Heat pumps low carbon

The Future Homes Standard: impact on heating installers

The Future Homes Standard for heating firms: new-build heating, servicing new homes, lessons from the condensing boiler rule and what to do now.

Ava research teamPublished 6 min read

On this page
  1. Where the standard stands
  2. What changes inside a new home
  3. What the last big rule change tells us
  4. Who is affected, and how
  5. Keep new build in proportion
  6. Working with developers under the new rules
  7. Winning the service work on new estates
  8. The compliance side
  9. Worked Example: a firm that fits plots for a regional builder
  10. What to do in the next six months
  11. Frequently asked questions
  12. References

Key takeaways

  • The government published its response to the Future Homes and Buildings Standards consultation in March 2026, to be implemented through a statutory instrument and new approved documents[1].
  • New homes are moving to low-carbon heating, which mainly means heat pumps, low flow temperatures and hot water cylinders.
  • Rule changes reshape the market slowly but completely: combi boilers went from 2% of English homes in 2001 to 63% in 2024[2].
  • Most heating firms will feel the change first through servicing and repairs in new homes, not through new-build contracts.
  • Read the approved documents yourself, and check transitional arrangements before advising any self-builder or developer.

Where the standard stands

The Future Homes Standard is the next step in Building Regulations for new homes in England, aimed at reducing the carbon emissions of new homes and non-domestic buildings[1]. The Warm Homes Plan confirmed plans to implement it in the first quarter of 2026[3], and the government's response to the 2023 consultation was added to GOV.UK on 24 March 2026. The outcomes are being implemented through a statutory instrument and new approved documents[1].

That last point matters for installers. Summaries in trade press and on social media are useful, but the rules you will be held to are in the approved documents and the regulations, including the transitional arrangements that decide which sites are built to the old rules and which to the new. Read them, or have someone in your firm own them, before advising a developer or self-builder.

If a developer asks what heating a new site needs, ask which regulations the site was registered under before you answer. Transitional arrangements can mean neighbouring sites are built to different standards.

What changes inside a new home

The consultation's specification options were built around low-carbon heating, principally heat pumps, alongside better fabric and ventilation. For a heating engineer, a typical new home under the standard looks different from the homes most of us trained on:

  • A heat pump, or a connection to a heat network where one exists, instead of a gas boiler.
  • Low flow temperatures, which means larger radiators or underfloor heating throughout.
  • A hot water cylinder, often in a cupboard designed around it, and a high-temperature cycle to manage legionella risk.
  • Controls designed for long, steady running rather than short bursts of heat.
  • Tighter, better-insulated buildings where small design errors show up as overheating or poor comfort.
  • More interaction with solar PV, batteries and smart tariffs.

None of this is exotic for a firm already fitting heat pumps in existing homes. It is a shock for a firm whose new-build work has been fitting the same combi in every plot. Our guides to solar PV diverters and solar thermal cover the hot water add-ons new homes often include.

What the last big rule change tells us

Heating engineers have been here before. Condensing boilers have been mandatory for new and replacement boilers in England since the mid-2000s[2]. At the time there were warnings about reliability, condensate pipes freezing and customer resistance. Two decades later, 63% of homes in England have a condensing combination boiler and 19% another condensing boiler, up from 2% and 1% in 2001[2].

Boiler types in English homes, 2001 and 2024Share of homes; English Housing Survey
Boiler types in English homes, 2001 and 2024Column chart. Condensing combination boiler: 2001 2%, 2024 63%; Other condensing boiler: 2001 1%, 2024 19%.0%20%40%60%80%Condensing combination boiler · 2001: 2%2%Condensing combination boiler · 2024: 63%63%Condensing combination boilerOther condensing boiler · 2001: 1%1%Other condensing boiler · 2024: 19%19%Other condensing boilerBoiler types in English homes, 2001 and 2024Column chart. Condensing combination boiler: 2001 2%, 2024 63%; Other condensing boiler: 2001 1%, 2024 19%.Condensing combination boilerCondensing combination boiler · 2001: 2%2%Condensing combination boiler · 2024: 63%63%Other condensing boilerOther condensing boiler · 2001: 1%1%Other condensing boiler · 2024: 19%19%
  • 2001
  • 2024

Source: Ministry of Housing, Communities and Local Government (GOV.UK), 2024[2]

Show the data
Item20012024
Condensing combination boiler2%63%
Other condensing boiler1%19%

The lesson is that a rule change does not move the market overnight, but it moves it completely. Firms that learned condensing boilers early won the work; firms that waited spent years catching up. The Future Homes Standard applies to new homes rather than replacements in existing homes, so the shift will be slower in your service list, but it will arrive through every new estate in your area.

Who is affected, and how

Example impact by type of heating firm.
Type of firmHow it is affectedWhat to do now
New-build subcontractorDirectly: plots move to heat pumps and cylindersTrain in heat pump install and commissioning; talk to your developers about specifications
Service and repair firmGradually: new homes need heat pump servicing and repairsAdd heat pump servicing skills; target new estates once warranty periods end
Renovation and extension firmIndirectly: customers see new-build specs and ask for themBe ready to quote heat pump-ready designs and low-temperature emitters
Boiler replacement specialistLeast directly: existing homes are not covered by the new-build standardKeep an eye on wider policy; build heat pump survey skills anyway

For most small heating firms the biggest effect will come through servicing. Every new estate built to the standard is a few hundred heat pumps that will need annual services, repairs and eventually replacements. Developers' warranty arrangements cover the first years; after that, homeowners look for a local firm that knows the systems.

Keep new build in proportion

New-build work is volatile. In August 2026, construction repair and maintenance output grew by 0.4% while new work fell by 0.7%[4]. Most heating firms earn their living from existing homes, and that will stay true for many years. Treat the Future Homes Standard as a signal of where skills and servicing demand are heading, not as a reason to chase developer contracts you are not set up for.

Working with developers under the new rules

Before you quote a developer for heat pump plots, ask: who owns the design, which house types and sites are covered, what commissioning time they expect, who handles first-winter settings calls, and how quickly they pay against completed plots. The answers decide whether the contract will make money.

  1. Clarify design responsibility

    Find out who designs the heating: the developer's consultant, the manufacturer or you. If it is you, price the design and check your professional indemnity cover.

  2. Agree the specification early

    Unit sizes, emitter types, cylinder size and location, controls and any PV interaction should be fixed before first fix.

  3. Plan commissioning properly

    Heat pumps need careful commissioning and settings checks. Build the time into your rates rather than squeezing it on handover day.

  4. Prepare the handover for buyers

    Most buyers will never have lived with a heat pump. A clear one-page guide reduces callbacks far more than any extra visit.

  5. Price the callbacks

    Expect more first-winter calls than you get with boilers. Agree who pays for settings visits that are not faults.

Winning the service work on new estates

The quiet opportunity is the second owner of a new home, or the first owner once the developer’s warranty arrangements end. They have a heat pump they did not choose, a handover pack they may have lost and no idea who to call. A local firm that already understands the systems fitted on that estate is well placed.

  • Find out which manufacturers and models the main local developers fit, and get trained on them.
  • Keep a short guide for each common system: settings, typical faults and where the controls hide.
  • Offer a first visit for new owners that checks settings, explains the system and records its condition.
  • Make your website and phone line clear that you service heat pumps in new homes, naming the estates you already work on where customers agree.

This work arrives gradually, house by house, and it is hard for out-of-area competitors to take from you once you are known on an estate.

The compliance side

Installing or replacing a heating system can need Building Regulations approval in England[5], and homeowners do not need approval themselves if they use an installer registered with a competent person scheme[5]. On new build, compliance is usually handled through the developer's building control route, but your commissioning records, certificates and test results feed into it. Keep them complete, signed and stored against each plot.

Worked Example: a firm that fits plots for a regional builder

Example (fictional): a six-engineer firm fits combis and radiators on about 120 plots a year for a regional housebuilder. The builder tells them that sites registered after the transitional deadline will use air source heat pumps with cylinders.

In the Example, the firm trains three engineers in heat pump installation, agrees that the manufacturer will provide design for the standard house types, and prices commissioning and a first-winter settings visit into each plot. It also offers buyers a service plan at handover. By the second year, the plan customers from new estates make up a growing share of its service list, which evens out the gaps between phases of new-build work.

What to do in the next six months

  1. Read the government response and the new approved documents, or assign someone to.
  2. Ask each developer you work for which sites fall under which standard.
  3. Get at least one engineer trained and confident in heat pump commissioning.
  4. Build a standard handover pack for heat pump homes.
  5. Add heat pump servicing to your service offer and price it.
  6. Keep doing excellent work on existing homes, which is still where most of the business is.

Frequently asked questions

Does the Future Homes Standard ban gas boilers?

It is a standard for new homes in England aimed at reducing their carbon emissions[1], and its specifications are built around low-carbon heating such as heat pumps. Check the approved documents for exactly what is permitted on a given site.

Does the Future Homes Standard apply to existing homes?

No. It applies to new homes. Work on existing homes is covered by other parts of the Building Regulations.

When does the Future Homes Standard take effect?

The government response was published in March 2026 and is being implemented through a statutory instrument and new approved documents[1]. Transitional arrangements decide which sites are built to the new rules.

What should heating installers do to prepare?

Train in heat pump installation and commissioning, ask developers which sites fall under the new rules, and add heat pump servicing to your offer.

References

  1. Ministry of Housing, Communities and Local Government (GOV.UK) (2026). The Future Homes and Buildings Standards: 2023 consultation (government response) (opens in a new tab) ↑

  2. Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Housing Survey 2024 to 2025: Chapter 2, energy efficiency (opens in a new tab) ↑

  3. Department for Energy Security and Net Zero (GOV.UK) (2026). Warm Homes Plan (opens in a new tab) ↑

  4. Office for National Statistics (2026). Construction output in Great Britain: August 2026 (opens in a new tab) ↑

  5. GOV.UK (2026). Building regulations approval (opens in a new tab) ↑