Key takeaways
- Raise prices on a timetable, not in a panic: once a year, with notice, tied to dates customers recognise.
- April is a natural point: the National Living Wage rises from £12.71 to £13.21 an hour in April 2027[1].
- Only customers with an ongoing arrangement need a letter: service plans, landlords, agents and commercial accounts.
- Keep the notice factual. If you mix in promotions, marketing consent rules can apply[2].
- Honour every written quote within its validity period; the new prices apply to new quotes.
Signs it is time to put prices up
Most small plumbing and heating firms raise prices too rarely and then by too much at once, usually after a bad quarter. A yearly review is easier on customers and on cash flow. Before you decide on a figure, look at the evidence from your own business.
- Your costs have moved: merchant prices, van and fuel costs, insurance renewals and wages.
- You win almost every quote you send on competitive work, which suggests your price is below what local customers expect to pay.
- Your diary is full several weeks ahead and you are turning down work you would like to do.
- Your margin on completed jobs has drifted down even though the work itself has not changed.
- You have not changed your prices for more than a year.
Wage costs alone justify a review for most employers. Median gross weekly pay for full-time employee plumbers and heating and ventilating installers was £782.50 in April 2026, up 4.3% on the year[3]. If your engineers' pay has kept pace and your prices have not, the gap is coming out of your profit.
Work out the new figure from your costs
A round percentage applied to everything is easy to announce but rarely right. Different services carry different cost mixes: a boiler service is almost all labour and travel, a boiler installation is heavy on materials, and an emergency call-out is mostly the cost of being available. Price each group separately.
- List your main services and, for each, the share of the price that is labour, materials and travel.
- Apply your actual cost increases to each share: the pay rise you have given or plan to give, your merchant's price changes and your fuel and insurance renewals.
- Add the result to your current price, then round to a figure that is easy to say on the phone.
- Check the new figure against your quote win rate. If you were winning nearly every competitive quote, there is room to go a little further; if you were already losing on price, stay close to your cost increase.
Example: a fictional firm's annual service is 80% labour and travel and 20% parts and consumables. Labour costs have risen by 4% and parts by 6%. The weighted rise is a little over 4%, so the owner rounds the service price up to the next whole pound rather than applying the 10% he had in mind.
Pick a date customers will understand
Timing matters as much as the figure. A rise that lands in the middle of a cold snap, when customers are anxious about their heating, feels opportunistic. A rise announced well in advance and tied to a known date feels like ordinary business.
Source: GOV.UK, 2026[1]
Show the data
| Item | Value |
|---|---|
| From April 2026 | £12.71 |
| From April 2027 | £13.21 |
April works for many firms because it is when statutory pay rates change: the National Living Wage rises to £13.21 an hour from April 2027[1], and the apprentice rate rises from £8 to £8.31[4]. Even if you pay well above those rates, customers recognise April as the point where costs go up. January is the other common choice, especially for firms that run service plans on a calendar year.
Give at least 30 days' notice to anyone with an ongoing arrangement, and more if their contract says so. Check your service plan and account terms before you write anything; if they set out how and when prices can change, follow them exactly.
Who needs to be told, and how
| Customer type | Do they need notice? | How |
|---|---|---|
| One-off domestic customers | No; new prices apply to new quotes | Update your quote template and website |
| Customers with an open written quote | No change while the quote is valid | Honour the quote; new prices from expiry |
| Service plan members | Yes, under the plan terms | Letter or email with the renewal or change date |
| Landlords and letting agents | Yes, if you have agreed rates | Email to the named contact with the new rate card |
| Commercial accounts | Yes, as the contract requires | Formal letter referring to the contract clause |
Do not change the price on a quote a customer already holds. Anything you have said or written to a consumer about the service that they rely on can become part of the contract, and where no price has been agreed the customer only has to pay a reasonable one[5]. Clear validity dates on every quote protect both sides.
What to put in the letter
Say what is changing and when
Lead with the facts: the service or rate, the old and new figures, and the date. Customers dislike having to hunt for the number.
Give one honest reason
Wages, materials, insurance or fuel. One sentence is enough. Long justifications sound defensive.
Say what stays the same
Same engineers, same response promise, same warranty. This reassures regular customers that nothing else is getting worse.
Offer a way to lock in
If it suits you, let customers book or renew before the change date at the old rate. It brings work forward and rewards loyalty.
Make it easy to ask a question
Give a named person and a direct number or email, not a general inbox.
Template: ‘Dear Mr Hughes, from 1 April our annual boiler service will be £X (currently £Y). Like most firms, our wage, insurance and parts costs have gone up over the past year, and we have held our prices since last spring. Nothing else changes: the same engineers, the same reminder before your service is due, and the same call-back promise if anything goes wrong. If you would like to book your next service before 1 April, we will keep it at the current price. Any questions, ring me directly on 01632 960 123. Best wishes, Sam.’
Keep the notice a service message
A factual notice about the price of a service a customer already has with you is an ordinary business communication. Once you add offers, upsells or a newsletter, it starts to look like direct marketing. Direct-marketing emails and texts to individuals need prior consent, unless the soft opt-in applies to existing customers[2].
The simplest approach is to keep the price notice on its own and send any promotional message separately, only to people you are allowed to market to. That also keeps the price letter short, which helps it get read.
Handling pushback
Most customers say nothing. A few will ring, and the conversation usually falls into one of three kinds.
- ‘Why so much?’ Restate the reason in one sentence, then ask what matters to them. ‘Our costs have gone up, mainly wages. Is it the service price that worries you, or the repairs?’
- ‘I'll go elsewhere.’ Do not argue. ‘I understand. If you do, make sure they check the flue and register the work. We'd be glad to have you back.’
- ‘Can I keep the old rate?’ Offer the lock-in you set out in the letter, and nothing more. Exceptions for the loudest customers are unfair to the quiet ones.
Write down every reply you receive. If several customers point at the same item, the problem may be how that service is packaged rather than its price.
Update everything on the same day
Nothing undermines a price change faster than a customer finding the old figure somewhere else. Make a short list and change it all at once on the effective date.
- Quote and invoice templates in your job software.
- Website pages, including any price guides or FAQs.
- Directory and marketplace listings that show prices.
- Whatever your phone answering script or call handler says when a caller asks about prices.
- Service plan documents and renewal letters.
Example: a firm that had not changed prices for two years
Example (fictional): a heating firm in Norwich with 400 service customers had held its service price for two years. Rather than one large jump, the owner raised it once with eight weeks' notice, explained it as wage and insurance costs, and offered the old price to anyone who booked before the change. About a fifth of customers booked early, which filled a quiet February. Only a handful left, and the extra margin on the rest more than covered them.
Mistakes that cause complaints
- Changing the price on a quote the customer already holds.
- Announcing the change on an invoice after the work is done.
- Burying the new figure in a long email full of offers.
- Raising prices in the middle of winter for customers whose heating has just failed.
- Making private exceptions that other customers later hear about.
A price rise handled calmly and on time rarely loses good customers. It is the surprise, not the size, that most people object to.
Frequently asked questions
How much notice should I give customers of a price increase?
At least 30 days for anyone with an ongoing arrangement, or whatever your plan or contract terms set out. One-off customers simply get the new prices on new quotes.
Do I have to honour an old quote after a price rise?
Yes, for as long as the quote says it is valid. Put a clear validity period on every quote so that you are not locked in indefinitely.
Can I send a price increase notice by text?
Yes, as a service message to customers with an ongoing arrangement. Keep promotions out of it, because marketing texts need consent or the soft opt-in[2].
Is it better to raise prices a little every year or a lot occasionally?
A little every year. Regular small changes tied to a known date cause fewer complaints and keep your margin steady.
References
GOV.UK (2026). National Minimum Wage and National Living Wage rates (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2003). The Privacy and Electronic Communications (EC Directive) Regulations 2003, regulation 22 (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14 (occupation by 4-digit SOC 2020) (opens in a new tab) ↑
GOV.UK (2026). National Minimum Wage and National Living Wage rates (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2015). Consumer Rights Act 2015, section 51 (opens in a new tab) ↑