Key takeaways
- Heat pump demand is growing fast: September 2026 had a record 9,738 Boiler Upgrade Scheme applications[1], and almost 100,000 hydronic heat pumps were sold in 2024[2].
- Survey and design in winter, when you can see how the home and the existing system perform in the cold, and install from spring to early autumn.
- Most grant-funded installs replace gas (55%) or oil (18%) systems[3], so the customer usually still has working heating while they wait for a summer slot.
- Leave a gap before the switch-on season so no install overruns into the first cold weeks.
- Train and certify engineers in the quieter months; capacity is the constraint, not demand.
Why heat pumps need a seasonal plan
A boiler swap is often a day or two. A heat pump install is a project: survey, heat loss calculation, design, grant application, possibly new radiators and a cylinder, outdoor work for the unit and pipework, and commissioning. Doing that in December, with the customer's heating off and engineers needed for breakdowns, makes everything harder.
Demand is rising quickly, which makes planning more important. Up to the end of September 2026 there had been 160,874 Boiler Upgrade Scheme applications, 98% of them for air-to-water heat pumps[4], and 96,611 installations had been paid, including a record 3,332 in September[5]. September 2026 also had a record 9,738 applications, 30% more than August[1].
Who is switching
Understanding what customers are switching from tells you a lot about timing. Of heat pump and biomass installs funded by the scheme, 55% replaced gas systems, 18% replaced oil and 13% went into properties with no previous heating system[3]. Redemptions are split almost evenly between urban (51%) and rural (49%) properties, and 61% of grant properties were on the gas grid[6].
In practice, most customers have a working system while they wait. That gives you the flexibility to survey when it suits the design and install when it suits the work, rather than in an emergency. The exception is a customer whose boiler fails in winter and who wants a heat pump: a temporary repair or temporary heating may be the right answer while the project is planned properly.
Survey and design in winter
Winter is the best time to understand how a home performs. You can feel cold rooms, see which radiators struggle, read real thermostat behaviour and talk to a customer who is thinking about their heating. Use the quieter evening and weekend slots, or the gaps between breakdowns, for surveys.
- Measure every room for the heat loss calculation and note insulation, glazing and draughts.
- Record existing radiator sizes and positions, and pipe sizes where visible.
- Ask how the household uses heat and hot water, including the coldest weeks.
- Check where the outdoor unit can go, the route for pipes and any access constraints.
- Look at the hot water cylinder location or where one could go.
- Photograph everything so the design can be finished in the office.
Then use January to March for design, quotes and grant paperwork. A customer who signs in February can be scheduled for April or May, when the heating is off for much of the day and outdoor work is easier.
Install from spring to early autumn
Longer days, drier ground and heating that is not needed all day make April to September the natural install season. Customers can manage a few days with limited heating and hot water, outdoor bases and pipe runs are easier to complete, and you can commission and adjust the system in mild weather before the first real test.
| Months | Heat pump work | Boiler and breakdown work |
|---|---|---|
| November to February | Surveys, heat loss and design; quotes | Breakdown peak; protect cover |
| February to March | Grant applications; order equipment for spring | Breakdowns falling |
| April to June | Main install period | Services moved into spring and summer |
| July and August | Installs continue; staff holidays planned around them | Boiler replacements |
| September | Finish installs; first-season follow-ups | Prepare for switch-on |
| October | Only installs where the old system has failed and temporary heat is in place | Switch-on rush |
Grant timing and paperwork
In England and Wales, the Boiler Upgrade Scheme gives £7,500 towards an air source or ground source heat pump[7], applied for by the installer. Homes heated by oil or LPG with no mains gas connection can get an extra £1,500 until March 2027[8], and 8,107 applications for the combined £9,000 off-gas grant had been received by the end of September 2026[9]. Vouchers have a validity period, so time the application to the planned install date rather than the survey date, and leave room for delays in equipment delivery.
Costs have fallen: the median installed cost of an air-to-water heat pump under the scheme was £12,826 in July to September 2026, including the grant[10]. Use your own pricing, but expect customers to have seen figures like this.
Capacity is the real constraint
The government aims for more than 450,000 heat pump installations a year by 2030[11], and just under 10,000 people completed a recognised heat pump training qualification in 2024[12]. For a heating firm, the limit is likely to be trained, certified engineers, not customers.
- Book heat pump training in the summer or early autumn, before the winter peak.
- Pair newly trained engineers with experienced installers for their first installs.
- Plan certification work, such as audits and paperwork, for quieter months.
- Keep at least one gas engineer off heat pump work every day in winter for breakdowns.
Customer communication
Heat pump customers need more explanation than boiler customers, and timing is part of it. Explain why you survey in winter and install in spring: it gives a better design and a less disruptive install. Set expectations about the first winter: radiators that feel warm rather than hot, a system that runs for longer at lower temperatures, and controls that work best when left alone.
Book a follow-up call or visit in the first cold spell after the install. Most adjustments to flow temperatures and schedules are easier to get right once the system has faced real winter weather.
Running heat pumps and boilers side by side
Most firms that add heat pumps still earn most of their income from gas boilers, servicing and breakdowns, at least for now. The seasonal plan has to work for both. The simplest approach is to split engineers into roles by season: in winter, everyone is available for breakdowns, and heat pump specialists survey in the gaps; in spring and summer, the heat pump team installs while the rest cover services, boiler replacements and repairs.
Keep the two diaries visible in one place. A heat pump install that overruns by two days should be seen by whoever is booking breakdowns, and the office needs to know which engineers are committed to a multi-day job before promising same-day visits.
- Give heat pump installs their own colour or column in the diary.
- Plan a buffer day at the end of each install, as with bathrooms.
- Review the next six weeks of installs every Monday alongside breakdown forecasts.
- Agree in advance which installs can move if a cold spell arrives early.
The first winter after install
A heat pump's first cold spell is its real commissioning. Customers who were happy in June may call in December worried that radiators feel only warm, that the system runs all day, or that the outdoor unit is steaming during a defrost. These are usually normal, but they need a calm explanation. Prepare a short note for every heat pump customer before winter on what to expect, and make sure whoever answers the phone can explain the basics. A planned check in the first cold week, with any adjustment to flow temperatures and schedules, prevents most of these calls.
Example: one firm's heat pump year
Example (fictional): a five-engineer firm in Shropshire, with many off-gas rural customers, carries out 34 heat pump surveys between November and February, mostly in the afternoons when breakdown demand allows. It sends designs and quotes within two weeks of each survey. Twenty-one customers go ahead; grant applications are timed for installs from late March to mid-September. Two engineers are trained on heat pumps in the previous August. In October, only one install is booked, for a customer whose oil boiler had failed and who has temporary heat. Every installed customer gets a call during the first cold week.
Mistakes to avoid
- Starting installs in October or November because the diary has space, then facing a cold spell with an unfinished job.
- Applying for the grant at survey, then losing the voucher to delivery delays.
- Designing from summer measurements without asking how the home behaves in winter.
- Booking every gas engineer onto heat pumps and leaving breakdown customers without cover.
For the wider pattern of planned work, see spreading annual services across the year and selling boiler replacements in summer. Summer water risks in little-used systems are covered in summer legionella risk.
Frequently asked questions
When is the best time of year to install a heat pump?
For most homes, spring to early autumn. Surveying in winter gives a better picture of how the home performs in the cold, and installing in warmer months is less disruptive.
Can a heat pump be installed in winter?
Yes, but it is harder: the customer needs heat throughout, outdoor work is slower and engineers are needed for breakdowns. If an old boiler fails in winter, temporary heat while the project is planned is often better.
References
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑
GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑