Key takeaways
- Since April 2018 every gas boiler fitted in an existing English home must carry a 92% ErP product rating, and time and temperature controls are explicit[1].
- A replacement gas combi also needs one of four extra measures: flue gas heat recovery, weather compensation, load compensation or a smart thermostat with automation and optimisation[2].
- The requirements now sit in Approved Document L and continue in the 2026 edition[3].
- TPI control does not count as load compensation, and a smart thermostat only counts if the qualifying functions are present[1].
Where Boiler Plus sits today
Boiler Plus started as a set of standards for boiler installations in existing homes in England from April 2018[1]. It was published as an amendment to the building services guidance and has since been folded into Approved Document L itself, which is where you will find it now[2].
The 2026 edition of Approved Document L, which takes effect on 24 March 2027 for most work, keeps the combi requirement in the same form[3]. Anyone hoping it would be quietly dropped should plan on it staying. It applies in England; Wales, Scotland and Northern Ireland set their own standards.
Because most homes already have a combi, this affects the majority of your replacements. The English Housing Survey found 63% of English homes had a condensing combination boiler in 2024[4].
The three requirements in plain terms
- Efficiency: a gas boiler must have a product rating of at least 92% ErP. The figure applies to the boiler itself, not the system label, so a less efficient boiler cannot be brought up to standard by adding controls[1].
- Controls: timers and room thermostats are an explicit requirement for all gas and oil systems[1].
- Combi extra measure: when a gas combination boiler is installed in an existing dwelling, at least one additional energy efficiency measure appropriate to the system must be fitted[2].
92%
Minimum ErP product rating for a gas boiler on a wet heating system in an existing English home[2]
Approved Document L still allows lower seasonal efficiencies in exceptional circumstances defined by the older condensing boiler assessment procedure: 78% for natural gas and 80% for LPG on the SEDBUK 2009 measure[2]. Those cases are rare and need the assessment to back them up.
Source: Ministry of Housing, Communities and Local Government (GOV.UK), 2023[2]
Show the data
| Item | Value |
|---|---|
| Standard minimum (ErP) | 92% |
| Exceptional circumstances, LPG (SEDBUK 2009) | 80% |
| Exceptional circumstances, natural gas (SEDBUK 2009) | 78% |
What counts as each extra measure
| Measure | What it does | Watch out for |
|---|---|---|
| Flue gas heat recovery | Recovers heat from the flue to preheat incoming cold water | Space above the boiler and compatibility with the model |
| Weather compensation | Adjusts flow temperature to the outdoor temperature | Sensor position and a heat curve actually set at commissioning |
| Load compensation | Varies flow temperature according to how far the room is from its set point | On and off TPI cycling does not count |
| Smart thermostat with automation and optimisation | Learns or stores user preferences and optimises start times | A basic app-controlled thermostat without those functions does not count |
Two clarifications from the government's own FAQ settle most arguments. First, time proportional and integral (TPI) controls are not load compensation[1]. Second, a smart control counts only if it has the specific functions named in the rules: load compensation, weather compensation, or automation combined with optimisation[1]. Read the product's compliance statement rather than trusting a box that says 'smart'.
Why system and heat-only boilers are left out
The combi measure applies only to gas combination boilers. The government explained that many system and regular boilers need extra work to make them compatible with the qualifying devices, and that without that work there could be a Legionella risk, so it chose to apply the rule first where there was no such risk[1]. System and heat-only boilers still need the 92% product rating and the time and temperature controls.
There is nothing to stop you recommending weather or load compensation on a system boiler where it suits. Just make sure the hot water side keeps a safe storage temperature and follows the cylinder maker's instructions.
The room controls and interlock that come with it
Approved Document L adds requirements that apply whatever the boiler type. When a boiler is replaced in an existing home, each heated room should have thermostatic room controls, for example a room thermostat in one room and thermostatic radiator valves on the radiators in the others[2]. Work on any system with a boiler should include a boiler interlock, and heating and hot water should have separate time control unless they were already controlled together[2].
- Do not fit a thermostatic radiator valve in the same room as the room thermostat.
- Rooms without heating do not need thermostatic control.
- Two adjacent rooms with a similar use, such as a kitchen and utility, can be treated as one zone.
- Open-plan single-storey homes where the living area dominates can be treated as a single zone.
Choosing the right measure for the home
Pick the measure the customer will actually benefit from and keep, not the cheapest box to tick. A few questions narrow it quickly.
- Does the boiler support weather compensation natively with a manufacturer sensor? If so, it is often the simplest and most robust option.
- Will the customer use an app and keep it connected? If not, an automation and optimisation thermostat may not earn its keep.
- Is there an OpenTherm or manufacturer-protocol thermostat available for the boiler? Load compensation relies on the boiler and thermostat talking to each other.
- Is there a suitable north-facing wall for an outdoor sensor, away from flues and direct sun?
- Is there space above the boiler for flue gas heat recovery, and is the unit approved for that model?
Worked Example: two installs, two choices
Example. A second-floor flat with a combi in a kitchen cupboard and no external wall access suitable for a sensor. The tenant is not interested in apps. The installer fits a load-compensating room thermostat that uses the boiler's own protocol, confirms in the settings that compensation is enabled, and records the model and setting on the commissioning record.
Example. A semi-detached house with a combi on an outside wall and an owner who works from home. The boiler supports a manufacturer weather sensor, which the installer fits on the north wall, setting a heat curve that suits the radiators. The owner keeps their existing app thermostat for scheduling, but the compliance measure recorded is the weather compensation.
Mistakes that leave an install non-compliant
- Fitting a thermostat that supports compensation but never enabling the function in the boiler or thermostat menu.
- Relying on the customer's existing smart thermostat without checking that it has the qualifying functions and that it works with the new boiler.
- Fitting a weather sensor in direct sun or above a flue terminal, so the boiler reads a mild day all winter.
- Leaving the old time clock and adding a new thermostat, so heating and hot water control is muddled and the customer overrides everything.
- Skipping thermostatic radiator valves because the old ones 'still work', when they are seized open or missing from some radiators.
- Forgetting the boiler interlock on a system boiler with a cylinder, so the boiler fires with no demand.
Each of these is easy to fix on the day and awkward to fix later, because you have to go back, explain why and usually do it at your own expense.
Recording compliance
Write down which measure you fitted, the model, and how it was set up. 'Weather compensation fitted' is weaker evidence than 'manufacturer outdoor sensor fitted on north elevation, curve set to suit radiators, compensation enabled in boiler menu'. Attach a photo of the setting screen where the commissioning app allows.
If the customer later removes or disables the measure, that is their choice, but your record should show it was fitted and working when you left.
For the wider Part L picture and how compensation works for customers, see Part L for heating installers and weather compensation explained.
Explaining the rules without sounding like a salesman
Customers sometimes see the extra measure as an add-on dressed up as a legal requirement. Be straightforward: it is a requirement for combis in England, it is listed in the government guidance, and you will help them choose the version that suits how they live.
A short script helps: 'Because this is a combi in England, the regulations say I have to fit one extra efficiency feature with it. There are four options. For your home, I would suggest this one, because it works without you needing to use an app. It should make the boiler run more gently most of the time.'
- Put the chosen measure on the quote as a named line, not hidden in the boiler price.
- Avoid promising a specific saving; say it helps the boiler run more efficiently.
- If the customer wants a particular smart thermostat, check it qualifies before agreeing.
Frequently asked questions
Does Boiler Plus apply in Wales or Scotland?
No. Boiler Plus applies in England. Wales, Scotland and Northern Ireland set their own requirements for boiler installations.
Does a smart thermostat always satisfy Boiler Plus?
Only if it has the qualifying functions: automation with optimisation, or weather or load compensation. A basic app-controlled thermostat does not count on its own.
Is TPI the same as load compensation?
No. The government's guidance is clear that TPI controls should not be treated as load compensation.
Do system boilers need an extra measure?
No, but they still need a 92% ErP product rating, time and temperature controls, thermostatic room controls and a boiler interlock.
References
Department for Business, Energy and Industrial Strategy (GOV.UK) (2018). Boiler Plus: new standards for domestic boiler installations from April 2018, frequently asked questions (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2023). Approved Document L, Volume 1: Dwellings (2021 edition incorporating 2023 amendments) (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2026). Approved Document L, Volume 1: Dwellings (2026 edition) (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑