Key takeaways
- Respond fast and calmly: make safe, gather evidence and log the claim before discussing who is to blame.
- Before-work photos and job reports are your strongest evidence; damp and old leaks are common in housing anyway.
- Tell your insurer early and follow their conditions; do not admit or deny liability on the doorstep.
- If your work caused the damage, own it quickly; if it did not, explain why with evidence and stay courteous.
The first hour
A call saying 'your engineer has flooded my kitchen' or 'there's a crack in the ceiling since you were here' tests a firm more than almost anything else. The customer is upset, possibly frightened, and often already convinced. How you respond in the first hour sets the tone for everything that follows, including whether the matter ends with a handshake or a solicitor's letter.
Whoever takes the call, office or engineer, should follow the same short routine. Write it on one page and keep it by the phone, because the person answering is often the least prepared for an angry customer and the most likely to say something that is hard to take back.
Make safe
If water is escaping, talk the customer through turning off the stopcock and electrics near the leak, and send someone as soon as possible. Safety comes before any discussion of fault.
Listen and log
Record what the customer says in their words, the date and time, and what they can see. Ask for photos straight away.
Neither admit nor deny
Say you take it seriously and will look into it urgently. Do not accept fault or argue about it before anyone has inspected.
Inspect promptly
Send someone experienced, ideally not the original engineer if the customer is angry, to look, photograph and record.
Preserve the evidence
Keep any failed part, take photos and readings, and do not throw anything away until the matter is resolved.
Evidence that matters
- Before-work photos of the area, showing existing marks, stains, cracks or damp.
- The job report: what was done, which joints were made, readings, and the state the area was left in.
- Finish photos showing the work dry and the area clean.
- Any part removed, labelled with the date and job reference.
- Notes of what the customer said at the time, and any advice they declined.
- Photos and moisture readings from the inspection visit.
- Messages and emails exchanged since the job.
Firms that take before-work photos as a habit win far more of these arguments, or avoid them entirely, because the customer can see the stain was already there. Firms without them are left with one memory against another.
Was it us? Working out the cause
Some damage blamed on the last trader through the door has other causes. Damp is common in the housing stock: 5% of dwellings in England, 1.4 million homes, had a damp problem in 2024, up from 4% in 2021 and 2022[1]. A customer who notices a stain for the first time after a visit may have had a slow leak, condensation or rising damp for months.
1.4 million
homes in England had a damp problem in 2024[1]
| Claim | Could be our work | Could be something else |
|---|---|---|
| Water stain on ceiling below bathroom | Leak from a joint we made | Old waste leak, failed sealant, overflowing bath, condensation |
| Damp patch near a new radiator | Weeping valve or joint | Rising damp, bridging, external leak |
| Crack in plaster near new pipework | Drilling or chasing | Settlement or old cracks, now noticed |
| Scratched floor or worktop | Tools or materials during the job | Existing wear; check before photos |
| Boiler damaged after a service | Something disturbed or not refitted | Unrelated component failure |
Look honestly. The legal test is whether you performed the service with reasonable care and skill[2]. If a joint you made has failed, that is your responsibility, and putting the work right is at your cost[3]. If the evidence points elsewhere, say so clearly and show the customer why.
When your engineer did cause it
Sometimes the evidence is clear: a joint you made has failed, a drill went through a pipe, a dust sheet was missing and paint was splashed. Own it quickly. Customers forgive mistakes far more readily than they forgive a firm that argues about an obvious one. Apologise, explain what happened in plain words, and say what you will do and when.
- Fix your own work first, at your cost, and test it in front of the customer.
- Agree how the damage will be made good: your own repair, a specialist such as a decorator or flooring fitter, or through your insurer.
- Put the plan in writing with dates, and keep to them.
- Do not make the engineer apologise in front of the customer as a punishment; deal with that privately.
- Record the cause in your damage log and change the routine that allowed it.
For small, clear-cut matters, such as a scratched skirting board or a stain on a carpet runner, many firms simply pay for the repair directly rather than involve an insurer. Check your policy first so that settling a small claim yourself does not affect your cover for anything larger.
Telling your insurer
If the claim is more than a minor cosmetic fix you can resolve yourself, tell your public liability insurer early. Many policies require prompt notification and say you must not admit liability or agree a settlement without their consent. Read your policy now, before you need it, so you know the conditions.
Notify promptly
Call or email your insurer or broker as soon as a claim looks likely, with the job details and the customer's account.
Send the evidence
Job report, before and after photos, inspection notes and photos, and the customer's messages.
Follow their lead on liability
Let the insurer or its loss adjuster decide what to admit and what to offer, unless they agree you can settle small matters directly.
Keep the customer informed
Tell them you have passed the matter to your insurer, who will contact them, and give a timescale.
Stay involved
Customers feel abandoned when a trader disappears behind an insurer. Check in, even if you cannot discuss the claim itself.
Remember how the customer feels
Damage to someone's home feels personal. The government's consumer protection study asked people how their consumer problems made them feel. They felt upset to some or a great extent in 66% of cases, misled in 59%, helpless in 58% and anxious in 54%[4]. Problems with home services are among those people buy most often: 25% of UK adults had bought home maintenance and repair services in the previous year, and 11% of those buyers had a problem[4].
That emotional side is why tone matters as much as liability. A customer who feels heard is far more likely to accept an explanation, a partial contribution or an insurer's process than one who feels brushed off.
Keeping in touch while a claim is open
Insurance claims take time. Loss adjusters visit, quotes are gathered, decisions go back and forth. To the customer, living with a stained ceiling or a lifted floor, every quiet week feels like being ignored. Agree a contact rhythm, such as a short call or message every week, even when there is nothing new to say. 'Your claim is with our insurer; they expect to visit next Tuesday; I'll call you on Wednesday' is enough. Keep a note of every contact in the claim file.
Reaching a fair outcome
| Finding | Fair outcome | How to deliver it |
|---|---|---|
| Our work caused the damage | Repair the work and make good the damage | Directly if small, via insurer if larger; agree timings in writing |
| Partly our work, partly existing problems | Fix our part, explain the rest, perhaps contribute | Show evidence and put the split in writing |
| Not our work | Explain with evidence and offer help to fix the real cause | Written explanation with photos, quote if wanted |
| Unclear | Independent opinion, or a goodwill gesture if small | Agree the process with the customer and insurer |
Script when it was not you: 'We've looked carefully. The stain is below the old bath waste, which we didn't touch, and our before photos show a mark there already. I've sent you the photos. We can quote to replace the waste if you'd like, but we don't believe our work caused this.'
Example: the ceiling stain
Example: three days after a fictional firm replaced a basin tap, the customer reports a brown stain on the kitchen ceiling below the bathroom and demands the firm pay for redecoration. The office logs the claim, asks for photos and sends a senior engineer the same afternoon. He finds the tap connections dry, but the bath waste seal is failing and water has been tracking along a joist. The before photos, taken when the engineer arrived for the tap job, show a faint stain already present. The firm sends the customer the photos, explains the cause and quotes for a new waste. In this example the customer accepts the explanation, books the repair and later says the photos were what convinced her.
Preventing the next dispute
- Make before photos compulsory on every job, including existing damage.
- Point out existing damage to the customer before starting, and note it on the job sheet.
- Test every joint you make and photograph the dry result.
- Check your insurance cover and claim conditions every year at renewal.
- Keep a log of damage claims and their causes; review it with the team.
Frequently asked questions
Should I admit fault if I think my engineer caused the damage?
Be honest, but check your insurer's conditions first. Many policies say you must not admit liability or settle without their consent. You can still apologise for the problem and promise to sort it out.
What if the customer refuses to let us inspect?
Explain politely that you need to see the damage to work out the cause and that your insurer will need it too. Ask for clear photos in the meantime and record the refusal.
How do I prove damage was already there?
Before-work photos are the best evidence. Pointing out existing damage to the customer before you start, and noting it on the job sheet, makes it even clearer.
References
Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 1, housing quality (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 49 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 55 (opens in a new tab) ↑
Department for Business, Energy and Industrial Strategy (GOV.UK) (2022). Consumer protection study 2022: understanding the impacts and resolution of consumer problems (opens in a new tab) ↑