Regulation compliance

Which plumbing work must be notified to the water company?

The notifiable work list under the Water Fittings Regulations, what a notice must include, the ten working day rule and the approved contractor exemption.

Ava research teamPublished 6 min read

On this page
  1. Why notification exists
  2. The notifiable list in England and Wales
  3. What the notice must contain
  4. Ten working days and deemed consent
  5. The approved contractor exemption is narrow
  6. Certificates at completion
  7. Scotland and Northern Ireland differ
  8. Gaps that slow approvals down
  9. Example: a booster pump and a new bath
  10. Building notification into your quoting
  11. Frequently asked questions
  12. References

Key takeaways

  • Anyone planning certain water installations must notify the water company and must not begin without its consent[1].
  • The company has ten working days to refuse or set conditions; silence counts as unconditional consent[1].
  • Approved contractors are exempt for three items only in England and Wales, so most notifiable work still needs a notice[1].
  • When an approved contractor does notifiable work, a copy of the completion certificate goes to the water company[2].

Why notification exists

Most plumbing work never needs the water company's involvement. Notification is reserved for installations that carry a higher risk to the public supply, through backflow, heavy demand or pipes that are hard to inspect once buried. Regulation 5 of the Water Supply (Water Fittings) Regulations 1999 says that anyone who proposes to do this work must give notice to the water undertaker and must not begin without its consent, which shall not be withheld unreasonably[1].

In practice the person doing the work usually sends the notice on the customer's behalf. Customers rarely know the duty exists, so it falls to you to spot it at quote stage and build the waiting time into the programme.

Keep it separate in your head from building control. Installing a bathroom that involves plumbing, replacing a heating system or adding radiators can need building regulations approval in England[3], but that is a different process with different paperwork. One job can trigger both, either or neither.

The notifiable list in England and Wales

The regulation 5 table, England and Wales. Always check the current text before relying on it.
ItemWork or fittingThreshold or condition
1Erecting a building or other structureNot a pond or swimming pool
2Extending or altering a water systemPremises other than a house
3A material change of use of any premisesAny
4(a)A bathCapacity over 230 litres to the centre line of the overflow
4(b)A bidet with an ascending spray or flexible hoseAny
4(c)A single shower unit connected to a specified type of supply pipeNot a safety drench shower
4(d)A pump or boosterDrawing more than 12 litres per minute
4(e)A unit with reverse osmosisAny
4(f)A water treatment unit producing waste water or needing water to regenerate or cleanAny
4(g)A reduced pressure zone valve or other mechanical device for fluid category 4 or 5Any
4(h)A garden watering systemUnless designed to be operated by hand
4(i)Any water system laid outside a buildingLess than 750 mm or more than 1,350 mm below ground
5A pond or swimming poolOver 10,000 litres and refilled automatically from the supply

The items that catch domestic firms most often are large baths, pumps and boosters drawing more than 12 litres per minute, water softeners and other treatment units that discharge waste water, automatic garden irrigation, and supply pipes laid shallower than 750 mm or deeper than 1,350 mm[1]. Commercial work adds item 2: almost any extension or alteration of a water system in premises other than a house[1].

What the notice must contain

  1. The name and address of the person giving notice, and of anyone else on whom notices can be served.
  2. A description of the proposed work or change of use.
  3. The location of the premises and their current or intended use.
  4. For most items, a plan of the relevant parts of the premises and a diagram of the pipework and fitting.
  5. Where an approved contractor will do the work, that contractor's name.

These are the five elements regulation 5 lists[1]. Plans and diagrams are not needed for a large bath, a shower unit, a garden watering system or a pond or pool[1], but a clear sketch still speeds up approval. Most water companies publish their own notification form; use it, because an inspector working through a queue will process a familiar form faster.

The water company can refuse consent, or grant it with conditions, by notice given before the end of ten working days from the day your notice was given[1]. If it does not respond within that period, consent is treated as granted unconditionally[1]. Count working days, not calendar days, and keep proof of the date you sent the notice.

Conditions are common on larger jobs: a requirement for a particular backflow device, an inspection before backfilling a trench, or a change to pipe depth. Price them in by quoting notifiable jobs with a line for compliance with any water company conditions, and tell the customer the start date depends on consent.

The approved contractor exemption is narrow

Many plumbers believe that membership of an approved contractor scheme removes the duty to notify. In England and Wales it does so for three items only: altering or extending a water system in premises other than a house, a bidet with an ascending spray or flexible hose, and a reduced pressure zone valve or similar device protecting against fluid category 4 or 5[1]. Everything else on the list still needs a notice, whoever does the work.

Notifiable items in England and Wales and the approved contractor exemptionCount of entries in the regulation 5 table.
Notifiable items in England and Wales and the approved contractor exemptionDonut chart. Still need a notice when an approved contractor does the work: 10 items; Exempt when an approved contractor does the work: 3 items.Still need a notice when an approved contractor does the work: 10 itemsExempt when an approved contractor does the work: 3 items13 items
  • Still need a notice when an approved contractor does the work 10 items 77%
  • Exempt when an approved contractor does the work 3 items 23%

Source: legislation.gov.uk (The National Archives), 1999[1]

Show the data
ItemValue
Still need a notice when an approved contractor does the work10 items
Exempt when an approved contractor does the work3 items

Approval still matters for the jobs that need a notice. The water company sees the approved contractor's name on the form[1], inspectors tend to trust scheme members' work, and the completion certificate gives the customer protection. See our guide to becoming a WaterSafe approved contractor.

Certificates at completion

Where an approved contractor installs, alters, connects or disconnects a water fitting, they must give the person who commissioned the work a signed certificate stating whether the fitting complies with the regulations[2]. For notifiable fittings, a copy of that certificate must also go to the water company[2]. Build both into your close-out routine so they never depend on someone remembering.

Scotland and Northern Ireland differ

Do not assume the English and Welsh list travels. In Scotland, approved contractors may not need advance notice for some highlighted items, but must send a certificate of compliance to Scottish Water on completion, and the exemption is typically restricted to alterations or extensions of plumbing systems[4]. Northern Ireland's table adds greywater and rainwater harvesting systems, fire-fighting systems including domestic sprinklers, flexible shower hoses for use with a WC, and shower-toilets[5]. Its approved contractor exemption covers four items rather than three[5].

Gaps that slow approvals down

Water company teams process notices in a queue. A notice that answers the obvious questions first time gets through; one that does not comes back with a request for information, and the ten working days are lost in the back-and-forth. The usual gaps are predictable.

  • No make or model for the pump, softener or treatment unit, so the team cannot check its backflow arrangement.
  • A sketch that shows the new fitting but not where it joins the supply pipe or what protection sits between them.
  • No trench depth on buried pipework, or depths given only as a range.
  • Missing details of who will do the work, or a contractor name that does not match the scheme listing.
  • The intended use left blank for outbuildings, garden rooms and annexes.

Tell the customer about the wait in the same breath as the price. One sentence is enough: this part of the job has to be notified to the water company, which can take up to ten working days, so the earliest start date is shown on the quote. Customers accept a clear date far more readily than an unexplained delay after they have said yes.

Example: a booster pump and a new bath

Example: a family in a 1990s detached house wants a freestanding bath and better shower pressure. The bath holds 260 litres to the overflow, and the proposed booster pump is rated well above 12 litres per minute. Both are notifiable. The plumber, who is a scheme member, still sends the notice with a sketch of the pipework, the pump model and its proposed backflow protection, and tells the customer the earliest start date is ten working days away.

On day six the water company replies with consent and one condition: the pump must not draw directly from the supply pipe, so a break cistern is needed. The plumber revises the quote before ordering parts. Had the work started on day one, the pump would have been ripped out and the customer would have blamed the firm, not the water company.

Building notification into your quoting

  1. Ask the trigger questions

    At the survey ask about bath size, pumps, softeners or filters, irrigation, outbuildings and trench depths. Note the answers on the quote form.

  2. Flag notifiable lines

    Mark each notifiable item on the quote and explain the waiting period in one sentence.

  3. Send the notice the same day

    Use the water company's form, attach a sketch, and keep the sent date and reference.

  4. Diary the deadline

    Put the tenth working day in the job diary and chase the water company a day before if you need an answer sooner.

  5. Close out with the certificate

    Issue the completion certificate to the customer and send the copy to the water company for notifiable fittings.

Frequently asked questions

Do I need to notify the water company for a combination boiler swap?

Not usually. A like-for-like boiler change in a house is not on the regulation 5 list, although gas and building regulations rules still apply.

Does a water softener need notification?

Yes, if it is a water treatment unit that produces a waste water discharge or needs water for regeneration or cleaning, which most domestic softeners do.

What happens if the water company does not reply?

If it gives no notice within ten working days of receiving yours, consent is treated as granted without conditions.

Is notification the same as building regulations approval?

No. Building control and water company notification are separate systems. A bathroom refit can need building regulations approval and water company notification, one of them, or neither.

References

  1. legislation.gov.uk (The National Archives) (1999). The Water Supply (Water Fittings) Regulations 1999, regulation 5 (opens in a new tab) ↑

  2. legislation.gov.uk (The National Archives) (1999). The Water Supply (Water Fittings) Regulations 1999, regulation 6: contractor's certificate (opens in a new tab) ↑

  3. GOV.UK (2026). Building regulations approval (opens in a new tab) ↑

  4. Water Regs UK (2026). What are the notification requirements for approved contractors working in Scotland? (opens in a new tab) ↑

  5. legislation.gov.uk (The National Archives) (2009). The Water Supply (Water Fittings) Regulations (Northern Ireland) 2009, regulation 5 (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo