Metrics growth

Break-even: how many jobs a van needs each week

Work out how many jobs each van and engineer needs a week to break even: fixed costs, contribution per job, a worked Example and what moves the number.

Ava research teamPublished 7 min read

On this page
  1. Why think in vans
  2. Step one: weekly fixed costs per van
  3. Step two: contribution per job
  4. Example: one van in the Midlands
  5. What moves the break-even point
  6. Choosing the next van
  7. Using break-even week to week
  8. If you are the engineer in the van
  9. Common mistakes
  10. Frequently asked questions
  11. References

Key takeaways

  • Treat each van and engineer as a unit with its own weekly fixed costs and its own share of overheads.
  • Contribution per job is the price minus the costs that only exist because the job happened: parts, fuel for that trip, card fees.
  • Break-even jobs per week = weekly fixed costs divided by average contribution per job. Work it out separately for winter and summer mixes.
  • Employer National Insurance is 15% above £5,000 a year[1]; the Employment Allowance can offset up to £10,500 of it for eligible employers[2]. Include both.
  • Van choices are shifting: zero emission vans were 10.5% of new registrations in April to June 2026[3]. Run the numbers on running costs, not just the lease.

Why think in vans

For most plumbing and heating firms, the van and the engineer in it are the unit of production. Each one carries a set of costs that arrive every week whether or not the phone rings: the van lease or loan, insurance, the engineer's wage, the tools, the phone and the share of the office that keeps the diary running. Break-even asks a simple question: how many jobs does that unit need each week before it starts making money?

The answer is useful in three places. It tells you whether a quiet week is a problem or just a dip. It tells you how far prices can fall before a job stops being worth doing. And it gives you a hard test for adding a second or third van: can the diary realistically supply the extra jobs?

Step one: weekly fixed costs per van

List every cost that does not change with the number of jobs, convert each to a weekly figure, and add a fair share of the business overheads. Example: with three vans and £60,000 of overheads, each van carries £20,000 a year, or about £385 a week.

  • Engineer pay, including employer National Insurance at 15% on earnings above £5,000 a year[1], pension and holiday pay. Holiday matters: the van still costs money in the weeks the engineer is away.
  • Van finance or lease, insurance, road tax, tracker and planned maintenance.
  • Tools, test equipment calibration, consumables kept on the van and protective equipment.
  • Phone, tablet and job software licence for that engineer.
  • Registrations and training: Gas Safe, any competent person scheme and manufacturer courses.
  • The van's share of overheads: office staff, premises, accountancy, marketing and the owner's time.

If you employ staff, check whether you can claim the Employment Allowance, which is £10,500 for 2026 to 2027 and reduces an eligible employer's National Insurance bill[2]. Spread across the year, it lowers the weekly fixed cost of every employed engineer.

Step two: contribution per job

Contribution is what each job leaves behind to pay the fixed costs. Take the price excluding VAT and subtract only the costs that happen because of that job: parts and materials, fuel for the trip, parking or congestion charges, card or finance fees, and any subcontractor. Do not subtract the engineer's wage; that sits in fixed costs because you pay it either way.

Work out average contribution for each work type, because they differ widely. A breakdown repair may leave most of its price as contribution because parts are cheap relative to the labour. A boiler replacement leaves a large amount in pounds but takes several engineer days, so contribution per day is the fairer comparison for big jobs.

Count a two-day replacement as two job slots in the break-even calculation, or convert everything to contribution per engineer day. Mixing the two makes the answer meaningless.

Example: one van in the Midlands

Example weekly fixed costs for one van and engineer (fictional figures)
Weekly cost (Example)Amount
Engineer salary, on-costs and holiday cover£890
Van lease, insurance, tax, tracker and servicing£210
Tools, consumables, phone and software£65
Training and registrations£20
Share of overheads£385
Total weekly fixed cost£1,570

Example: the firm's average breakdown repair is priced at £185 excluding VAT, with £45 of parts, £8 of fuel and £4 of card fees, leaving contribution of £128. Its average service is £95 with £6 of consumables and £6 of fuel, leaving £83. A typical week for this van is two-thirds repairs and one-third services by job count, giving an average contribution of about £113 per job.

Example break-even: £1,570 divided by £113 is about 13.9, so the van needs 14 jobs a week to cover its costs, or nearly three a day across five days. Every job after that adds about £113 of profit. At 18 jobs a week the van makes around £460 a week, roughly £21,000 over a 46-week working year.

Example sensitivity: if the work mix shifts in summer to more services and fewer repairs, average contribution falls to about £100 and break-even rises to 16 jobs. If the firm raises the repair price by £15 without losing work, break-even in winter falls to about 12.8 jobs. Small changes in price and mix move the number more than most owners expect.

What moves the break-even point

  1. Price. Contribution rises pound for pound with price, so a modest rise has a large effect on break-even.
  2. Parts and fuel. Rising merchant prices and fuel shrink contribution on every job. Review them quarterly and see the guide to fuel and van costs.
  3. Work mix. More short, low-contribution jobs push break-even up even when the diary looks full.
  4. Return visits. A second visit for parts adds cost but no new contribution, so it effectively raises the break-even number.
  5. Overhead creep. Every new subscription or office cost spreads across the vans and lifts their fixed cost.
  6. Holiday and sickness. Weeks with no engineer still carry the van's fixed costs, so annual break-even should allow for them.

Choosing the next van

Zero emission share of new van registrations, April to June 2026
Zero emission share of new van registrations, April to June 2026Donut chart. Zero emission vans: 10.5%.Zero emission vans: 10.5%10.5%
  • Zero emission vans 10.5%

Source: Department for Transport (GOV.UK), 2026[3]

Show the data
ItemValue
Zero emission vans10.5%

Van buying is on the rise: 81,644 new light goods vehicles were registered in April to June 2026, 8.8% more than a year earlier[4], and zero emission models made up 10.5% of them[3]. For break-even purposes, the lease figure is only part of the comparison. Fuel or charging cost per job, maintenance, insurance, any clean air zone or congestion charges in your area and the range you need on a winter day all change the weekly fixed cost or the contribution per job.

Run both options through the same calculation. If an electric van costs more per week to lease but less per job to run, the break-even point may barely change for a firm working a tight local area, and may rise for a firm covering long rural distances.

Using break-even week to week

  1. Calculate it once properly

    Use last year's accounts and job data to set weekly fixed costs and average contribution for each van, for winter and summer separately.

  2. Write the number on the board

    Put each van's break-even jobs per week where the diary is managed. Whoever books the work should know when a van is short.

  3. Check the coming week every Thursday

    If a van is booked below break-even for next week, fill the gap with follow-ups, quote visits or planned work from the call-forward list.

  4. Recalculate after any change

    A price rise, a new lease, a pay award or a new overhead changes the number. Update it the same week.

  5. Compare with actual results quarterly

    Check the profit each van actually made against the break-even prediction and adjust the averages.

Break-even also gives you a clear test before growing. A new van only makes sense when the diary can supply its break-even jobs within a few months, and you need the cash to fund the weeks before it does; our guide to debtor days covers getting paid faster. For the margin side, see gross margin vs net profit.

If you are the engineer in the van

Sole traders often skip break-even because there is no wage to pay. There is: yours. Decide what you need to draw each week to cover your household, tax and pension, and treat it as the engineer cost in the calculation. Without it, the van can look profitable while the owner is effectively working for nothing.

  • Add your target weekly drawings to the van's fixed costs.
  • Set aside tax and National Insurance on top, because they are due on profit, not on drawings.
  • Include the hours you spend on quotes, invoices and calls as overhead time, not as free time.
  • Recalculate before you take on a subcontractor or an apprentice, because the van's capacity and costs both change.

Common mistakes

  • Leaving the owner's time out of overheads, which makes every van look more profitable than it is.
  • Using prices including VAT, which inflates contribution by a fifth for VAT-registered firms.
  • Counting a multi-day job as one job.
  • Working out break-even on a 52-week year when engineers take 5 to 6 weeks of holiday and bank holidays.
  • Treating break-even as a target. It is the floor; the target is break-even plus the profit you need.

Frequently asked questions

How do I calculate break-even jobs per week for a van?

Add up the van's weekly fixed costs, including the engineer and a share of overheads, then divide by the average contribution per job, which is price minus parts, fuel and other job-specific costs.

Should the engineer's wage be a fixed or variable cost?

For a salaried engineer, treat it as fixed: you pay it whether the diary is full or not. For a subcontractor paid per job or day, it is closer to a variable cost.

How often should we recalculate break-even?

Whenever a major cost or price changes, and at least once a year. Many firms keep separate winter and summer figures because the work mix changes.

Is an electric van cheaper to run for a heating firm?

It depends on daily mileage, charging access, local charges and the price difference on the lease. Run both options through the same break-even calculation for your actual area.

References

  1. GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑

  2. GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑

  3. Department for Transport (GOV.UK) (2026). Vehicle licensing statistics: April to June 2026 (opens in a new tab) ↑

  4. Department for Transport (GOV.UK) (2026). Vehicle licensing statistics: April to June 2026 (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo