Key takeaways
- Most bathroom pricing mistakes are scoping mistakes. List every trade and every stage before you put a figure on anything.
- Price in stages, from strip-out to second fix, so you can see where the time goes and show the customer a clear schedule.
- Use allowances for items the customer has not chosen yet, and a separate contingency for what you cannot see.
- Bathroom work involving plumbing can need building regulations approval[1]; certain water fittings also need notice to the water company first[2].
- Other trades are hard to book: 45% of construction SME employers see recruitment and skills as an obstacle[3], so price the programme as well as the work.
Why bathrooms are hard to price
A boiler swap has one main trade and a standard sequence. A bathroom refit has four or five trades, a customer who is choosing products as you go, and walls and floors that nobody has seen behind for twenty years. Firms that price bathrooms from a single day rate multiplied by a guess usually find out at the tiling stage that they have worked a week for nothing.
The fix is not a bigger margin. It is a structured quote that separates the things you know, the things the customer will choose and the things nobody can know until the old suite is out. Each of those is priced differently and explained differently.
Scope every trade before you price anything
Walk the room with the customer and a checklist. Write down what is staying, what is going and who does each part.
- Strip-out: suite, tiles, flooring, boxing, waste disposal and skip or tip runs.
- First fix plumbing: new supply and waste routes, valves, shower mixer bodies, any change to the soil stack connection.
- Electrics: lighting, extractor fan, shaver point, electric shower or underfloor heating, and who certifies it.
- Carpentry and boarding: floor repairs, stud walls, boxing, tile backer boards.
- Plastering or wet-wall systems, and any making good outside the bathroom.
- Tiling: walls, floor, area and pattern, and who supplies adhesive, grout and trims.
- Second fix: suite, taps, shower, towel rail, accessories, silicone.
- Heating: radiator or towel rail changes, which connect to the heating system and may affect its balance.
- Decorating: ceiling, woodwork, door frame.
Mark each line as yours, a subcontractor's, or the customer's own trade. Anything with no owner is where disputes start.
Price by stage, not by the day
Break the job into stages and estimate each one separately. This exposes the stages you consistently underestimate and gives you a payment schedule the customer can follow.
| Stage | What it covers | Example days | Who |
|---|---|---|---|
| 1. Protection and strip-out | Dust sheets, removal, disposal | 1 | Plumber and labourer |
| 2. First fix | Supply and waste routes, valves, mixer bodies | 1 to 2 | Plumber |
| 3. Electrics first fix | Cabling, fan ducting, back boxes | 0.5 to 1 | Electrician |
| 4. Boarding and plastering | Floor repairs, boards, skim | 1 to 2 | Carpenter or plasterer |
| 5. Tiling | Walls and floor | 2 to 4 | Tiler |
| 6. Second fix | Suite, shower, taps, towel rail | 1 to 2 | Plumber |
| 7. Electrics second fix and testing | Fittings, testing, certificate | 0.5 | Electrician |
| 8. Finishing | Silicone, snagging, clean, handover | 0.5 to 1 | Plumber |
Add drying and waiting time between stages to the programme even though nobody is on site. A customer without a bathroom for three weeks will judge you on whether the programme you gave them was honest.
Labour rates and materials margin
Once the stages are estimated, the labour figure is your days multiplied by a day rate that covers the whole cost of having an engineer on site: wages, employer's National Insurance, pension, holiday, the van, tools, insurance and the unbilled hours spent on surveys and quotes. If you use a single rate for boiler work and bathrooms, check that it holds up for bathroom jobs, which tend to have more waiting and coordination time per productive hour.
- Materials you supply: add a handling margin to cover ordering, collection, storage, breakages and returns. State on the quote that materials are supplied at your price, not at trade cost.
- Materials the customer supplies: charge fitting labour only, but say in writing that you are not responsible for faults, missing parts or delays caused by those items.
- Waste: price skip hire, tip runs and disposal separately; they are easy to forget and easy for customers to understand.
- Travel and parking: on city jobs with paid parking or congestion charges, show them as a line rather than hiding them in the rate.
A customer who asks why your bathroom quote is higher than a fitter's day rate is usually comparing labour only with a fully managed job. Showing the stages and lines makes the difference obvious.
Other trades: booking them and pricing them
Most plumbers either subcontract tiling, electrics and plastering or leave the customer to book their own. Subcontracting gives you control of the programme but makes you responsible for the whole job. If you go that way, add a margin on subcontractor costs to cover coordination, call-backs and the risk of them not turning up, and check whether the Construction Industry Scheme applies to your payments to them[4].
- Recruitment and skills an obstacle 45%
Source: Department for Business and Trade (GOV.UK), 2025[3]
Show the data
| Item | Value |
|---|---|
| Recruitment and skills an obstacle | 45% |
Availability is the other risk. Across UK construction, 45% of SME employers said staff recruitment and skills were an obstacle to business success in 2025[3]. If your usual tiler is booked up for a month, the job waits or you pay someone new. Confirm dates with other trades before you commit to a start date, and build a day or two of slack into the programme you give the customer.
Allowances for what the customer has not chosen
Customers often want a price before they have picked tiles, taps or a shower. Rather than guess, put a clearly labelled allowance in the quote for each item: an amount for supply, with your fitting labour priced separately. If they spend more, the difference is added; if they spend less, it is credited. This is the honest way to handle open choices, and it is covered in detail in the guide to prime cost and provisional sums.
- State whether each allowance is supply only, or supply and fit.
- Make labour separate if the chosen item changes the fitting time, such as large-format tiles or a wall-hung WC frame.
- Give the customer a deadline for choices so that late decisions do not stall the programme.
Contingency for what nobody can see
Rotten joists under the old bath, a lead pipe in the wall, a soil connection that will not take a new pan: these are not anyone's fault, but someone has to pay for them. A separate contingency line, explained at quote stage, is far easier than a surprise bill halfway through.
- Older property with suspended timber floors and original pipework: a larger contingency, because floor and pipe surprises are common.
- Newer property with solid floors and plastic pipework: a smaller contingency, mostly for walls and levels.
- Signs of past leaks, staining or soft floors at survey: say so in writing and price the likely repair as an option rather than hiding it in contingency.
- Customers who want certainty: offer a fixed price with the risk priced in, and explain that it will be higher than the itemised version.
Agree in the quote that contingency is only spent with the customer's approval, item by item, and that any unspent amount is not charged. That turns a suspicious line into a reassuring one.
Compliance belongs in the price
Installing a bathroom that involves plumbing can need building regulations approval in England[1]. When the work is done by an installer registered with a competent person scheme, the homeowner does not need to arrange approval themselves[5]. Certain water fittings also require notice to the water undertaker, and work must not start without its consent[2]. Notification, certificates and the time to arrange them are real costs; put them on the quote rather than absorbing them.
Present the quote so it can be followed
Summary first
One paragraph describing the finished room, the start date and the programme length.
Fixed work by stage
Each stage with its price, so the customer sees what they are paying for and when.
Allowances
Every customer-chosen item with its allowance and the rule for differences.
Contingency
The amount, what it is for, and that it is only spent with approval.
Exclusions
Decorating outside the room, moving furniture, anything the customer is arranging.
Payment schedule
Linked to stages, so payments follow visible progress.
Example (fictional): a firm in York quoting a family bathroom wrote the fixed work in eight stages, listed allowances for tiles, suite and shower separately, and showed a contingency line for floor repairs. The customer chose tiles above the allowance and approved half the contingency for a damaged joist. The final invoice was higher than the quote, but there was no argument, because every change had been agreed in writing as it happened.
After every bathroom, compare the days you priced for each stage with the days it took. Two or three jobs of honest records will sharpen your next quote more than any rate card.
Frequently asked questions
How do I price a bathroom refit as a plumber?
Scope every trade, price the work in stages, use allowances for items the customer has not chosen, add a separate contingency for hidden problems, and include notification and certification costs.
Should I subcontract tiling and electrics?
It gives you control of the programme but makes you responsible for the whole job. Add a coordination margin and check whether CIS applies to your payments[4].
Does a bathroom refit need building regulations approval?
It can, if it involves plumbing[1]. Using an installer registered with a competent person scheme means the homeowner does not have to arrange approval[5].
How much contingency should a bathroom quote have?
It depends on the property. Older homes with timber floors and original pipework need more. Agree that contingency is only spent with approval.
References
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1999). The Water Supply (Water Fittings) Regulations 1999, regulation 5 (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
GOV.UK (2026). What is the Construction Industry Scheme (opens in a new tab) ↑
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑