Key takeaways
- Household gas demand in January to March is roughly five times the summer level[1]; plan winter as a different business, not a busier version of summer.
- Build a weekly call forecast from last year's job history, then adjust for weather and for changes in your customer base.
- Turn the forecast into engineer-days and decide in advance how many go to breakdowns, installs and planned work each month.
- Protect installs by fixing install days and a clear rule for when an install can be moved for an emergency.
- Use simple triggers, such as calls waiting and the cold-weather forecast, to switch between normal, busy and surge modes.
Winter is a different business
For a heating company, the months from October to March are not just busier. The mix of work changes: more breakdowns, more vulnerable customers, more calls out of hours, fewer customers willing to lose their heating for an install day. Planning works best when you treat winter as its own operating plan, written in September and reviewed monthly.
The seasonal swing is large and repeats every year. Household gas demand in the UK was 22,138 GWh in July to September 2024, rose to 111,142 GWh in January to March 2025, fell to 19,636 GWh the following summer and climbed again to 109,126 GWh in January to March 2026[1]. Demand also moves between years: April to June 2026 was 10% higher than the same quarter of 2025[2], a reminder that a cold spring can extend the season.
Source: Department for Energy Security and Net Zero, 2026[1]
Show the data
| Period | Value |
|---|---|
| Q3 2023 | 18,288 GWh |
| Q4 2023 | 82,333 GWh |
| Q1 2024 | 103,414 GWh |
| Q2 2024 | 40,374 GWh |
| Q3 2024 | 22,138 GWh |
| Q4 2024 | 86,418 GWh |
| Q1 2025 | 111,142 GWh |
| Q2 2025 | 30,786 GWh |
| Q3 2025 | 19,636 GWh |
| Q4 2025 | 88,790 GWh |
| Q1 2026 | 109,126 GWh |
| Q2 2026 | 34,017 GWh |
Step one: a weekly forecast from your own history
National figures show the shape; your job history shows the size. Export last winter's jobs by week and by type. You need four columns: week, breakdown visits, planned visits (services and safety checks) and install days. If your records are patchy, use call logs or invoices instead.
Count breakdowns by week
Plot last winter's weekly breakdown visits. Mark the weeks with cold snaps and the weeks after Christmas.
Find the baseline
Take the median of the ordinary weeks in each month. This is your normal winter week, without the spikes.
Size the spikes
Note how much higher the cold-snap weeks were than the baseline. That ratio is what you plan surge capacity around.
Adjust for change
Add or remove demand for things that have changed: more service-plan customers, a new landlord contract, an engineer who has left.
Write it down
Record the forecast as a simple table by month: baseline breakdowns per week and surge breakdowns per week.
Step two: turn calls into engineer-days
A forecast in calls is not much use until it becomes people. Work out how many breakdowns one engineer can complete in a winter day in your area, including travel, parts runs and return visits. Then divide.
Example (fictional): a firm in Leicester forecasts a baseline of 45 breakdown visits a week in January and 80 in a cold-snap week. Its engineers average four breakdowns a day in winter. Baseline demand needs about 11 engineer-days a week; a cold snap needs 20. With four engineers working five days, it has 20 engineer-days. In a normal January week, that leaves 9 engineer-days for installs, services and safety checks. In a cold snap, there is nothing to spare, so planned work must be movable.
Do not plan on overtime. Employee plumbers and heating installers already have median paid hours of 40 a week, against 36.9 for all employees[3]. Overtime is the reserve for the surge, not the plan for an ordinary week.
Step three: a month-by-month plan
| Month | Expected demand | Install policy | Planned work policy | On-call cover |
|---|---|---|---|---|
| October | Switch-on peak in the first cold weeks | Installs on fixed days only | Finish services early in the month | Named engineer plus backup |
| November | High, rising | Two install days per week | Landlord checks booked flexibly | Named engineer plus backup |
| December | High; holiday gaps | No installs in Christmas week | Planned work paused 23 Dec to 2 Jan | Rota published by 1 November |
| January | Peak | Installs only where the customer has other heat | Services only if diary allows | Two on call in cold snaps |
| February | High | Two install days per week | Resume landlord checks | Named engineer plus backup |
| March | Falling | Build up to spring install programme | Start moving next year's services | Normal rota |
The plan does not need to be clever. It needs to be agreed before the first cold night, so that nobody decides at 7am on a Monday whether an install goes ahead.
Protecting install slots
Installs are often the most profitable work in the diary and the easiest to cancel when the phone rings. Losing them in winter costs more than one job: the customer who waited weeks may go elsewhere, and the engineer trained for installs ends up on breakdowns they do less efficiently.
- Fix install days in advance, such as Tuesday to Thursday, and keep breakdown cover on those days with other engineers.
- Agree in writing with install customers what happens if a severe cold spell hits: a call by 5pm the day before if the date must move.
- Prioritise installs for homes with no working heating; a replacement for a dead boiler is effectively an emergency.
- Keep at least one engineer off installs on every working day so emergencies do not fall on the install team.
- Book survey visits for spring installs in winter evenings or quiet mornings, so the spring diary is ready.
Triggers: normal, busy and surge modes
Write three operating modes and the triggers that move you between them. Then anyone in the office can make the call without waiting for the owner.
- Normal: breakdowns waiting under one day, forecast mild. Planned work as booked.
- Busy: breakdowns waiting more than one day, or a cold-health alert issued for your region. Protected breakdown slots no longer released; services offered later dates.
- Surge: breakdowns waiting more than two days, or several days of sub-zero temperatures forecast. Planned work paused except for vulnerable customers and installs replacing dead boilers; overtime and overflow call handling switched on.
Official cold signals help here. The Cold Weather Payment, for example, is triggered for each seven-day period when the average temperature is zero degrees or below between 1 November and 31 March[4]. When those periods are forecast in your area, expect the calls that come with them. The UK Health Security Agency issues cold-health alerts in the same period, 1 November to 31 March[5].
Service plans and vulnerable customers
If you sell service plans or maintenance contracts, they shape your winter more than any other factor. Plan customers usually expect priority when their heating fails, so count them in the baseline and decide what priority means in practice: a visit the same day, the next day, or ahead of non-plan customers on the list.
Keep a list of customers who have told you they are at higher risk from cold, and agree how they are flagged when they call. In a busy week, the person answering the phone needs to see that flag without searching. Review the list each autumn, because circumstances change, and keep it only for as long as it is needed.
- Decide the response standard for plan customers and put it in writing.
- Check that the plan terms you sold match the capacity you can deliver in January.
- Flag customers at higher risk from cold in your job system, with their agreement.
- Make sure the on-call engineer can see those flags out of hours.
Data worth collecting this winter
Most firms forecast badly because their records are thin, not because forecasting is hard. Start collecting these now and next year's plan will almost write itself.
- Every inbound call, including those not answered, with date and time.
- Job type for every visit: breakdown, service, safety check, install, survey, recall.
- Time from first contact to visit for breakdowns.
- Parts used per job and any job delayed waiting for a part.
- Installs moved and the reason.
- Overtime hours by engineer and week.
- Weather notes for unusual weeks: snow, prolonged frost, storms.
A spreadsheet is fine. What matters is that the same things are recorded the same way every week, by whoever is in the office.
Review every month
At the end of each month, compare forecast and actual breakdowns, engineer-days used and installs moved. If the forecast was off by more than a fifth, ask why: weather, a new contract, or a recording problem. Adjust the next month's plan and keep the notes for next year's forecast. Two winters of good records make the third much easier to plan.
For the nights when demand jumps without warning, see the cold snap playbook. For using weather alerts to set rotas, read weather and cold-health alerts for rota planning. The patterns by hour and day are covered in peak call times for heating firms.
Frequently asked questions
How do I forecast winter calls without software?
Use last winter's job list in a spreadsheet: count breakdowns by week, find the typical week for each month and note how much bigger the cold-snap weeks were. That gives you a baseline and a surge figure to plan around.
Should we stop installs in winter?
No, but fix install days, keep breakdown cover separate and agree with customers what happens if a severe cold spell forces a change. Replacements for dead boilers should go to the front of the queue.
When should the winter plan be written?
In September, before the switch-on peak, and reviewed at the end of every month until March.
What signals tell us demand is about to jump?
Your own calls waiting, sub-zero forecasts and cold-health alerts for your region[5]. Write these into triggers so the office can change mode without waiting for the owner.
References
Department for Energy Security and Net Zero (2026). Energy Trends: UK gas, ET 4.1 natural gas supply and consumption (quarterly), September 2026 (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Energy Trends: UK gas, ET 4.1 natural gas supply and consumption (quarterly), September 2026 (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑
GOV.UK (2026). Cold Weather Payment (opens in a new tab) ↑
UK Health Security Agency (GOV.UK) (2025). Cold-Health Alerting system: overview (opens in a new tab) ↑