Seasonal operations

Merchant closures over Christmas: stocking up

Plan for merchant closures over Christmas: 2026 bank holiday dates, what to ask suppliers, a van and store stock list, parts lead times and cash limits.

Ava research teamPublished 6 min read

On this page
  1. Why the holiday fortnight catches firms out
  2. Dates to plan around
  3. What to ask suppliers in November
  4. Van and store stock for the holiday period
  5. Prices are still rising
  6. Do not overstock
  7. Give the on-call engineer what they need
  8. Planning the holiday rota around parts
  9. Customers waiting for parts
  10. Example: one firm's holiday plan
  11. In the first week of January
  12. Frequently asked questions
  13. References

Key takeaways

  • In England and Wales, the Christmas 2026 bank holidays fall on Friday 25 December, Monday 28 December (substitute Boxing Day) and Friday 1 January 2027[1].
  • Ask merchants and manufacturers for holiday opening hours, last order dates and parts despatch dates in November.
  • Stock for the faults you actually see in winter, not for every possibility; holding stock ties up cash.
  • Material prices are still rising: rigid pipes and fittings were up 16.9% in the year to September 2026[2].
  • Give the on-call engineer access to a small store of critical parts for the days the counters are shut.

Why the holiday fortnight catches firms out

The days between Christmas Eve and the first working week of January are among the hardest of the year for heating firms. Demand is high: household gas use in October to December 2025 was more than four times the summer level, and January to March was higher still[3]. At the same time, merchants run reduced hours, some branches close entirely, couriers slow down and manufacturers' parts warehouses may stop despatching for several days.

The result is a familiar story: an engineer diagnoses a failed diverter valve on 27 December and the customer waits until 4 January for the part. Most of these waits can be avoided with a few phone calls in November and a better van stock list.

Dates to plan around

Start with the bank holidays. In England and Wales in 2026, Christmas Day falls on Friday 25 December, Boxing Day is moved to Monday 28 December, and New Year's Day is Friday 1 January 2027. In Scotland, the 2 January holiday is moved to Monday 4 January 2027[1]. That creates two long weekends close together, with only a few normal working days between them.

Example holiday planning calendar for 2026 to 2027 (check your own suppliers' hours)
DateWhat to expectPlan
Mid-NovemberMerchants publish holiday hoursCollect hours and last order dates from every supplier you use
Mon 21 to Wed 23 DecLast full trading days for many branchesTop up vans and the store; collect any parts on order
Thu 24 DecReduced hours at many countersDo not rely on it for parts
Fri 25 Dec to Mon 28 DecBank holidays and weekendOn-call only, from van and store stock
Tue 29 to Thu 31 DecSome branches open, often reduced hours; slow deliveriesPhone ahead before driving to a counter
Fri 1 Jan to Sun 3 JanBank holiday and weekendOn-call only
Mon 4 JanNormal trading in most of England and Wales; Scottish bank holidayRestock and return unused parts

What to ask suppliers in November

  • Opening hours for every branch you use from 24 December to 4 January, including any that will be closed.
  • The last order date and time for next-day delivery before Christmas.
  • Which manufacturers' parts can still be ordered and despatched between Christmas and New Year.
  • Whether there is an out-of-hours or emergency counter in your region.
  • Whether the branch will hold parts for you on account if you order in advance.
  • Returns policy for unused stock in January, so you can stock up without being stuck with it.

Write the answers on one sheet and share it with every engineer and whoever answers the phone. The question is always the same: can we get this part today, and from where?

Van and store stock for the holiday period

Base the list on your own job history for the previous two winters. Pull every job between mid-December and mid-January and count the parts used, by boiler make and model. Condensing combination boilers were in 63% of homes in England in 2024[4], so for most firms the list is dominated by combi parts for the three or four brands they see most.

  1. Diverter valves or cartridges for your most common combis.
  2. Circulating pumps and pump heads.
  3. Pressure relief valves, filling loops and pressure gauges.
  4. Fans and spark or flame sensing electrodes for the boilers you service most.
  5. Universal programmers and room thermostats.
  6. Expansion vessels, or the means to recharge them.
  7. Fittings, valves, washers and seals for leaks and bursts, including push-fit for quick temporary repairs.
  8. Condensate pipe, insulation and fittings for frozen condensate jobs.
  9. Inhibitor, leak sealer and cleaning chemicals.

Printed circuit boards are the exception. They are expensive and specific, so most firms do not stock them speculatively. Instead, find out which boards your main merchant can supply over the holiday and which must come from the manufacturer, and for which models a board failure will mean a wait.

Prices are still rising

Buying early has a price effect too. Construction material prices for all work rose 7.2% in September 2026 compared with September 2025, and rigid pipes and fittings rose 16.9% over the same period[2]. Buying the holiday stock in November locks in current prices, but only for parts you will use within a few months.

Construction material price change, September 2026 on September 2025
Construction material price change, September 2026 on September 2025Comparison. All work materials: 7.2%; Rigid pipes and fittings: 16.9%.7.2%All work materialsAll work materials: 7.2%16.9%Rigid pipes and fittingsRigid pipes and fittings: 16.9%Construction material price change, September 2026 on September 2025Comparison. All work materials: 7.2%; Rigid pipes and fittings: 16.9%.7.2%All work materialsAll work materials: 7.2%16.9%Rigid pipes and fittingsRigid pipes and fittings: 16.9%

Source: Department for Business and Trade (GOV.UK), 2026[2]

Show the data
ItemValue
All work materials7.2%
Rigid pipes and fittings16.9%

Do not overstock

Stock on the shelf is cash you cannot use for wages, VAT or the January tax bill. For small firms, cash is already tight at this time of year: 45% of construction SME employers named late payment as a major obstacle in 2025, up from 36% in 2024[5], and 47% used credit cards as a source of finance[6]. A van full of parts bought on a credit card at the end of December is a poor start to January.

  • Set a budget for holiday stock and stick to it.
  • Prioritise parts you used at least twice in last year's holiday period.
  • Use sale-or-return or easy-returns arrangements wherever the merchant offers them.
  • Agree with a nearby firm to share access to expensive, rarely used parts in an emergency.

Give the on-call engineer what they need

  1. Set up a small critical-parts store

    Keep the parts most likely to be needed in one locked place that every on-call engineer can reach.

  2. Keep a live list

    A shared sheet showing what is in the store and on each van, updated whenever a part is used.

  3. Agree swap rules

    If an on-call engineer uses a part from another van, they log it and the van is restocked first thing.

  4. Tell customers the truth

    If a part cannot be sourced until the counters reopen, say so on the first visit and offer temporary measures that are safe.

Planning the holiday rota around parts

Parts and people need to be planned together. An on-call engineer with the right parts can close most breakdowns on the first visit; one without them can only diagnose and promise to come back. When you draw up the rota for the holiday fortnight, give the on-call engineer the best-stocked van, and make sure the person on call on the days counters are shut is the one who knows where the store is and what is in it.

  • Publish the holiday rota by 1 December, with a backup for every day.
  • Restock the on-call van at the end of every shift, not the start of the next one.
  • Brief the person answering the phone on which parts are in stock, so they can set expectations with customers.
  • Keep a short list of customers whose boilers have needed boards or other hard-to-get parts before; if they call, warn them early.

Customers waiting for parts

Some customers will have to wait. Tell them on the first visit, not the second, and give them a realistic date based on what your merchant has told you. Where safe, leave them with something: heating running in a limited way, an electric heater on loan, or hot water from an immersion heater while a diverter valve is on order. Note what you left and collect it when you return. A customer who has been kept informed rarely complains about a wait caused by the holidays.

Example: one firm's holiday plan

Example (fictional): a three-engineer firm in Exeter reviews the previous holiday period and finds that most of its 31 breakdowns used one of nine parts. In November it collects holiday hours from its two merchants, learns that one branch will be closed from 25 December to 3 January, and confirms that the other will hold parts on account. It buys the nine parts for its four most common boiler makes, on sale-or-return, and keeps them in a locked store at the owner's unit. Over the holiday, the on-call engineers complete every breakdown except one, which needs a board, ordered on 29 December and fitted on 4 January. In January, unused parts go back for credit.

In the first week of January

Count what was used and what was not. Return unused parts within the merchant's returns window, restock the vans for the rest of winter, and note any part you wished you had. That list is next year's starting point. Then turn to the money side with January cash flow. For winter peaks generally, see peak call times for heating firms, and for storm damage in the same period, power cuts and storms.

Frequently asked questions

When are the Christmas 2026 bank holidays?

In England and Wales: Friday 25 December, Monday 28 December (Boxing Day substitute) and Friday 1 January 2027. Scotland's 2 January holiday moves to Monday 4 January 2027[1].

Should we stock printed circuit boards for Christmas?

Usually not speculatively. Find out which boards your merchant can supply over the holiday and plan to order on diagnosis, telling customers about any wait straight away.

How much holiday stock should a small firm carry?

Enough for the parts you used at least twice last holiday period, for the boiler makes you see most, within a fixed budget and on sale-or-return where possible.

Are parts prices still rising?

Yes. Rigid pipes and fittings were up 16.9% and all work materials 7.2% in the year to September 2026[2].

References

  1. GOV.UK (2026). UK bank holidays (opens in a new tab) ↑

  2. Department for Business and Trade (GOV.UK) (2026). Construction building materials: commentary, October 2026 (opens in a new tab) ↑

  3. Department for Energy Security and Net Zero (2026). Energy Trends: UK gas, ET 4.1 natural gas supply and consumption (quarterly), September 2026 (opens in a new tab) ↑

  4. Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑

  5. Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑

  6. Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑