Metrics growth

Revenue per engineer: measuring productivity

Measure revenue per engineer and billable utilisation in a heating firm: the hours waterfall, a worked Example and the levers that add sold hours.

Ava research teamPublished 7 min read

On this page
  1. Two numbers, two different questions
  2. Paid hours are the starting point
  3. The hours waterfall
  4. Example: one engineer's year
  5. Collecting the data without a tracker
  6. Levers that add sold hours
  7. Reading revenue per engineer over time
  8. Self-employed and subcontract engineers
  9. Where it fits with your other numbers
  10. Frequently asked questions
  11. References

Key takeaways

  • Employee plumbers and heating installers work a median of 40 paid hours a week, more than the 36.9 for all employees[1]; the question is how many of those hours are sold.
  • Build an hours waterfall: paid hours, minus holiday, training and sickness, minus travel, parts runs and paperwork, equals billable hours.
  • Statutory holiday alone removes 5.6 weeks a year[2] before any travel or admin time is counted.
  • Price from billable hours, not paid hours, and include employer National Insurance and pension in the hourly cost[3][4].
  • The biggest levers are travel, parts and return visits, not asking engineers to work longer.

Two numbers, two different questions

Revenue per engineer is total turnover divided by the number of full-time-equivalent engineers. It answers a broad question: is the team, as a whole, producing enough income for the size of the business? It is useful for comparing years and for deciding whether adding an engineer has paid off.

Billable utilisation is the share of an engineer's paid hours that end up on an invoice. It answers a narrower and more useful question: where does the time go? Two firms can have the same revenue per engineer, one through high utilisation at modest rates and the other through low utilisation at high rates with expensive parts. Only utilisation tells you which lever to pull.

Use labour revenue, not total revenue, when you compare engineers with each other. Materials pass through the business and can make an engineer who fits a lot of boilers look more productive than one who spends the week fault-finding on older systems.

Median total paid hours per week, 2026Annual Survey of Hours and Earnings, provisional
Median total paid hours per week, 2026Comparison. Employee plumbers and heating installers: 40 hours; All employees: 36.9 hours.40 hoursEmployee plumbers and heating installersEmployee plumbers and heating installers: 40 hours36.9 hoursAll employeesAll employees: 36.9 hoursMedian total paid hours per week, 2026Comparison. Employee plumbers and heating installers: 40 hours; All employees: 36.9 hours.40 hoursEmployee plumbers and heatinginstallersEmployee plumbers and heating installers: 40 hours36.9 hoursAll employeesAll employees: 36.9 hours

Source: Office for National Statistics, 2026[1]

Show the data
ItemValue
Employee plumbers and heating installers40 hours
All employees36.9 hours

Official earnings data put the median paid hours of employee plumbers and heating and ventilating installers at 40 a week in 2026, against 36.9 for all employees[1]. Full-time employees in the trade had median gross weekly pay of £782.50 in April 2026, up 4.3% on a year earlier[5], and the median hourly rate for all employee plumbers was £18.82[6].

Those figures describe what engineers are paid, not what they produce. To find out what each paid hour needs to earn, you have to work out how many of them are billable and what each one really costs once on-costs are added.

The hours waterfall

Work through one engineer's year step by step. Use your own records where you have them and honest estimates where you do not, then refine the estimates as job data builds up.

  1. Start with contracted hours

    Weekly paid hours multiplied by 52. Include regular paid overtime if it is part of how the firm works in winter.

  2. Take off holiday

    Almost all workers are entitled to 5.6 weeks' paid holiday a year[2]. Check whether your contracts include bank holidays in that figure.

  3. Take off training and sickness

    Gas Safe assessments, manufacturer courses and toolbox talks, plus an allowance for sickness based on last year.

  4. Take off travel

    Time between the yard or home and the first job, between jobs, and back. Your tracker or job timestamps will show this better than memory.

  5. Take off parts and merchant time

    Collecting parts, waiting at the counter and returning items. This is often bigger than owners expect.

  6. Take off paperwork and waiting

    Job sheets, certificates, photos, calls to the office and time waiting for access or for a customer to decide.

  7. What remains is billable

    Divide by paid hours to get utilisation. Track it monthly per engineer and for the team.

Example: one engineer's year

Example: a fictional employed engineer in a Sheffield firm is paid for 40 hours a week, giving 2,080 paid hours a year. Holiday of 5.6 weeks removes 224 hours. Training and sickness take another 64 hours, leaving 1,792 hours available for work.

Example hours waterfall for one engineer (fictional figures)
LineHoursShare of paid hours
Paid hours (40 x 52)2,080100%
Holiday (5.6 weeks)-22411%
Training and sickness-643%
Travel between jobs-33016%
Parts and merchant runs-1507%
Paperwork, calls and waiting-1206%
Billable hours1,19257%

Example costs: a salary of £39,000, employer National Insurance at 15% on earnings above £5,000[3] adding about £5,100, a minimum employer pension contribution of 3%[4] adding roughly £1,000, and van, fuel, tools, insurance and phone costing a further £11,000. The total of about £56,100 spread over 1,192 billable hours is roughly £47 per billable hour before overheads such as the office, software and the owner's time.

Example reading: if the firm's hourly labour rate is £60, each billable hour contributes about £13 towards overheads and profit. Raising utilisation from 57% to 62% adds about 98 billable hours a year, worth around £5,900 in labour income from the same engineer, without a single extra hour on the clock.

Collecting the data without a tracker

Many small firms have no vehicle tracking and no time-stamped job app. You can still build a usable waterfall in a fortnight.

  1. Ask each engineer to note arrival and departure times on every job for two normal weeks, on the job sheet or in a phone note.
  2. Note every merchant visit and how long it took, including queueing.
  3. Add up the evening paperwork time honestly, including certificates and photos sent to the office.
  4. Compare the totals with the hours invoiced in the same fortnight.
  5. Repeat the exercise in a winter fortnight and a summer one, because the pattern changes with the work mix.

Explain why you are doing it. Engineers who think the exercise is about catching them out will round their times; engineers who know it is about fixing parts runs and travel will give you better numbers than any tracker.

Levers that add sold hours

  • Zone the diary: group routine work by area so engineers spend more of the day on site. Keep a slot free in each zone for emergencies rather than criss-crossing the county.
  • Stock the vans properly: the parts that cause return visits on your common boilers should travel with the engineer. Agree the list with the engineers who use it.
  • Use merchant delivery or click-and-collect for planned jobs so parts arrive before the engineer does.
  • Triage better on the phone: boiler make and model, fault codes, photos of the problem and access details let the engineer arrive prepared.
  • Cut paperwork: digital job sheets and certificates completed on site, with photos attached, remove evening admin and double entry.
  • Confirm appointments the day before so fewer visits end with nobody home.

Do not chase utilisation by squeezing safety checks, rushing commissioning or cutting breaks. The return visits and complaints that follow destroy far more sold hours than they save.

Reading revenue per engineer over time

Calculate revenue per engineer quarterly and annually, using full-time equivalents: an engineer who works three days a week counts as 0.6. Look at the trend rather than the level. A rising figure with stable margin usually means better scheduling or a better work mix. A rising figure with falling margin usually means more materials are passing through, or prices have not kept up with costs.

When revenue per engineer falls after a hire, that is normal for a few months while the new engineer learns your systems and customers. If it has not recovered within two quarters, look first at whether the diary has enough work for the extra person, and second at whether the new engineer is being sent on the jobs nobody else wants.

Discuss utilisation with each engineer privately, as a shared problem to solve. Engineers know where their day goes, and they usually know the fix: a better parts list, a different start point, fewer jobs across town. Publishing league tables rarely helps and often damages trust.

Self-employed and subcontract engineers

If you use self-employed engineers on a day rate, the waterfall still matters, but the cost side changes. You pay for days, not for holiday, sickness or pension, so the cost per billable hour depends on how many of their paid hours you can fill. A subcontractor on a day rate who spends half the day travelling between scattered jobs costs you as much as a full day on site.

Track their billable hours in the same way and compare the cost per billable hour with that of an employed engineer. The comparison is often closer than owners expect once employed on-costs and subcontractor travel are both counted.

Where it fits with your other numbers

Revenue per engineer sits alongside diary utilisation and lead times, which shows whether there is enough booked work to fill the billable hours, and gross margin, which shows whether the hours are sold at a profitable price. Put all three on your monthly business review page.

Before you hire, check the waterfall for your current team. Often a few percentage points of utilisation recovered from travel and parts runs give the capacity that looked like it needed another salary and another van.

Frequently asked questions

What is a good utilisation rate for a heating engineer?

There is no reliable published benchmark for UK heating firms. Build your own hours waterfall, measure it monthly and aim to improve it by reducing travel, parts runs and return visits.

Should revenue per engineer include materials?

Use total revenue for the business-level figure and labour revenue when comparing engineers. Materials can make one engineer look more productive simply because of the work they are given.

How do I count part-time engineers?

Use full-time equivalents. Someone working three days a week in a five-day firm counts as 0.6 of an engineer.

Does holiday count as paid time in the calculation?

Yes. Holiday is paid but not billable, which is why it comes off in the hours waterfall before you calculate utilisation and the cost of a billable hour.

References

  1. Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑

  2. GOV.UK (2026). Holiday entitlement (opens in a new tab) ↑

  3. GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑

  4. GOV.UK (2026). Workplace pensions: what you, your employer and the government pay (opens in a new tab) ↑

  5. Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑

  6. Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo