Key takeaways
- RIDDOR regulation 11 has two gas duties: incidents causing death or hospital treatment (gas conveyors and some LPG suppliers) and dangerous gas fittings (registered gas businesses)[1].
- A registered business must report a dangerous gas fitting within 14 days of having enough information to decide it was dangerous because of how it was designed, installed, modified or serviced[1].
- HSE received 2,010 dangerous gas fitting notifications in 2024/25, most of them gas leaks[2].
- Reporting is in addition to making the situation safe, never instead of it.
What RIDDOR asks of gas engineers
Most tradespeople know RIDDOR as the rules for reporting serious workplace accidents. For gas, the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 go further. Regulation 11 places duties on the businesses that convey and supply gas, and on the registered businesses that install and maintain gas fittings, to tell the Health and Safety Executive about incidents and dangerous installations even when nobody was hurt at work.
The duty sits alongside the basic rule that no employer or self-employed person may carry out work on a gas fitting unless they belong to a class of persons approved by HSE, which in practice means the Gas Safe Register[3]. RIDDOR defines the reporting "approved person" by reference to that same registration[1].
Two different duties
| Duty | Who reports | Trigger | Deadline |
|---|---|---|---|
| Regulation 11(1): gas incidents | Conveyors of flammable gas through fixed pipes, and fillers, importers or non-retail suppliers of refillable LPG containers | Notification of a death, loss of consciousness or hospital visit because of an injury arising in connection with that gas | Notify without delay; report within 14 days |
| Regulation 11(2): dangerous gas fittings | Gas Safe registered employers and self-employed engineers | Enough information to decide a fitting is or has been likely to cause death, loss of consciousness or hospital treatment because of its design, construction, installation, modification or servicing | Report within 14 days of acquiring the information |
For most installers and service engineers, only the second duty applies directly. The first falls on the gas transporter or LPG supplier, although your evidence may feed into their investigation.
Dangerous gas fittings, read carefully
Regulation 11(2) is precise. The danger must be one that could cause death, loss of consciousness or hospital treatment, and it must arise through accidental leakage of gas, incomplete combustion of gas, or inadequate removal of the products of combustion[1]. The cause must lie in the design, construction, manner of installation, modification or servicing of a gas fitting, or of a flue or ventilation used with it.
- A flue installed without proper joints, supports or clearances that is spilling combustion products into a room is a typical reportable case.
- A boiler serviced without the combustion chamber being resealed, producing carbon monoxide, is reportable because of the servicing.
- An unsleeved gas pipe run through a cavity wall and corroded to the point of leaking is reportable because of how it was installed.
- A part that has simply worn out with no link to how the fitting was installed, modified or serviced will often fall outside 11(2), though it still needs making safe.
The regulation also excludes some situations: anything already notifiable or reportable elsewhere in RIDDOR, fittings tested or examined at a place set aside for that purpose, and information the approved person has already reported[1]. You do not need to report the same fitting twice.
What gets reported in practice
HSE publishes the counts every year. In 2024/25 (provisional) there were 2,010 notifications of dangerous gas fittings in Great Britain, down from 2,413 in 2020/21[2]. Gas leaks made up 1,222 of the 2024/25 total, with inadequate flues and other faults at 385 each and inadequate ventilation 18[2].
The split by premises matters for firms with landlord work: 703 notifications in 2024/25 concerned rented premises and 1,307 owner-occupied homes[2]. Boilers and pipework account for many leak and flue notifications, which is unsurprising given how much of the trade's work they represent.
Injury incidents are a separate table. Flammable gas incidents resulting in injury rose to 129 in 2024/25, of which 92 involved carbon monoxide poisoning[2]. Every one of those started with an appliance or fitting someone could have made safe earlier.
How the duty fits with making safe
Reporting is an extra step after the safety action, not a substitute for it. On site, the engineer follows the industry unsafe situations procedure: classify the situation, make it safe with the customer's permission, label it and issue a warning notice. Back at the office, someone decides whether the cause brings it within regulation 11(2) and, if so, makes the report within the deadline.
Gas suppliers have their own duties when carbon monoxide comes from poorly installed or maintained appliances: HSE's guidance says suppliers must notify HSE and investigate such incidents[4]. When the gas emergency service is called to an escape, the conveyor must attend as soon as reasonably practicable and stop the escape within 12 hours[5]. Your clear notes help everyone downstream.
An office procedure for RIDDOR gas reports
Engineer flags it on the job
A tick box on the job sheet: "possible RIDDOR 11(2)", with photos of the fitting, readings, and a short note on the suspected cause.
Same-day review
A named competent person in the firm reviews the evidence and decides whether the cause is design, construction, installation, modification or servicing.
Report within 14 days
Submit the report to HSE in the approved manner, normally its online reporting service, well inside the 14 days.
Keep the record
Save the report reference, the evidence and the decision note with the job. If you decided not to report, record why.
Inform the right people
Tell the customer, and the landlord or managing agent if relevant, that the situation has been reported and what it means for them.
HSE's guidance gives an out-of-hours telephone line for its duty officer for telephone reports in serious cases[4]. For most dangerous fitting reports, a calm, complete online report inside the deadline is what is needed.
Landlords, agents and the customer after a report
Customers are often alarmed to hear that their boiler has been reported to HSE. Explain that the report is about a dangerous fitting, that it helps the regulator spot patterns such as poor installation practice, and that it does not mean the household has done anything wrong. Give them the warning notice and a plain summary of what must happen before the appliance can be used again.
In rented homes, send the landlord or agent the warning notice, the job sheet and a note that a RIDDOR report has been made, the same day. Landlords must already have every gas appliance and flue checked at least every 12 months[6], and a reportable fault found between checks will prompt questions about who did the last one. Keep your own record factual and leave conclusions about other contractors to HSE.
Common mistakes
- Assuming the engineer who installed the fitting will report it. The duty sits with the registered business that has the information, which is usually you.
- Waiting to find out who fitted it before reporting. The report is about the fitting and the danger, not about blame.
- Reporting worn-out parts as dangerous fittings, which wastes time and dilutes useful data.
- Leaving the decision to an engineer at midnight instead of a same-day office review.
- Not keeping a note of reports made, so a later visit to the same address triggers a duplicate.
Train for it before it happens
Reportable findings are rare for any one engineer, which is exactly why the procedure gets forgotten. Cover RIDDOR in induction and in a short refresher each year. Use photos from your own anonymised reports to show what a reportable flue, pipe or ventilation fault looks like, and walk through the job sheet tick box and the office review. Make sure at least two people in the firm can make the report, so a holiday or illness never pushes you past the 14-day deadline.
Example: a flue found in two pieces
Example: during a breakdown visit, an engineer finds a boiler flue in a loft void with a joint that has never been secured. Combustion products are spilling into the loft above a bedroom. He disconnects the boiler with the owner's permission, labels it, issues a warning notice and ticks the RIDDOR box on the job sheet with photos.
Example, continued: the next morning the firm's technical lead reviews the photos, agrees the danger arises from the manner of installation and submits the report to HSE online. The report reference is saved on the job, and the homeowner is told in writing what was reported and why.
Frequently asked questions
Do Gas Safe engineers have to report dangerous appliances to HSE?
Yes, where they have enough information to decide the fitting is or was likely to cause death or serious harm because of its design, construction, installation, modification or servicing. The deadline is 14 days[1].
Who reports a gas incident where someone went to hospital?
Under regulation 11(1), the gas conveyor or relevant LPG supplier that receives notification of the incident must notify HSE without delay and report within 14 days[1].
Is a worn-out boiler part reportable under RIDDOR?
Often not under regulation 11(2), because the cause is wear rather than design, installation, modification or servicing. It must still be made safe under the unsafe situations procedure.
How many dangerous gas fittings are reported each year?
HSE recorded 2,010 notifications in Great Britain in 2024/25 (provisional)[2].
References
legislation.gov.uk (The National Archives) (2013). The Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013, regulation 11 (opens in a new tab) ↑
Health and Safety Executive (2025). RIDGAS: Gas-related incidents reported in Great Britain (Tables 1 and 2) (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑
Health and Safety Executive (2026). Advice on requirements for notifying and reporting gas incidents under RIDDOR and the Gas Safety (Management) Regulations 1996 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1996). The Gas Safety (Management) Regulations 1996, regulation 7 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 36 (opens in a new tab) ↑