Key takeaways
- Growth is limited by one of three things: not enough leads, too few surveys turning into sales, or not enough installers. Fix the one that binds.
- The replacement market is large and standardised: 63% of homes in England had a condensing combi in 2024[1].
- Heat pumps are taking a growing slice of replacements: 55% of Boiler Upgrade Scheme installs replaced gas systems[2].
- Work backwards from the installs you want to the leads you need, using your own conversion rates.
- Capacity is often the hidden limit: 45% of construction SME employers see recruitment and skills as an obstacle[3].
Find the constraint first
Owners who want more boiler installs usually start with marketing. Sometimes that is right. Often it is not, because the business is already losing leads to slow call-backs, losing surveys to slow quotes, or turning down installs because the diary is full. More leads into a leaking funnel produce more frustration, not more jobs.
- Lead-limited: the diary has gaps, surveys are quick to arrange and most quotes are won. You need more enquiries.
- Conversion-limited: plenty of surveys, but too few become installs. The problem is speed, quote quality, follow-up or price.
- Capacity-limited: you win most quotes but the install date is weeks away and some customers go elsewhere. You need more installers or better scheduling.
Look at the last three months and decide honestly which of these describes you. The rest of this guide is organised around them.
Know the market you are growing into
The boiler replacement market is large and increasingly standardised. Mains gas was the central heating type for 73.8% of households in England and Wales in 2021[4], and by 2024, 63% of homes in England had a condensing combination boiler, up from 2% in 2001[1]. Most replacements are combi-for-combi or system-to-combi, which suits a firm that wants to standardise its process.
The mix is shifting. Under the Boiler Upgrade Scheme, 55% of heat pump and biomass installations replaced gas systems, 18% replaced oil and 13% went into properties with no previous heating[2]. Almost 100,000 hydronic heat pumps were sold in the UK in 2024, a 63% rise[5]. A growth plan that relies only on gas boilers should at least consider where heat pumps will fit.
- Gas systems 55%
- Oil 18%
- No previous heating 13%
- Other 14%
Source: Department for Energy Security and Net Zero, 2026[2]
Show the data
| Item | Value |
|---|---|
| Gas systems | 55% |
| Oil | 18% |
| No previous heating | 13% |
| Other | 14% |
Work backwards from the installs you want
Set a target in installs per month, then use your own rates to work out what it takes. If you do not know your rates, track them for a month first.
| Stage (Example) | Rate used | Needed per month |
|---|---|---|
| Installs (target) | Target | 16 |
| Quotes sent | 40% of quotes won | 40 |
| Surveys done | 90% of surveys quoted | 45 |
| Survey-ready enquiries | 75% of enquiries booked for survey | 60 |
| Calls and web enquiries about boilers | Allow for missed and unsuitable enquiries | 70 or more |
In this Example, the firm needs around 70 boiler enquiries a month. If it currently gets 50 but loses a quarter of them to missed calls, fixing the phones may close most of the gap before any marketing spend. If it gets 80 enquiries but wins only a quarter of quotes, the problem is conversion.
If you are lead-limited
- Ask every past customer for a referral and a review at the point they are happiest, a few days after the install.
- Service every boiler you fit. The servicing customer is the replacement customer of the future.
- Make sure your search and map listings show boiler installation clearly, with recent photos and reviews.
- Join manufacturer installer schemes where the warranty terms and leads suit you.
- Track every enquiry by source so you can stop paying for channels that do not convert.
The guide on where boiler installation leads really come from compares the main sources in more detail.
If you are conversion-limited
Answer and call back fast
A customer with a failed boiler calls several firms. The first to arrange a survey often wins. Make sure calls are answered, and if they cannot be, that a call-back happens within the hour; some firms use Ava to answer, take down the job and book the survey.
Survey to a standard
Use the same checklist every time: flue, gas supply, condensate, system condition, controls, access, customer priorities.
Quote within 48 hours
Same day for straightforward swaps. Slow quotes lose more jobs than high prices.
Make quotes easy to compare
Clear inclusions, exclusions, warranty and payment terms, in the same order every time.
Follow up twice
Two days and a week after the quote, with a specific question, not ‘any thoughts?’.
If you are capacity-limited
A full diary is a good problem, but only if customers wait. Many will not, especially in winter. Capacity growth options, roughly in order of risk:
- Better scheduling: standardise install days, prepare materials the day before, and keep surveys and installs in separate diaries.
- An improver or apprentice working with an experienced installer, which increases what one team can do in a day.
- Trusted subcontract installers for peak periods, with your own quality checks and paperwork.
- A second full install team, once demand has been reliable for at least two seasons.
Recruitment is the hardest part. In 2025, 45% of construction SME employers saw staff recruitment and skills as an obstacle[3]. Start looking well before you need the extra capacity, and consider training: just under 10,000 people completed a recognised heat pump training qualification in 2024, up 15%[6], so skills are growing where firms invest in them.
Standardise the install so it can scale
A firm where every install depends on the owner's judgement cannot grow beyond the owner's diary. Standardising the common jobs is what lets a second team, an improver or a subcontractor deliver the same result.
- Write a standard specification for each common job: combi swap in position, system-to-combi conversion, relocation. Include the flue, filter, system clean, controls and paperwork you always fit.
- Use a pre-install checklist the day before: materials picked, access confirmed, customer reminded, parking arranged.
- Use a handover checklist: commissioning record completed, controls explained, warranty registered, first service booked.
- Photograph every finished install from the same angles, so quality can be checked without a site visit.
- Review one install per installer each month against the standard.
Standard jobs are also easier to quote quickly, which helps conversion, and easier to cost, which protects margin as volume grows.
Grow margin, not just volume
More installs at a thinner margin can leave a firm busier and no better off. As you grow, watch the average margin per install and the cost of winning each one. Marketing that brings in price-shoppers, discounts given to fill a new team's diary, and subcontractors paid more than your own installers all erode margin quietly. Growth that is worth having shows up as more profit per month, not just more jobs on the board.
Plan around the seasons
Household gas demand in the first quarter of 2026 was more than five times the level in the third quarter of 2025[7]. Breakdown-driven replacements arrive in winter, when customers decide in days. Planned replacements, upgrades and heat pump projects are easier to win in spring and summer, when customers have time to compare. Use the quiet months to build the pipeline: contact servicing customers with older boilers, run planned-replacement campaigns and train new staff before the rush.
Numbers to review every month
Growth needs a small dashboard, not a large report. Review these figures on the first working day of each month and compare them with the month before and the same month last year:
- Boiler enquiries received, and the share answered or called back within the hour.
- Surveys booked and completed, and the average days from enquiry to survey.
- Quotes sent, the average days from survey to quote, and the win rate by job type.
- Installs completed, average margin per install and call-backs per install.
- Days from accepted quote to install date, which shows when capacity is becoming the limit.
When one of these moves the wrong way two months running, it is usually the first sign that the constraint has shifted, for example from leads to capacity once a referral programme starts working.
A 90-day growth plan
- Weeks 1 to 4: track every boiler enquiry, survey, quote and install with source and dates. Identify your constraint.
- Weeks 5 to 8: fix the biggest leak. Phones and call-backs if enquiries are lost; quote speed and follow-up if conversion is low; scheduling if capacity is tight.
- Weeks 9 to 12: add one growth lever, such as a referral programme, a manufacturer scheme or an improver, and measure the effect.
- Day 90: compare your funnel numbers with the start and set the next quarter's target.
Grow the part of the business that is holding the rest back. Everything else can wait a quarter.
Frequently asked questions
How do I get more boiler installation jobs?
First find your constraint: lead flow, survey-to-sale conversion or install capacity. Then fix that one, rather than spending on marketing that feeds a leaking process.
How many enquiries do I need for a set number of installs?
Work backwards from your own rates: installs divided by quote win rate gives quotes, divided by survey-to-quote rate gives surveys, and so on back to enquiries.
Should a boiler installer start fitting heat pumps?
It is worth planning for. Heat pumps are taking a growing share of replacements, with 55% of grant-funded installs replacing gas systems[2]. Training and certification take time, so start early.
When is the best time to recruit installers?
In spring and summer, before the winter rush, so new staff are trained and working well by the time breakdown demand peaks.
References
Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Boiler Upgrade Scheme (BUS) monthly statistics: England and Wales, September 2026 (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2025). Longitudinal Small Business Survey 2025: SME employers (businesses with 1 to 249 employees) (opens in a new tab) ↑
Office for National Statistics (2021). Housing, England and Wales: Census 2021 (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑
Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑
Department for Energy Security and Net Zero (2026). Energy Trends: UK gas, ET 4.1 natural gas supply and consumption (quarterly), September 2026 (opens in a new tab) ↑