Heat pumps low carbon

The Warm Homes Plan: what it means for heating firms

What the Warm Homes Plan funds, how its grant routes reach installers, the certification each needs and how to plan capacity and cash flow for it.

Ava research teamPublished 7 min read

On this page
  1. What the Warm Homes Plan is
  2. The routes that bring work to installers
  3. Which route fits your firm
  4. What installers need in place
  5. Customers calling about free heat pumps
  6. Partnering instead of going it alone
  7. Cash flow is the hidden constraint
  8. Worked Example: planning for 2027
  9. What to watch next
  10. Frequently asked questions
  11. References

Key takeaways

  • The Warm Homes Plan commits £15 billion of public investment to upgrade up to 5 million homes by 2030[1].
  • The government aims for over 450,000 heat pump installations a year by 2030[1], against almost 100,000 hydronic heat pumps sold in 2024[2].
  • Work reaches installers through several doors: the Boiler Upgrade Scheme, council-run Warm Homes: Local Grant, supplier-funded ECO and social landlord programmes.
  • Each door has its own installer requirements, so decide which you will go through before you spend on certification.
  • Plan cash flow for grant claims and council payment terms; growth on grant work can strain a small firm's bank balance.

What the Warm Homes Plan is

The Warm Homes Plan is the government's programme for upgrading homes in England through insulation, low-carbon heating and related measures. It commits £15 billion of public investment to upgrade up to 5 million homes by 2030[1]. It sets an aim of over 450,000 heat pump installations a year by 2030[1] and says the clean heat and energy efficiency transition could support up to 180,000 additional jobs by 2030[1].

For a heating firm, the headline numbers matter less than two practical questions: how does the money turn into jobs for someone like me, and what do I need to have in place to get them? The answer is different for each funding route, and the routes change more often than the headline does.

Heat pumps: 2024 sales against the 2030 ambition2030 aim from the Warm Homes Plan; 2024 sales figure (almost 100,000) from HHIC, listed in the references
Heat pumps: 2024 sales against the 2030 ambitionComparison. Hydronic heat pumps sold in 2024: 100,000; Installations a year aimed for by 2030: 450,000.100,000Hydronic heat pumps sold in 2024Hydronic heat pumps sold in 2024: 100,000450,000Installations a year aimed for by 2030Installations a year aimed for by 2030: 450,000Heat pumps: 2024 sales against the 2030 ambitionComparison. Hydronic heat pumps sold in 2024: 100,000; Installations a year aimed for by 2030: 450,000.100,000Hydronic heat pumps sold in 2024Hydronic heat pumps sold in 2024: 100,000450,000Installations a year aimed for by2030Installations a year aimed for by 2030: 450,000

Source: Department for Energy Security and Net Zero (GOV.UK), 2026[1]

Show the data
ItemValue
Hydronic heat pumps sold in 2024100,000
Installations a year aimed for by 2030450,000

The gap in the chart is the opportunity and the risk. Almost 100,000 hydronic heat pumps were sold in the UK in 2024[2]. Reaching the 2030 ambition means a several-fold increase in installs, which needs more trained people, more surveys and more firms ready to take grant-funded work. It also means the rules will keep shifting as schemes are adjusted to hit targets.

The routes that bring work to installers

Main funding routes for low-carbon heating work in England.
RouteWho it helpsHow the work reaches youWhat you usually need
Boiler Upgrade SchemeOwners of eligible homes in England and WalesThe customer chooses you; you apply on their behalf and the grant comes off their billMCS certification for the technology you fit
Warm Homes: Local GrantLower-income households in privately owned homes with EPC D to GCouncils survey homes and organise and pay for the workMeet the council's or its managing agent's procurement and quality rules
ECO4Households targeted by energy suppliers' obligationsSuppliers and their delivery partners commission installersRetrofit quality overseen by TrustMark; check partner requirements
Social landlord programmesSocial tenantsLandlords tender or use contractor frameworksFramework approval, insurances, health and safety records

The Boiler Upgrade Scheme lists £7,500 towards an air source or ground source heat pump[3], and until March 2027 homes heated by oil or LPG with no mains gas connection can get an extra £1,500[3]. The installer applies on the customer's behalf and the grant is taken off what the customer pays[4]. The Warm Homes: Local Grant is run by local councils; the household usually needs an income of £36,000 or less, an EPC of D, E, F or G, and a privately owned home, and the council organises and pays for the agreed work[5]. ECO4 is due to run until 31 December 2026 following a nine-month extension, with retrofit quality overseen by TrustMark[6].

Which route fits your firm

Most small heating firms already work the Boiler Upgrade Scheme route, because the customer relationship and the job stay theirs. The council and supplier routes bring volume but less control: someone else finds the customer, sets the specification and decides when you are paid. Social landlord work is steadier but sits behind frameworks and tenders.

  • Choose the Boiler Upgrade Scheme if you want to keep your own customers and margins and you can carry the grant until it is paid.
  • Approach councils and their managing agents if you have survey capacity and can work to someone else's specification and timetable.
  • Work with ECO delivery partners only after checking how and when they pay, and what happens to your money if the scheme rules change mid-job.
  • Pursue social landlord frameworks if you already have the insurances, health and safety systems and administrative capacity they ask for.

Do not certify for every route at once. Pick the one or two that match your customers and your cash position, and add others once the first are working.

What installers need in place

  1. Technical competence

    Heat pump training and, for split systems, F gas qualifications. Unvented hot water and electrical competence through your team or partners.

  2. Certification

    MCS for heat pumps under the Boiler Upgrade Scheme. TrustMark where retrofit quality schemes require it, as under ECO4[6].

  3. Design capability

    Room-by-room heat loss and emitter design you can defend; see design software options.

  4. Paperwork and records

    Commissioning records, handover packs, photographs and certificates in a form funders and auditors will accept.

  5. Insurance

    Public liability, and professional indemnity if you provide design. Check the cover limits each route asks for.

  6. Customer care

    A route for questions and complaints, and aftercare after handover.

Customers calling about free heat pumps

Every scheme announcement brings calls from people who have read that heat pumps are free, or that the government will pay for insulation. Most do not qualify for full funding, and some are better suited to a boiler. A short, honest qualifying script saves hours of wasted surveys.

  1. Ask how the home is heated now and whether it is on mains gas.
  2. Ask whether they own the home or rent, and who the landlord is if they rent.
  3. Ask whether they know the EPC rating or would like you to check the public register with them.
  4. Explain which route might apply, and say clearly that eligibility is decided by the scheme, not by you.
  5. Book a survey only where at least one route is realistic, and tell them what the survey costs, if anything.

Announcements tend to arrive in bursts, and the calls with them. If you cannot answer while on site, an AI Employee such as Ava can take these qualifying questions, log the answers and book surveys for the callers who fit, so your engineers phone back the right people first.

Partnering instead of going it alone

Small firms do not have to hold every certificate to take part. Many grant-funded jobs combine insulation, ventilation, electrical upgrades and heating, and no two-van heating business covers all of them. A loose partnership with an insulation installer, an electrician and a retrofit coordinator can bid for work none of you would win alone.

  • Agree who holds the customer relationship and who handles complaints before the first joint job.
  • Put the split of work, the programme and the payment terms in writing, even between friends.
  • Check that each partner’s certification covers the measures they deliver, and keep copies on file.
  • Decide whose insurance responds if a measure fails, and confirm the cover in writing.

Partnerships also help with the gaps between schemes. When one route pauses or changes its rules, a partner who works a different route can keep your engineers busy.

Cash flow is the hidden constraint

Grant-funded growth can starve a small firm of cash. You buy the heat pump, cylinder and materials, pay your engineers and subcontractors, and only then claim the grant or invoice the council or delivery partner. A firm doubling its heat pump volume can find itself funding several weeks of installs from its own bank balance.

  • Map how long each route takes to pay, from order to cash in the bank.
  • Take a customer deposit on the non-grant share where the route allows it.
  • Agree payment stages on larger council or landlord jobs.
  • Talk to your merchant about credit terms before the busy season, not during it.
  • Keep enough cash for at least a month of installs before taking on a big programme.

Worked Example: planning for 2027

Example (fictional): a five-engineer heating firm fitted 40 heat pumps in 2026, all through the Boiler Upgrade Scheme, alongside its boiler work. For 2027 it decides to aim for 70 heat pumps, keep boilers at the same level and approach its county council's managing agent for Local Grant work.

In the Example, it trains one more engineer in heat pumps, gives a senior engineer two days a week for surveys and design, and sets a rule that no more than a third of open jobs can be on routes that pay after completion. It also agrees with its merchant to stock two common heat pump sizes on account, which shortens lead times without tying up its own cash.

What to watch next

Scheme details change. ECO4 is due to end at the close of 2026[6], the off-gas uplift runs until March 2027[3], and the Warm Homes Plan confirmed plans to implement the Future Homes Standard in the first quarter of 2026[1], which shifts new-build heating towards low-carbon systems. Check the GOV.UK pages before quoting any grant, put dates in your diary for scheme deadlines, and keep your TrustMark and MCS records current so you can move quickly when a new route opens. For the ECO side specifically, see our guide to ECO and insulation schemes.

Frequently asked questions

What is the Warm Homes Plan?

The government's programme for upgrading homes with insulation and low-carbon heating, committing £15 billion of public investment to upgrade up to 5 million homes by 2030[1].

How do installers get Warm Homes: Local Grant work?

Councils run the scheme and organise and pay for the work[5], usually through their own procurement or a managing agent. Contact your council's energy or housing team to find out how they appoint installers.

Do I need MCS certification for grant-funded heat pumps?

GOV.UK tells Boiler Upgrade Scheme customers to get quotes from MCS certified installers, and the installer applies for the grant on their behalf[4]. Other routes set their own requirements, such as TrustMark for ECO4 retrofit work[6].

Is ECO4 ending?

Ofgem says ECO4 will run until 31 December 2026 following a nine-month extension[6]. Check with your delivery partners about jobs that will not complete before then.

References

  1. Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑

  2. Heating and Hotwater Industry Council (HHIC) (2024). Bumper year for UK heat pumps (opens in a new tab) ↑

  3. GOV.UK (2026). Apply for the Boiler Upgrade Scheme: what you can get (opens in a new tab) ↑

  4. GOV.UK (2026). Apply for the Boiler Upgrade Scheme: how to apply (opens in a new tab) ↑

  5. GOV.UK (2026). Apply for the Warm Homes: Local Grant (opens in a new tab) ↑

  6. Ofgem (2026). Energy Company Obligation (ECO) (opens in a new tab) ↑