers was £18.82 in 2026[3], and the employer cost per hour is higher once National Insurance at 15% above £5,000 a year[4], pension contributions and unbilled time are added. Use your own loaded cost per hour, or your charge-out rate if you are a sole trader.
Vehicle cost is the other part. If you do not track actual van costs per mile, HMRC's simplified expenses rates are a sensible proxy: for cars and goods vehicles the flat rate is 55p a mile for the first 10,000 business miles in 2026 to 2027, up from 45p before 6 April 2026, and 25p a mile after that[1].
Source: GOV.UK, 2026[1]
Show the data
| Item | Value |
|---|---|
| First 10,000 miles, before 6 April 2026 | 45 pence |
| First 10,000 miles, 2026 to 2027 | 55 pence |
| After 10,000 miles | 25 pence |
Example: with a loaded labour cost of £33 an hour, the 70 fixed minutes cost about £38.50. Twelve miles at 55p add £6.60, and parking £4, for a fixed visit cost of about £49 before any overhead share or profit, and before the repair itself. A small job priced at £45 including the work loses money even if the repair takes five minutes.
Three ways to set the minimum
- A minimum time charge: 'minimum charge one hour', billed at your normal rate. Simple, widely understood, and fits a call-out-including-first-hour structure.
- A fixed small-job price: one figure for any job that takes under, say, 30 minutes on site, parts extra. Easy to say on the phone and easy for customers to compare.
- A small-works visit: a fixed price for a visit of up to an hour in which the engineer works through a list of small jobs. This turns a loss-making single job into a good-value visit for the customer.
Whichever you pick, the minimum must cover the fixed cost of the visit, a short job, an overhead share and some profit. If it does not, you are subsidising every small job from your bigger ones.
Making small jobs better value, not cheaper
Customers object to minimum charges when they feel they are paying for nothing. Give them more for the same visit instead of cutting the price:
- Ask at booking: 'Is there anything else you'd like looking at while the engineer is there?' Most homes have a second dripping tap or a radiator that does not heat properly.
- Offer a short 'while we're there' check: stopcock working, visible leaks, boiler pressure, radiator valves. Note anything that needs a quote.
- Publish fixed prices for the most common small jobs, such as replacing a tap cartridge, a fill valve or an outside tap, so customers know the total before they call.
- Group small jobs geographically on a set day for each area, which cuts travel and lets you set a lower small-works price for flexible customers.
- Offer landlords and agents a small-works visit for each property, booked with the annual gas safety check.
Saying it on the phone
- Explaining the minimum: 'Our minimum charge is this figure including VAT. That covers getting to you, setting up and up to an hour's work, so if there's anything else you'd like sorting at the same time, it won't cost more unless it runs over the hour.'
- When a customer says it's only a washer: 'It might well be. The minimum covers the visit itself, which costs us the same whether the job takes five minutes or fifty. That's why we suggest putting together any other small jobs for the same visit.'
- Offering a cheaper route: 'If you're not in a hurry, we do small jobs in your area on Thursdays at a lower fixed price. Would that suit?'
Getting the legal side right
A minimum charge is part of the price, so it must be visible wherever the price is. The total price in an invitation to purchase includes any fees and charges the consumer will necessarily incur, and where it cannot be calculated in advance you must explain how it will be calculated[2]. An hourly rate on your website with no mention of the minimum is a problem waiting to happen. If you never agree a price or basis, the customer only has to pay a reasonable price[5], which is a poor position for a minimum charge that the customer may see as unreasonable for a five-minute job.
When to waive or reduce it
- Callbacks under your own workmanship guarantee: no charge.
- Small jobs added to a visit already booked for something else: charge the time, not another minimum.
- Regular contract customers, such as agents with many properties, where the volume justifies an agreed small-works rate.
- Elderly or vulnerable customers in genuine difficulty, at the owner's discretion and recorded as a decision, not a habit.
- Follow-on visits from a large job you have just completed, as part of good aftercare.
Setting your minimum in five steps
Log a fortnight of small jobs
Record travel time, miles, parking, set-up, time on the tools, paperwork and payment for every job under an hour.
Calculate the fixed visit cost
Average the fixed time and miles, then apply your loaded hourly cost and a cost per mile.
Add a short job, overheads and profit
Add the typical time on the tools for a small job, your overhead share and your profit margin.
Choose the structure
Minimum time charge, fixed small-job price or small-works visit, whichever is easiest to explain to your customers.
Publish it and train the office
Put it on your website next to your rates, add it to booking confirmations and agree one way of explaining it on the phone.
Example: from loss to small-works visit
Example: a fictional sole trader in Norwich logs two weeks of small jobs and finds he is charging £40 for visits that cost him about £50 in time and van costs before the repair. He moves to a one-hour minimum and starts asking every small-job caller whether there is anything else to look at. Within a month, about a third of small-job visits include a second item, and two lead to quotes for radiator replacements. He loses a handful of callers who only wanted the cheapest price for a washer, and does not miss them.
Frequently asked questions
Why do plumbers have a minimum charge?
Every visit has fixed costs such as travel, parking, set-up and paperwork that are the same however short the job is. A minimum charge covers those costs so that small jobs do not lose money.
What should a minimum charge include?
The fixed cost of the visit, a short period of work (often up to an hour), an overhead share and a profit margin. Parts are usually charged on top, priced before they are fitted.
Do I have to tell customers about my minimum charge in advance?
Yes. The total price you show must include charges the customer will necessarily incur[2], so state the minimum wherever you state your rate and confirm it at booking.
References
GOV.UK (2026). Simplified expenses if you're self-employed: vehicles (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2024). Digital Markets, Competition and Consumers Act 2024, section 230 (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC) (opens in a new tab) ↑
GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 51 (opens in a new tab) ↑