Key takeaways
- A profitable year can hide losing jobs. Cost every job after completion, not just the business at year end.
- Compare quoted and actual figures for labour hours, materials, subcontractors, travel and call-backs, every week.
- Use a fully loaded labour cost, not the wage: employer National Insurance, pension and paid holiday all add to it[1][2][3].
- 80% of construction SME employers made a profit in their last financial year[4], so the question is which jobs earned it.
- Feed what you learn straight back into your rates and quote templates.
A profitable year can hide losing jobs
Most small plumbing and heating firms find out whether they made money once a year, when the accountant sends the figures. By then it is too late to know which jobs paid for the rest. A good year may include a run of bathroom refits that lost money, carried by boiler installs and servicing. A bad year may have one disastrous job behind it.
In 2025, 80% of construction SME employers reported a profit or surplus in their last financial year[4]. Being in profit is common. Knowing where the profit came from is what lets you do more of it.
- Made a profit or surplus 80%
Source: Department for Business and Trade (GOV.UK), 2025[4]
Show the data
| Item | Value |
|---|---|
| Made a profit or surplus | 80% |
Job costing answers a simple question for every completed job: what did we quote, what did it cost us, and why are they different?
What to compare
| Cost line | Quoted figure from | Actual figure from |
|---|---|---|
| Labour hours | Your estimate on the quote | Timesheets or job app clock-in and out, including travel |
| Materials | Quote build-up or merchant quote | Merchant invoices and van stock used |
| Subcontractors | Their quote to you | Their invoice |
| Travel and parking | Allowance in the quote | Mileage, tolls, parking receipts |
| Waste and hire | Allowance in the quote | Skip, tip or hire invoices |
| Call-backs | Usually nothing | Hours and parts spent returning to the job |
| Variations | Agreed variation prices | Hours and materials spent on them |
Call-backs are the line most firms forget. A boiler install that needs two return visits for a condensate problem has cost you far more than the quote suggested, even if the original hours were spot on.
Use a fully loaded labour cost
Labour is the biggest cost on most jobs, and the one most often understated. The wage is only the start. The median full-time employee plumber or heating installer earned £19.00 an hour in 2026[5]. On top of that, employers pay 15% secondary National Insurance on earnings above £5,000 a year[1], at least 3% into a workplace pension[2], and fund 5.6 weeks of paid holiday a year[3], plus sick pay, training and time on site that cannot be billed.
Example: a fictional firm pays an engineer £20 an hour. After employer's National Insurance, pension, holiday and an allowance for unproductive time, each productive hour costs the business nearer £28 before the van, tools or insurance. If the firm costs jobs at £20 an hour, every job looks more profitable than it is.
For an owner who works on the tools, use the hourly figure you need to draw to live on and pay your own tax, not zero. A job that only breaks even when the owner's time is free is a losing job.
Overheads: the costs above every job
Job costing tells you each job's gross margin: the price minus the direct costs of doing it. That margin has to pay for everything that is not attached to a single job: the office, phones and software, insurance, accountancy, marketing, vehicle costs not charged to jobs, and the owner's time spent quoting and managing. A job can show a healthy gross margin and still lose money once its share of overheads is counted.
- Add up last year's overheads from your accounts.
- Divide by the number of productive hours your engineers sold, to get an overhead cost per productive hour.
- Add that figure to your fully loaded labour cost when you set rates, or compare it with each job's gross margin per hour when you review costing.
- Revisit it whenever a large overhead changes, such as a new van, an office move or a big insurance renewal.
Firms that skip this step often discover that their smallest jobs, with the most travel and admin per hour, are the ones losing money, even though the gross margin looked fine.
A weekly costing routine
Close the week's jobs
Every Friday, list the jobs completed that week. Do not wait for the final invoice to be paid.
Pull the actuals
Timesheets, merchant invoices, subcontractor invoices and receipts for each job. Job software can do most of this if engineers log time and materials against the job.
Fill the comparison
Quoted against actual for each cost line, and the margin achieved.
Write one line of explanation
For any job where margin fell short of target, note why: underestimated hours, a hidden problem not charged as a variation, a price rise, a call-back.
Act on the pattern
Once a month, look at the explanations together and decide what to change in your rates, templates or site process.
The whole routine takes under an hour a week for a small firm once the habit is formed. The first few weeks take longer because the records are incomplete; that in itself is a useful finding.
Reading the variances
- Labour consistently over on one job type: your estimate for that work is wrong. Update the standard hours in your quote template.
- Labour over on one engineer's jobs: talk to them. It may be a skills gap, a slower but more careful approach, or a scheduling problem.
- Materials over: check whether merchant prices have risen, whether van stock is being used without being recorded, or whether waste is high.
- Variations not charged: the work was done but never written up. Fix the variation process, not the price.
- Call-backs on one job type: look at the install method or the products. The cost of returning is often higher than the cost of doing it differently.
Example: three jobs, one week
| Job (Example) | Quoted margin | Actual margin | Main reason |
|---|---|---|---|
| Combi swap, same position | 30% | 31% | On estimate |
| System to combi conversion | 28% | 12% | Gas pipe upgrade needed, not charged |
| Bathroom refit, week two | 25% | 18% | Tiler delayed, plumber idle half a day |
In this Example, the combi swap was fine. The conversion lost most of its margin because a gas supply upgrade was found during the job and fitted without a variation. The bathroom lost margin to waiting time. The owner added a gas supply line to the conversion survey checklist, introduced a variation form, and started confirming the tiler's dates before giving customers a start date.
Getting accurate records from site
Job costing is only as good as the time and materials recorded by engineers, and most engineers hate paperwork. Make it as easy as possible and explain why it matters.
- Ask for start and finish times per job, including travel, rather than detailed task breakdowns.
- Log materials when they are taken from the van, with a photo of the merchant receipt for anything bought on the way.
- Record call-backs against the original job, not as a new job, so the cost lands in the right place.
- Share the results. Engineers who see that their records changed a price or fixed a recurring problem are far more likely to keep recording.
- Never use the records to blame. The purpose is better quotes, not catching people out.
Keeping the records
A spreadsheet is enough to start: one row per job, with columns for each cost line quoted and actual. Job management software makes it easier if engineers log time and materials against each job as they go. Either way, the records you keep for job costing also support your tax records. Sole traders with qualifying income over £50,000 had to start using Making Tax Digital for Income Tax from April 2026, with the threshold falling to £30,000 from April 2027[6]; digital, job-level records make that easier.
Turn the results into prices
- Update the standard hours for each job type in your quote templates every quarter, using the median of your recent actuals.
- Raise or restructure prices for job types that consistently miss margin, or stop doing them.
- Add the hidden items that keep appearing, such as gas supply upgrades or system cleans, to your survey checklist and quote template.
- Share the results with engineers. Most want to know which jobs make money and will help fix the ones that do not.
You cannot price better than you measure. One hour a week of job costing is the cheapest pricing advice you will ever get.
Common pitfalls
- Costing labour at the wage rather than the fully loaded rate.
- Ignoring travel and waiting time because it is not ‘on the job’.
- Leaving out call-backs and warranty visits.
- Costing only the jobs that felt bad, which skews the picture.
- Collecting the data and never changing anything.
Frequently asked questions
What is job costing for a plumbing business?
Comparing what you quoted with what each completed job actually cost in labour, materials, subcontractors, travel and call-backs, so you know which jobs earn money.
How often should I cost jobs?
Weekly. Close each week's completed jobs on Friday, compare quoted and actual figures and note the reason for any shortfall.
What labour rate should I use?
A fully loaded rate including employer National Insurance[1], pension[2], holiday[3] and unproductive time, not just the wage.
Do I need special software?
No. A spreadsheet works. Job management software helps if engineers log time and materials against each job.
References
GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑
GOV.UK (2026). Workplace pensions: what you, your employer and the government pay (opens in a new tab) ↑
GOV.UK (2026). Holiday entitlement (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑
GOV.UK (2026). Check if you're eligible for Making Tax Digital for Income Tax (opens in a new tab) ↑