Key takeaways
- ‘Too expensive’ is a symptom, not a verdict. Find out which of four things the customer means before you answer.
- Ask two or three questions first; the answer you give to ‘more than I expected’ is different from the answer to ‘more than the other quote’.
- Explain value through what the job includes, the warranty and the paperwork, not by criticising another firm.
- Employee plumbers earn close to the national median hourly rate[1]; the price gap is in the overheads that keep a firm legal and insured.
- Change the scope or the options, not the price, when a customer cannot stretch to the full job.
What ‘too expensive’ usually means
When a customer says your quote is too expensive, they are rarely making a final decision. They are telling you that something does not add up for them yet. In practice it tends to mean one of four things, and each needs a different reply.
| What they mean | Typical words | What to ask | What not to do |
|---|---|---|---|
| More than I expected | ‘I thought it would be about half that’ | ‘What were you expecting, and where did that figure come from?’ | Defend every line before you know their reference point |
| More than another quote | ‘The other chap was much cheaper’ | ‘Can you tell me what was included in theirs?’ | Say the other firm is a cowboy |
| More than I can pay now | ‘We just don't have that right now’ | ‘Is it the total, or paying it all at once?’ | Drop the price straight away |
| I don't see the value | ‘It's only a boiler’ | ‘What matters most to you about the new system?’ | List technical specs they did not ask about |
Listen for the reference point. A customer who has seen a national firm's online price, a neighbour's job from five years ago or a figure on a forum is comparing you with something specific. Until you know what, any explanation is guesswork.
Questions before answers
Most price conversations go wrong because the tradesperson starts justifying straight away. A calm question buys time and gives you the information you need.
- ‘Thanks for being straight with me. Which part feels high: the total, or something in particular?’
- ‘What were you comparing it with?’
- ‘If price weren't an issue, is this the system you'd want?’
- ‘Is there a budget you were working to? If so, I can show you what fits it.’
The third question is the most useful. If the answer is yes, you are discussing money, and you can talk about scope, timing or staged payment. If the answer is no, the customer has doubts about the job itself, and price is the polite way of saying so.
Scripts that show value without knocking anyone
Restate what they get
‘Just so we're comparing the same thing: this includes the boiler, a new flue, a magnetic filter, a system flush, new controls, removal of the old unit, registration and the manufacturer warranty.’
Name the risk you remove
‘The flush and filter are there because sludge from the old system is the most common reason new boilers fail early. Leaving them out would make the price lower and the boiler's life shorter.’
Make comparison easy
‘If you've got another quote, I'm happy to go through it with you line by line. If they include the same things for less, you should take it.’
Offer a choice, not a discount
‘If the total is the issue, I can do it with standard controls instead of the smart thermostat, which brings it down. Everything that matters for safety and the warranty stays.’
Ask for the decision
‘Does that make sense of the difference? If you're happy, I can hold the installation date we talked about until Friday.’
Offering to review a rival quote line by line sounds risky, but it signals confidence and usually reveals missing items. For a deeper method, see the guide on comparing a cheaper quote like for like.
Where the money actually goes
Customers often assume a high quote means high wages. The official figures say otherwise. The median employee plumber or heating installer earned £18.82 an hour in 2026, slightly below the £19.00 median for all UK employees[1].
Source: Office for National Statistics, 2026[1]
Show the data
| Item | Value |
|---|---|
| Plumbers and heating installers | £18.82 |
| All employees | £19 |
The difference between an hourly wage and the rate a firm has to charge comes from costs the customer never sees. Employers pay 15% secondary National Insurance on earnings above £5,000 a year[2], at least 3% into a workplace pension[3], and almost every worker is entitled to 5.6 weeks of paid holiday[4]. On top of that sit the van, fuel, tools, insurance, training, registration and the hours spent on quotes and paperwork that nobody pays for directly.
You do not need to show a customer your accounts. One plain sentence is often enough: ‘About half of what you pay goes on the engineer's time; the rest keeps us insured, registered, equipped and able to come back if anything goes wrong.’ Only use a split like that if it is roughly true for your business.
Use the paperwork as part of the value
Legal and registration duties apply to every firm, but customers do not always know whether a cheaper quote covers them. Work on a gas fitting must be done by someone in a class approved by HSE, in practice Gas Safe registered[5]. When an installer is registered with a competent person scheme, the homeowner does not need to arrange building regulations approval themselves[6].
- Say who will be on site and that their Gas Safe card can be checked.
- Explain that you notify the work and the customer receives the certificate.
- Point out the warranty length and who the customer calls if there is a problem.
- Mention that every service contract carries a legal duty of reasonable care and skill[7], and explain how you meet it: photos, commissioning records, a tidy finish.
Example: a combi swap objection on the phone
Example (fictional): Mrs Patel received a written quote for a combi replacement and rang back. ‘It's more than I thought. My sister paid much less.’ The owner asked when that was and what was included. It turned out her sister's job was six years ago, kept the old flue and had no filter or flush.
The owner did not cut the price. He explained what had changed since then, why the flue had to be replaced on this property, and offered two options: the full quote, or the same boiler with simpler controls for a lower total. She chose the full quote, paid a deposit and booked the date. The conversation took eight minutes because he asked before he explained.
Three objections that need their own answer
Some versions of ‘too expensive’ come up so often that it is worth agreeing a house answer, so that everyone in the firm, including whoever answers the phone, says the same thing.
- ‘Can you knock something off for cash?’ The honest answer protects you: ‘Every job goes through the books and gets a proper invoice and warranty registration, so the price is the same however you pay.’ A cash discount that avoids tax is a risk you carry, and it removes the paper trail the customer needs if something goes wrong.
- ‘Why do you charge to come out when others don't?’ Explain what the visit includes, such as diagnosis time and the first part of the work, and whether the charge is deducted from the job if they go ahead. Customers object less to a fee they understand than to one that appears on the invoice without warning.
- ‘Just give me a rough price over the phone.’ Give a range only for jobs you can genuinely price unseen, say what would move it up or down, and offer a survey for anything else. A firm number given blind becomes the figure they hold you to.
Write these answers down and review them every few months. If one of them is failing repeatedly, that tells you something about your pricing structure, not just your wording.
Follow up in writing after the conversation
A price conversation that ends with ‘I'll think about it’ should be followed by a short written message the same day. It gives the customer something to show a partner and keeps the details accurate.
- Thank them and restate the option they seemed most interested in.
- List the two or three things that are included which matter most to them, in their words, not yours.
- Say how long the quote and the installation date are held for.
- Ask one clear question: ‘Would you like me to pencil in the 14th while you decide?’
Keep it under a hundred words. Long follow-ups read as pressure; short ones read as service.
When to let the job go
Not every objection should be overcome. Walk away politely when:
- The only way to meet the price is to remove something needed for safety, compliance or the warranty.
- The customer wants a written discount before any discussion of scope.
- You would be working below your own minimum margin with no repeat or referral value.
- The customer has already been rude about your time or other trades.
A polite close keeps the door open: ‘I understand. If you'd like me to look at it again, or the other job falls through, give me a ring. The quote stands for 30 days.’
Frequently asked questions
Should I lower my price when a customer says it's too expensive?
Not as a first move. Ask what they are comparing it with and whether the issue is the total or paying it in one go. Reduce scope or offer options before you reduce the price.
How do I respond to a much cheaper competitor quote?
Offer to go through it line by line. Check boiler model, flue, filter, flush, controls, removal, registration and warranty. If it genuinely includes the same for less, say so and let the customer decide.
Is it worth explaining my overheads to customers?
Briefly, yes. One sentence about insurance, registration, vans and aftercare helps. Engineers' pay is close to the national median[1], which many customers do not expect.
What should I never remove to hit a price?
Anything needed for safety, building regulations notification or the manufacturer warranty, such as a required flue change, system cleaning or correct gas pipework.
References
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑
GOV.UK (2026). Rates and thresholds for employers 2026 to 2027 (opens in a new tab) ↑
GOV.UK (2026). Workplace pensions: what you, your employer and the government pay (opens in a new tab) ↑
GOV.UK (2026). Holiday entitlement (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 3 (opens in a new tab) ↑
GOV.UK (2026). Building regulations approval (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 49 (opens in a new tab) ↑