Key takeaways
- Construction work is normally standard-rated, but new qualifying dwellings are zero-rated and certain conversions and long-empty homes take the 5% reduced rate[1].
- Subcontractors can zero-rate or reduce-rate their own supplies according to the building being worked on, so the rate follows the project, not your place in the chain[1].
- Boilers and water heaters count as building materials because they are designed to heat space or water; most other appliances do not[1].
- The 5% rate for empty homes needs proof that nobody lived there in the 2 years before work started, so collect it before you quote[1].
- Zero-rated work sits outside the domestic reverse charge, which only applies to standard and reduced-rate construction services[2].
One job, three possible VAT rates
HMRC's starting point is simple: building new and working on existing buildings is normally standard-rated. The exceptions are where plumbing and heating firms win or lose margin. Building a new qualifying dwelling is zero-rated, converting a non-residential building into a home takes 5%, and renovating residential premises that have stood empty also takes 5%[1]. Get the rate wrong and either the customer overpays and complains, or you undercharge and HMRC asks you for the difference out of your own pocket.
These rules only touch your invoices once you are VAT registered, which is compulsory when taxable turnover for the last 12 months goes over £90,000[3]. If you are below that, you still need to understand them: a developer comparing your quote with a registered competitor's will notice if the other firm has correctly zero-rated the work.
0%
VAT rate on construction services for new qualifying dwellings when the conditions in VAT Notice 708 are met[1]
Which rate applies: a quick reference
| Type of work | VAT rate | Notice 708 section | Evidence to keep |
|---|---|---|---|
| Plumbing and heating on a new qualifying dwelling | 0% | Section 3 | Planning consent, plans, contract showing it is a new build |
| Conversion of a non-residential building into a dwelling | 5% | Section 7 | Planning consent for the change of use, before and after use |
| Changing the number of dwellings (house into flats) | 5% | Section 7 | Plans showing the number of dwellings before and after |
| Renovating a home empty for 2 years or more | 5% | Section 8 | Council Tax, Electoral Roll or utility records, or an Empty Property Officer letter |
| Repairs, servicing and refits on lived-in homes | Standard rate | Section 2 | Normal job records |
Source: HM Revenue & Customs (GOV.UK), 2026[1]
Show the data
| Item | Value |
|---|---|
| New qualifying dwelling | 0% |
| Housing association conversion | 0% |
| Conversion to a dwelling | 5% |
| Empty home renovation | 5% |
| Approved alteration to listed home | 20% |
Heat pumps, insulation and other energy-saving materials have their own relief with its own conditions, which we cover in a separate guide on VAT on energy-saving materials. Do not assume the new-build rules and the energy-saving rules give the same answer.
Zero-rating new homes: the conditions
HMRC allows the zero rate when the building is designed as a dwelling, your services are supplied in the course of its construction, you hold a valid certificate where one is needed, and the service is not one that is specifically excluded[1]. Certificates matter for buildings used for a relevant residential or charitable purpose, such as care homes, rather than ordinary houses and flats.
You do not need to be the main contractor. Subcontractors can zero-rate or reduce-rate their supplies according to the building being constructed, and work does not need to be supplied to the main contractor to qualify as closely connected to the construction[1]. The important exception is buildings that need a certificate: HMRC says subcontractor supplies there are always standard-rated.
- Building materials you fit follow the rate of your labour, so pipe, fittings, radiators and cylinders go on the same invoice line rate as the install[1].
- Appliances designed to heat space or water count as building materials, which brings boilers and water heaters inside the relief[1].
- Most other electrical and gas appliances are not building materials, even where Building Regulations require them, so white goods supplied on their own stay standard-rated[1].
- Architectural, surveying, consultancy and supervisory services are always standard-rated, so design-only work for a developer does not qualify[1].
When construction ends, so does the zero rate
Completion is a point in time. HMRC weighs up when a Certificate of Completion was issued, whether the work matches the approved plans and whether the building is habitable[1]. Once a home is complete, later construction services are no longer supplied in the course of construction, so they are standard-rated work to an existing building.
Snagging is the trap. Correcting faults after completion stays inside the zero-rated contract if you did the original work and the snagging forms part of that contract. If a developer calls you in to fix another firm's installation after completion, that is a separate supply to an existing building and cannot be zero-rated[1]. Put the completion date on your file and check it before you raise any late invoice.
New homes are being built to tighter energy rules: the Warm Homes Plan confirmed plans to implement the Future Homes Standard in the first quarter of 2026[4]. Expect more heat pump and low-temperature system work on new sites, and check which relief applies to each part of the specification.
Conversions and the 5% reduced rate
Two kinds of conversion are common for plumbing and heating firms. The first turns a non-residential building, such as a shop, barn or office, into a home. The second changes the number of single household dwellings in a building, for example a house split into two flats or two flats knocked into one, provided at least one dwelling remains[1]. Converting premises so that afterwards they contain only multiple occupancy dwellings, such as bedsits, also qualifies.
The relief covers work that is part of the conversion. HMRC is clear that work unrelated to changing the number of dwellings cannot be reduced-rated[1]. If the client also wants an existing flat's bathroom refitted while the builders are in, that part is standard-rated and needs its own line on the invoice.
Empty homes: the two-year rule and how to prove it
Renovating or altering a home that has not been lived in during the 2 years immediately before work starts can be charged at 5%[1]. The burden of proof sits with you as the supplier, so gather it before you price the job rather than after HMRC asks.
Ask the question at the survey
When was the property last lived in? Write down the answer and who gave it. Investors buying repossessions or probate homes usually know.
Get documentary proof
HMRC accepts Electoral Roll and Council Tax records, utility company records, Empty Property Officers in local authorities or any other reliable source[1].
Prefer the Empty Property Officer letter
If you hold a letter from the council's Empty Property Officer certifying that the property has not been lived in for 2 years, HMRC says you need no other evidence[1].
Record the start date
The 2 years run back from when your work starts. A tenant moving in for six months during the empty period can break the claim, so check carefully.
Split the invoice where needed
Work that is not a qualifying service, such as fitting items that are not building materials, stays standard-rated and must be shown separately.
How CIS and the reverse charge fit in
Most new-build and conversion work for developers also sits inside the Construction Industry Scheme, which covers installing heating, power, water and ventilation systems[5]. Your CIS status decides what the contractor deducts from your payments; it does not change the VAT rate. See our guide to CIS registration for plumbers for the deduction side.
The domestic reverse charge applies to standard and reduced-rate construction services reported within CIS[2]. A 5% conversion job for a VAT-registered main contractor can therefore be reverse charged, while a zero-rated new-build supply is not. The full test, including when the customer is an end user, is in our guide to the domestic reverse charge.
Example: the same firm, two rates in one month
Example (fictional): a three-engineer firm in Leeds is VAT registered. In March it first-fixes heating and hot water on four new semi-detached houses for a local developer, and it plumbs a former bank branch being converted into three flats for a private landlord.
- Example: the new houses. The firm checks the planning consent, confirms they are new dwellings and invoices labour, pipework, radiators and the combi boilers at 0%. It keeps the consent and the developer's order on the job file.
- Example: the bank conversion. Planning consent shows a change of use from commercial to residential. The firm charges 5% on the conversion work. The landlord also asks for an outside tap at his own house; that goes on a separate, standard-rated invoice.
- Example: the snag. Two months after completion, one new house has a weeping compression joint the firm made. It fixes it under the original contract, so there is no new charge and no new VAT question.
Checklist before you send the invoice
- Is the building new, a qualifying conversion or empty for 2 years or more? Write down why.
- Do you hold the planning consent, plans or empty-property evidence on the job file?
- Does the building need a certificate, and if so, is your supply actually standard-rated as a subcontractor?
- Are any items or services outside the relief, such as white goods, design work or unrelated refits?
- Has construction already been completed, making the work standard-rated?
- Does the reverse charge apply because the job is reduced-rated and supplied to a VAT-registered contractor under CIS?
If an answer is unclear, ask before you quote. Pricing at the wrong rate is easier to fix on paper than after the customer has paid. Our guide to VAT on quotes covers how to show the rate clearly at quote stage.
Frequently asked questions
Is a boiler zero-rated on a new build?
Yes, when the rest of your work is zero-rated. HMRC treats appliances designed to heat space or water as building materials, so a boiler fitted in the course of constructing a new dwelling follows the rate of your labour.
Can I zero-rate work if I am a subcontractor to the builder?
Usually yes. Subcontractors can zero-rate or reduce-rate according to the building being worked on. The exception is buildings that need a relevant residential or charitable certificate, where subcontractor supplies are standard-rated.
What proof do I need that a house has been empty for two years?
HMRC accepts Electoral Roll and Council Tax records, utility records or other reliable sources. A letter from the council's Empty Property Officer is enough on its own.
Does the 5% rate apply to the whole conversion job?
Only to the work that forms part of the conversion. Work unrelated to changing the number of dwellings, or to the change of use, is standard-rated and should be invoiced separately.
References
HM Revenue & Customs (GOV.UK) (2026). Buildings and construction (VAT Notice 708) (opens in a new tab) ↑
HM Revenue & Customs (GOV.UK) (2020). Check when you must use the VAT domestic reverse charge for building and construction services (opens in a new tab) ↑
GOV.UK (2026). When to register for VAT (opens in a new tab) ↑
Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑
GOV.UK (2026). What is the Construction Industry Scheme (opens in a new tab) ↑